Suggest the prototyping technique you would use for this system and support your rationale. Create a management plan containing eight to ten (8-10) stages for proper design of such a system. Explain each stage of the management plan and justify your rationale. Estimate the length of time it will take to complete each stage of the management plan. Compare and contrast the self-check-in interface with the interface a receptionist would use. Use Microsoft Visio or an open source alternative, Dia, to create a total of two (2) graphical representations of your proposed interfaces, one (1) for the self-check-in and one (1) for the receptionist. Note: The graphically depicted solution is not included in the required page length. Use at least three (3) quality resources in this assignment. Note: Wikipedia and similar Websites do not qualify as quality resources.
Get Free Quote!
310 Experts Online