This project consists of six drawings (see Figures 1-4), which must be completed by the date given above. Any ‘Block’ drawing files created are additional to this number.

engineering

Description

 This project consists of six drawings (see Figures 1-4), which must be completed by the date given above. Any ‘Block’ drawing files created are additional to this number. 


 The filename must match the drawing naming scheme outlined below and be placed in a folder named lastname_firstname_S2_CAD in your network account on or before the date of submission. 


 You are required to keep a copy of all coursework/projects in your network account until the progression board issues a module grade at the end of the year. 


 Any material considered not being the student’s own work will not be awarded mark


Related Questions in engineering category