As a member of the Information Security team at a small college, you have been made the project manager to install an access control system (ACS) in a dormitory

engineering

Description

As a member of the Information Security team at a small college, you have been made the project manager to install an access control system (ACS) in a dormitory. The ACS will automatically unlock the dormitory doors via an electronic proximity reader and integrate with an existing security camera system. The cameras are designed to face and rotate to record a person as they use their identification card to unlock the door. Create a 3-4 page project plan for this project in which you: Include a one-half page project scope statement. Define five (5) major tasks, each with one to two (1-2) subtasks. Also write a brief description for each task. Create a Gantt chart illustrating the project tasks (use Microsoft Project or a similar project management program). Create a system diagram illustrating the equipment and connections required for this project (use Microsoft Visio or a similar software package).


Related Questions in engineering category


Disclaimer
The ready solutions purchased from Library are already used solutions. Please do not submit them directly as it may lead to plagiarism. Once paid, the solution file download link will be sent to your provided email. Please either use them for learning purpose or re-write them in your own language. In case if you haven't get the email, do let us know via chat support.