Final Project:
From the Simulations Menu at the top of the
screen, Select the Batch Mixing Simulation.
Using your knowledge
of PLC counters, design a program to meet the following requirements:
When the 3 position Selector Switch is in
position "A".
When the 3 position Selector Switch is in position "B".
·
the batch mixing process will run in a 3-batch mode. The operator
may start the batch mix sequence by momentarily pressing the Start Switch.
o The tank is to
be filled with a mixture obtained from the separate fill lines utilizing fill
pumps P1 and P2. The tank is to be filled to the point where the Hi-Level
sensor goes true.
o When filling is
complete, the Full light will turn On. Heater O:2/04 and Mixer O:2/00 will be
started allowing the mixture to begin heating. Thermostat I:1/02 will be
employed to control the temperature.
o The mixer will
continue to run for 4 seconds after the mixture reaches the desired
temperature. When the mixer stops, pump P3 will be used to drain the product
from the tank. The tank will be drained to the point where the Lo-Level sensor
trips.
o Once emptied, the
batch 2 starts
o The process
will end after 3 batch
While testing, utilize the "Reset
Simulation" and the "Reset Timers and Counters" entries in the
Simulations menu to re-start your program.
Sun | Mon | Tue | Wed | Thu | Fri | Sat |
---|---|---|---|---|---|---|
27 | 28 | 29 | 30 | 1 | 2 | 3 |
4 | 5 | 6 | 7 | 8 | 9 | 10 |
11 | 12 | 13 | 14 | 15 | 16 | 17 |
18 | 19 | 20 | 21 | 22 | 23 | 24 |
25 | 26 | 27 | 28 | 29 | 30 | 31 |