Which of the following is NOT a major phase of information engineering?
Select one:
a. Enterprise Analysis
b. Business Area Analysis
c. Business System Analysis
d. Construction
The correct answer is: Business System Analysis
Question 2
Temporal Metrics include all but the following except:
Select one:
a. Environmental Metrics
b. Collateral Damage Potential (CDP)
c. Remediation Level (RL)
d. Report Confidence (RC)
The correct answer is: Environmental Metrics
Question 3
See Table 13-1; which methodology requires Business Entity Analysis?
Select one:
a. Process
b. Data
c. Object
d. None of the above
The correct answer is: Data
Question 4
See Figure 12-17; Which subdomain is responsible for service objects such as Define logical data access control and application presentation.
Select one:
a. Data.
b. Human.
c. Software.
d. Hardware/Operating System.
The correct answer is: Data.
Question 5
True or False: The purpose of a project plan is to maintain control of a project.
Select one:
True
False
The correct answer is 'True'.
Question 6
True or False:Risk is the relative impact that an exploited vulnerability would have to a user's environment.
Select one:
True
False
The correct answer is 'True'.
Question 7
According to Table 13-5; Which methodology is MOST predictable and consistent:
Select one:
a. Process
b. Data
c. Object
d. None of the above
The correct answer is: Data
Question 8
The _______ supports and sells the goals of the project throughout the organization:
Select one:
a. Project Manager
b. Sponsor
c. Champion
d. User
The correct answer is: Champion
Question 9
The Goal of 3NF Is to:
Select one:
a. Remove Repeating Groups
b. Remove Partial Key Dependencies
c. Remove Non-Repeating Groups
d. Remove Nonkey Dependencies Program code
The correct answer is: Remove Nonkey Dependencies Program code
Question 10
Jenkins (2005) listed the mythical man month diagram how many interfaces exist for a 5 person project.
Select one:
a. 1
b. 3
c. 6
d. 10
The correct answer is: 6
Question 11
FIGURE 7-3 Sample Data Flow Diagram depicts data flowing from Process 2.0 to:
Select one:
a. File B
b. Process 3.0
c. Entity Name 1
d. Process 2.0
The correct answer is: Entity Name 1
Question 12
All listed below are examples of stakeholders with the exception of:
Select one:
a. End user
b. Programmer
c. Executive
d. Expert
The correct answer is: Programmer
Question 13
True or False: In this diagram the activity production phase 1 can begin before specify requirements has completed.
Select one:
True
False
The correct answer is 'False'.
Question 14
True or False: Both ADW and IEF are CASE tools.
Select one:
True
False
The correct answer is 'True'.
Question 15
True or False: Data-oriented methods assume that, since data are unstable and processes are, data should be the main focus of activities.
Select one:
True
False
The correct answer is 'False'.
Question 16
Which of the following is NOT an element of a project plan:
Select one:
a. What location is involved
b. When it needs to be done by
c. Who is to do it
d. How it is to be achieved
The correct answer is: What location is involved
Question 17
True or False: The two major activities of data modeling are the creation and refinement of an enemy-relationship diagram (ERD) and entity structure analysis.
Select one:
True
False
The correct answer is 'False'.
Question 18
True or False: CASE tools can ONLY be used in single user versions and NOT multiuser.
Select one:
True
False
The correct answer is 'False'.
Question 19
A __________ is written by the PM and the SE and used to advertise a project to vendors to bid on.
Select one:
a. Bidding document
b. Project request
c. Request for bid
d. Request for proposal (RFP)
The correct answer is: Request for proposal (RFP)
Question 20
In "FIGURE 10-52 Example of Process Hierarchy Diagram," which of the following is NOT one of the four sub processes of sales?
Select one:
a. Data fulfillment
b. Prospect maintenance
c. Data security
d. Inventory fulfillment
The correct answer is: Data fulfillment
Question 21
An important part of the maintainability is to make all which of the following available:
Select one:
a. Project documentation
b. Design documentation
c. Supporting material
d. All of the above
The correct answer is: All of the above
Question 22
Based on this diagram return on investment (ROI) will be reached:
Select one:
a. 1 year
b. 2 years
c. 3 years
d. None of the above
The correct answer is: None of the above
Question 23
Two methods of analyzing methodology classes are:
Select one:
a. Information systems methodology framework
b. Humphrey's maturity framework
c. Information systems methodology framework and Humphrey's maturity framework
d. None of these
The correct answer is: Information systems methodology framework and Humphrey's maturity framework
Question 24
Boilerplate code means that the code:
Select one:
a. does vary from one program to another
b. is critical to maintaining applications at the functional level rather than at the code level.
c. does not vary from one program to another
d. meaning not changeable after it is accepted as complete, motivates users to be as complete in their thinking as possible
The correct answer is: does not vary from one program to another
Question 25
True or False: Cohesion is a measure of the external strength of a module with the notion that maximal, or functional, cohesion is the goal.
Select one:
True
False
The correct answer is 'False'.
Question 26
True or False: Vulnerability is a bug, flaw, weakness, or exposure of an application, system, device, or service that could lead to a failure of confidentiality, integrity, or availability.
Select one:
True
False
The correct answer is 'True'.
Question 27
A ____ test is performed for each of the smallest units of code?
Select one:
a. Regression
b. System
c. Integration
d. Unit
The correct answer is: Unit
Question 28
True or False: Identification does not refer to both Analysis and Design.
Select one:
True
False
The correct answer is 'False'.
Question 29
True or False: The code validation file has the validation role for Process 1.2.
Select one:
True
False
The correct answer is 'False'.
Question 30
True or False: Data-oriented design uses data as the basis for clustering processes, building databases, and identifying.
Select one:
True
False
The correct answer is 'True'.
Question 31
True or False: The scope triangle is NOT also called the quality triangle.
Select one:
True
False
The correct answer is 'False'.
Question 32
In "FIGURE 9-24 Decomposition for Customer and Video Maintenance Remove Repeating Groups," which processes are decomposed?
Select one or more:
a. Rental/Return
b. Accounting
c. Purchasing
d. Personnel / payroll
The correct answer is: Rental/Return, Purchasing
Question 33
Horizontal (or Subset) Data Partitioning:
Select one:
a. Complete 'records' or tuples of data are stored with different data in more than one location.
b. Data are copied in more than one location.
c. Partial 'records' or tuples of data are stored in more than one location.
d. Different data are completely stored in more than one location.
Some data may be accessed by remote sites.
The correct answer is: Partial 'records' or tuples of data are stored in more than one location.
Question 34
Table III-3 discusses all but:
Select one:
a. Document
b. Review
c. Coding
d. Identification
The correct answer is: Coding
Question 35
True or False: The purpose of the regression test is to ensure that the changes cause the application to regress to a functional state, that is, that the changes do introduce errors into the processing.
Select one:
True
False
The correct answer is 'False'.
Question 36
The specific activities in structured systems analysis:
Select one:
a. Develop a context diagram
b. Optionally, develop a state-transition diagram if building an on-line or real-time application
c. Develop a structured data dictionary
d. Develop a set of balanced data flow diagrams
The correct answer is: Develop a structured data dictionary
Question 37
True or False: Computer-aided software engineering (CASE) tools automate the hardware engineering process.
Select one:
True
False
The correct answer is 'False'.
Question 38
True or False: The code validation file has the validation role for Process 1.
Select one:
True
False
The correct answer is 'False'.
Question 39
True or False: White-box testing evaluates specific execute item logic to guarantee its proper functioning.
Select one:
True
False
The correct answer is 'True'.
Question 40
In the following development project schedule what is the deliverable for the acceptance testing phase:
Select one:
a. Project proposal
b. Requirements Spec
c. Alpha
d. Release system
The correct answer is: Release system
Question 41
True or False: Software engineering is the systematic application of tools and techniques in theer is 'True'.
Question 42
Which is NOT a phase of project lifecycle (PLC)?
Select one:
a. Analysis and Design
b. Project Initiation
c. System Retirement
d. Preparation for Software Engineering
The correct answer is: System Retirement
Question 43
True or False: Scope encompasses your vision, but NOT your goal.
Select one:
True
False
The correct answer is 'False'.
Question 44
The Common Vulnerability Scoring System (CVSS) is an open framework that addresses what issue?
Select one:
a. Identifying and assessing vulnerabilities across many disparate software platforms
b. Identifying and assessing vulnerabilities across many disparate hardware platforms
c. Identifying and assessing vulnerabilities across many disparate hardware and software platforms
d. None of the above
The correct answer is: Identifying and assessing vulnerabilities across many disparate hardware and software platforms
Question 45
Legacy Systems are in what phase?
Select one:
a. design
b. installation
c. operations
d. maintenance
The correct answer is: maintenance
Question 46
Environmental Metrics include all the following except:
Select one:
a. Collateral Damage Potential (CDP)
b. Target Distribution (TD)
c. Security Requirements (CR, IR, AR)
d. Temporal vector's
The correct answer is: Temporal vector's
Question 47
The process diagram defines the hardware environment and shows process assignments to software.
Select one:
True
False
The correct answer is 'False'.
Question 48
Software engineers are involved in these activities in which correct order:
Select one:
a. Development, operation, maintenance or retirement
b. Operation, development, retirement and maintenance
c. Development, operation, maintenance and retirement
d. Operation, development, maintenance and retirement
The correct answer is: Development, operation, maintenance and retirement
Question 49
A __________work product is a product that is considered complete and that is the basis for other, current work by the project development team.
Select one:
a. Baseline
b. Change request
c. checklist
d. Change Control File
The correct answer is: Baseline
Question 50
A Structured Walk-Through does not include which work product?
Select one:
a. Program code
b. Programmer
c. Test plan
d. Test design
The correct answer is: Programmer
A Structured Walk-Through does not include this work product:
Select one:
a. Program code
b. Programmer
c. Test plan
d. Test design
The correct answer is: Programmer
Question 2
See Table 13-1; which methodology requires human interface guidelines?
Select one:
a. Process
b. Data
c. Object
d. None of the above
The correct answer is: Object
Question 3
The video store case study in chapter 2 includes requirements for are
d. Networks
The correct answer is: Rental Processing
Question 4
True/False: Booch diagram are used to summarize the objects-both application and service - and their interactions.
Select one:
True
False
The correct answer is 'True'.
Question 5
True or False: Software engineering is the systematic application of tools and techniques in the development of computer-based applications.
Select one:
True
Select one:
a. design
b. installation
c. operations
d. maintenance
The correct answer is: maintenance
Question 7
True or False: Encapsulated Objects can have both Public or Private Parts.
Select one:
True
False
The correct answer is 'False'.
Question 8
To regress to a functional state, that is, that the changes do introduce errors into the processing.
Select one:
True
False
The correct answer is 'False'.
Question 9
There are five rules of scheduling; which of the following is NOT one of them:
Select one:
a. Eliminate uncertainty wherever you can
b. Pick the right level of granularity
c. Take a vacation
d. Analyst/Designer Toolkit
The correct answer is: Take a vacation
Question 10
The list below are useful terms in expressing requirements specifications and can be abbreviated to stand for:
Select one:
a. START
b. STOP
c. SMART
d. None of the above
The correct answer is: SMART
Question 11
True or False: Scope encompasses your vision, but NOT your goal.
Select one:
True
False
The correct answer is 'False'.
Question 2
In the following development project schedule what is the deliverable for the acceptance testing phase:
Select one:
a. Project proposal
b. Requirements Spec
c. Alpha
d. Release system
The correct answer is: Release system
Question 3
The Goal of 3NF Is to:
Select one:
a. Remove Repeating Groups
b. Remove Partial Key Dependencies
c. Remove Non-Repeating Groups
d. Remove Nonkey Dependencies Program code
The correct answer is: Remove Nonkey Dependencies Program code
Question 4
Table 12-1 Object-Oriented Design Documentation; how many (tables and diagrams):
Select one:
a. 3,3
b. 4,3
c. 4,4
d. 3,4
The correct answer is: 3,4
Question 5
The Data Dictionary Process Contents does not include:
Select one:
a. Process Data
b. Process ID Number
c. Constraints (e.g., concurrence, sequential with another process, time-out, etc.)
d. Process Name
The correct answer is: Process Data
Question 6
True or False: Information systems methodology framework is NOT used to compare methodologies.
Select one:
True
False
The correct answer is 'False'.
Question 7
Software engineers are involved in these activities in which correct order:
Select one:
a. Development, operation, maintenance or retirement
b. Operation, development, retirement and maintenance
c. Development, operation, maintenance and retirement
d. Operation, development, maintenance and retirement
The correct answer is: Development, operation, maintenance and retirement
Question 8
A Structured Walk-Through does not include which work product?
Select one:
a. Program code
b. Programmer
c. Test plan
d. Test design
The correct answer is: Programmer
Question 9
True or False: Figure 7-9 Example of Complex Context Diagram describes a inflows context called patients claims processing.
Select one:
True
False
The correct answer is 'True'.
Question 10
Temporal Metrics include all but the foll
c. Remediation Level (RL)
d. Report Confidence (RC)
The correct answer is: Environmental Metrics
Question 11
True or False: Software engineering is the systematic application of tools and techniques in the development of computer-based applications.
Select one:
True
False
The correct answer is 'True'.
Question 12
See Figure 12-17; Which subdomain is responsible for service objects such as Define logical data access control and application presentation.
Select one:
a. Data.
b. Human.
c. Software.
d. Hardware/Operating System.
The correct answer is: Data.
Question 13
True or False: Vulnerability is a bug, flaw, weakness, or exposure of an application, system, device, or service that could lead to a failure of confidentiality, integrity, or availability.
Select one:
True
False
The correct answer is 'True'.
Question 14
Which of the following is NOT a group of CVSS?
Select one:
a. Base
b. Temporal
c. Environmental
d. Human
The correct answer is: Human
Question 15
All listed below are examples of stakeholders with the exception of:
Select one:
a. End user
b. Programmer
c. Executive
d. Expert
The correct answer is: Programmer
Question 16
"FIGURE 9-7 ABC Video Partial Functional Decomposition of Purchasing" is a:
Select one:
a. Program code
b. Process flow
c. Function
d. Data flow
The correct answer is: Process flow
Question 17
See Figure 2: CVSS Metrics and Equations. Which values are considered optional when reflecting the risk posed by the vulnerability to a user's environment?
Select one:
a. Base metrics plus vector
b. Temporal metrics
c. Environmental metrics
d. B and C
The correct answer is: B and C
Question 18
True or False: Computer-aided software engineering (CASE) tools automate the hardware engineering process.
Select one:
True
False
The correct answer is 'False'.
Question 19
True or False: There are three basic types of business programs: report, edit/validate, and file update.
Select one:
True
False
The correct answer is 'True'.
Question 20
The results of structured design are all BUT the following:
Select one:
a. programming specifications
b. plans for testing
c. conversation
d. training and installation
The correct answer is: conversation
Question 21
True or False: Program specifications document the program's purpose, process requirements, the logical and physical data definitions, input and output formats, screen layouts, constraints, and special processing considerations that might complicate the program.
Select one:
True
False
The correct answer is 'True'.
Question 22
True or False: The product or project can be accepted even if acceptance testing is not complete.
Select one:
True
False
analysis:
Select one:
a. Develop a context diagram
b. Optionally, develop a state-transition diagram if building an on-line or real-time application
c. Develop a structured data dictionary
d. Develop a set of balanced data flow diagrams
The correct answer is: Develop a structured data dictionary
Question 24
Environmental Metrics include all the following except:
Select one:
a. Collateral Damage Potential (CDP)
b. Target Distribution (TD)
c. Security Requirements (CR, IR, AR)
d. Temporal vector's
The correct answer is: Temporal at
b. Return
c. Report
d. Retrieve
The correct answer is: Retrieve
Question 26
Useful tools for software engineers DO NOT include:
Select one:
a. process dependencies
b. synchronization matrix
c. process hierarchies
d. object diagrams.
The correct answer is: synchronization matrix
Question 27
True or False: The purpose of the regression test is to ensure that the changes cause the application to regress to a functional state, that is, that the changes do introduce errors into the processing.
Select one:
True
False
The correct answer is 'False'.
Question 28
The _______ supports and sells the goals of the project throughout the organization:
Select one:
a. Project Manager
b. Sponsor
c. Champion
d. User
The correct answer is: Champion
Question 29
True or False: The Z;�UZ;�U��
�UO�
�UxZ;�U0Z;�U@0Z;�Urk that identifies levels of computing and application development process maturity.
Select one:
True
False
The correct answer is 'True'.
Question 30
The purpose of the Sample Change Request Impact Form:
Select one:
a. Document the priority for the action, and the cost and schedule of the change
b. The PM and SE define the schedule and cost.
c. The PM and SE redefine the schedule and the cost.
d. impacts of the change document the priority for the action, and the cost and schedule of the change.
The correct answer is: impacts of the change document the priority for the action, and the cost and schedule of the change.
Question 31
A __________work product is a product that is considered complete and that is the basis for other, current work by the project development team.
Select one:
a. Baseline
b. Change request
c. checklist
d. Change Control File
The correct answer is: Baseline
Question 32
Legacy Systems are in what phase?
Select one:
a. design
b. installation
c. operations
d. maintenance
The correct answer is: maintenance
Question 33
See Table 13-2; which methodology does not require Data Relationships knowledge?
Select one:
a. Process
b. Data
c. Object
d. None of the above
The correct answer is: Process
Question 34
Project teams characterize risk by impact and likelihood. Which quadrant is high impact and high likelihood?
Select one:
a. Major
b. Critical
c. Minor
d. Major
The correct answer is: Critical
Question 35
The purpose of the system test is:
Select one:
a. demonstrate an application's ability to operate satisfactorily in the actual production environment using its intended hardware and software configuration.
b. is a system test and NOT a documentation test.
c. test to demonstrate an application's ability to operate satisfactorily in a simulated production environment using its intended hardware and software configuration.
d. ensure that the changes do not cause the application to regress to a nonfunctional state, that is, that the changes do not introduce errors into the processing.
The correct answer is: test to demonstrate an application's ability to operate satisfactorily in a simulated production environment using its intended hardware and software configuration.
Question 36
A __________ is written by the PM and the SE and used to advertise a project to vendors to bid on.
Select one:
a. Bidding document
b. Project request
c. Request for bid
d. Request for proposal (RFP)
The correct answer is: Request for proposal (RFP)
Question 37
True or False: Traceability is proven at test or implementation time and validates that a requirement has been satisfied.
Select one:
True
False
The correct answer is 'True'.
Question 38
See Table 13-1; which methodology requires Business Entity Analysis?
Select one:
a. Process
b. Data
c. Object
d. None of the above
The correct answer is: Data
Question 39
True or False: Cohesion is a measure of the external strength of a module with the notion that maximal, or functional, cohesion is the goal.
Select one:
True
False
The correct answer is 'False'.
Question 40
Project Managers must exhibit all these qualities except:
Select one:
a. Understanding
b. Trust
c. Budgeting
d. Empathy
The correct answer is: Budgeting
Question 41
In "FIGURE 10-52 Example of Process Hierarchy Diagram," which of the following is NOT one of the four sub processes of sales?
Select one:
a. Data fulfillment
b. Prospect maintenance
c. Data security
d. Inventory fulfillment
The correct answer is: Data fulfillment
Question 42
True or False: Identification does not refer to both Analysis and Design.
Select one:
True
False
The correct answer is 'False'.
Question 43
Which of the following is NOT a major phase of information engineering?
Select one:
a. Enterprise Analysis
b. Business Area Analysis
c. Business System Analysis
d. Construction
The correct answer is: Business System Analysis
Question 44
Which of the following is NOT an element of a project plan:
Select one:
a. What location is involved
b. When it needs to be done by
c. Who is to do it
d. How it is to be achieved
The correct answer is: What location is involved
Question 45
True or False: The two major activities of data modeling are the creation and refinement of an enemy-relationship diagram (ERD) and entity structure analysis.
Select one:
True
False
The correct answer is 'False'.
Question 46
Horizontal (or Subset) Data Partitioning:
Select one:
a. Complete 'records' or tuples of data are stored with different data in more than one location.
b. Data are copied in more than one location.
c. Partial 'records' or tuples of data are stored in more than one location.
d. Different data are completely stored in more than one location.
Some data may be accessed by remote sites.
The correct answer is: Partial 'records' or tuples of data are stored in more than one location.
Question 47
Based on this diagram return on investment (ROI) will be reached:
Select one:
a. 1 year
b. 2 years
c. 3 years
d. None of the above
The correct answer is: None of the above
Question 48
True or False: The code validation file has the validation role for Process 1.2.
Select one:
True
False
The correct answer is 'False'.
Question 49
True or False: The code validation file has the validation role for Process 1.
Select one:
True
False
The correct answer is 'False'.
Question 50
The list below are useful terms in expressing requirements specifications and can be abbreviated to stand for:
Select one:
a. START
b. STOP
c. SMART
d. None of the above
The correct answer is: SMART
True or False:Risk is the relative impact that an exploited vulnerability would have to a user's environment.
Select one:
True
False
The correct answer is 'True'.
Question 2
True or False: The Temporal group reflects the intrinsic qualities of a vulnerability.
Select one:
True
False
The correct answer is 'False'.
Question 3
All listed below are examples of stakeholders with the exception of:
Select one:
a. End user
b. Programmer
c. Executive
d. Expert
The correct answer is: Programmer
Question 4
True or False: Data-oriented design uses data as the basis for clustering processes, building databases, and identifying.
Select one:
True
False
The correct answer is 'True'.
Question 5
Boilerplate code means that the code:
Select one:
a. does vary from one program to another
b. is critical to maintaining applications at the functional level rather than at the code level.
c. does not vary from one program to another
d. meaning not changeable after it is accepted as complete, motivates users to be as complete in their thinking as possible
The correct answer is: does not vary from one program to another
Question 6
A Structured Walk-Through does not include this work product:
Select one:
a. Program code
b. Programmer
c. Test plan
d. Test design
The correct answer is: Programmer
Question 7
True or False: Computer-aided software engineering (CASE) tools automate the hardware engineering process.
Select one:
True
False
The correct answer is 'False'.
Question 8
The Data Dictionary Process Contents does not include:
Select one:
a. Process Data
b. Process ID Number
c. Constraints (e.g., concurrence, sequential with another process, time-out, etc.)
d. Process Name
The correct answer is: Process Data
Question 9
See Figure 12-17; Which subdomain is responsible for service objects such as Define logical data access control and application presentation.
Select one:
a. Data.
b. Human.
c. Software.
d. Hardware/Operating System.
The correct answer is: Data.
Question 10
True or False: The systems engineer provides organizational expertise while the project manager provides technical expertise.
Select one:
True
False
The correct answer is 'False'.
Question 11
Project teams characterize risk by impact and likelihood. Which quadrant is high impact and high likelihood?
Select one:
a. Major
b. Critical
c. Minor
d. Major
The correct answer is: Critical
Question 12
True or False: In this diagram the activity production phase 1 can begin before specify requirements has completed.
Select one:
True
False
The correct answer is 'False'.
Question 13
How many types in "FIGURE 9-27 Types of Process Dependency Connections?"
Select one:
a. One
b. Two
c. Three
d. Five
The correct answer is: Five
Question 14
True or False: The scope triangle is NOT also called the quality triangle.
Select one:
True
False
The correct answer is 'False'.
Question 15
True or False: The product or project can be accepted even if acceptance testing is not complete.
Select one:
True
False
The correct answer is 'False'.
Question 16
Which of the following is NOT a major phase of information engineering?
Select one:
a. Enterprise Analysis
b. Business Area Analysis
c. Business System Analysis
d. Construction
The correct answer is: Business System Analysis
Question 17
The R in CRUD matrix stands for:
Select one:
a. Repeat
b. Return
c. Report
d. Retrieve
The correct answer is: Retrieve
Question 18
True or False: Information systems methodology framework is NOT used to compare methodologies.
Select one:
True
False
The correct answer is 'False'.
Question 19er functioning.
Select one:
True
False
The correct answer is 'True'.
Question 20
The Base Metrics include all the following except:
Select one:
a. Access Vector
b. Authentication
c. Confidentiality, Integrity, Availability
d. Confidentiality, Integrity, Availability Impacts
The correct answer is: Confidentiality, Integrity, Availability
Question 21
True or False: The means to store unlimited, continuously growing databases currently are called data marts.
Select one:
True
False
The correct answer is 'False'.
Question 22
The major activities of structured design are all except:
Select one:
a. Develop program specifications
b. Transform or transaction analysis of DFD
c. Define the logical database
d. Refine and complete structure chart
The correct answer is: Define the logical database
Question 23
Two methods of analyzing methodology classes are:
Select one:
a. Information systems methodology framework
b. Humphrey's maturity framework
c. Information systems methodology framework and Humphrey's maturity framework
d. None of these
The correct answer is: Information systems methodology framework and Humphrey's maturity framework
Question 24
Based on this diagram return on investment (ROI) will be reached:
Select one:
a. 1 year
b. 2 years
c. 3 years
d. None of the above
The correct answer is: None of the above
Question 25
FIGURE 7-3 Sample Data Flow Diagram depicts data flowing from Process 2.0 to:
Select one:
a. File B
b. Process 3.0
c. Entity Name 1
d. Process 2.0
The correct answer is: Entity Name 1
Question 26
A __________work product is a product that is considered complete and that is the basis for other, current work by the project development team.
Select one:
a. Baseline
b. Change request
c. checklist
d. Change Control File
The correct answer is: Baseline
Question 27
Horizontal (or Subset) Data Partitioning:
Select one:
a. Complete 'records' or tuples of data are stored with different data in more than one location.
b. Data are copied in more than one location.
c. Partial 'records' or tuples of data are stored in more than one location.
d. Different data are completely stored in more than one location.
Some data may be accessed by remote sites.
The correct answer is: Partial 'records' or tuples of data are stored in more than one location.
Question 28
Software engineers are involved in these activities in which correct order:
Select one:
a. Development, operation, maintenance or retirement
b. Operation, development, retirement and maintenance
c. Development, operation, maintenance and retirement
d. Operation, development, maintenance and retirement
The correct answer is: Development, operation, maintenance and retirement
Question ing process.
Select one:
True
False
The correct answer is 'False'.
Question 30
An important part of the maintainability is to make all which of the following available:
Select one:
a. Project documentation
b. Design documentation
c. Supporting material
d. All of the above
The correct answer is: All of the above
Question 31
____ are input data created to demonstrate that both components and the total system satisfy all design requirements.
Select one:
a. Test plan
b. Test strategy
c. Test cases
d. Subsystem testing
The correct answer is: Test e:
a. Document the priority for the action, and the cost and schedule of the change
b. The PM and SE define the schedule and cost.
c. The PM and SE redefine the schedule and the cost.
d. impacts of the change document the priority for the action, and the cost and schedule of the change.
The correct answer is: impacts of the change document the priority for the action, and the cost and schedule of the change.
Question 33
The specific activities in structured systems analysis:
Select one:
a. Develop a context diagram
b. Optionally, develop a state-transition diagram if building an on-line or real-time application
c. Develop a structured data dictionary
d. Develop a set of balanced data flow diagrams
The correct answer is: Develop a structured data dictionary
Question 34
True or False: CASE tools can ONLY be used in single user versions and NOT multiuser.
Select one:
True
False
The correct answer is 'False'.
Question 35
Figure 7-3 Sample Data Flow Diagram depicts data flowing from Process 2.0 to:
Select one:
a. File B
b. Process 3.0
c. Entity Name 1
d. Process 2.0
The correct answer is: EntiZ;�UZ;�U��
�UO�
�UxZ;�U0Z;�U@0Z;�Ul.
Select one:
True
False
The correct answer is 'False'.
Question 37
Table III-3 discusses all but:
Select one:
a. Document
b. Review
c. Coding
d. Identification
The correct answer is: Coding
Question 38
The critical path of a project is defined as:
Select one:
a. Shortest sequence of dependent tasks to project completion.
b. The sequence of dependent tasks that together take the most time. If any of the tasks are delayed, the project is also delayed
c. The sequence of dependent tasks that together take the least time. If any of the tasks are delayed, the project can complete on time.
d. Longest sequence of dependent tasks to project completion.
The correct answer is: The sequence of dependent tasks that together take the most time. If any of the tasks are delayed, the project is also delayed
Question 39
Which is NOT a phase of project lifecycle (PLC)?
Select one:
a. Analysis and Design
b. Project Initiation
c. System Retirement
d. Preparation for Software Engineering
The correct answer is: System Retirement
Question 40
The process diagram defines the hardware environment and shows process assignments to software.
Select one:
True
False
The correct answer is 'False'.
Question 41
True or False: Threat is the likelihood or frequency of a harmful event occurring.
Select one:
True
False
The correct answer is 'True'.
Question 42
The Goal of 3NF Is to:
Select one:
a. Remove Repeating Groups
b. Remove Partial Key Dependencies
c. Remove Non-Repeating Groups
d. Remove Nonkey Dependencies Program code
The correct answer is: Remove Nonkey Dependencies Program code
Question 43
True or False: In a required relationship, the entity must be present for the other entity to exist. In an optional relationship, the entity must be present for the other entity to exist.
Select one:
True
False
The correct answer is 'True'.
Question 44
See Table 13-2; which methodology does not require Data Relationships knowledge?
Select one:
a. Process
b. Data
c. Object
d. None of the above
The correct answer is: Process
Question 45
The results of structured design are all BUT the following:
Select one:
a. programming specifications
b. plans for testing
c. conversation
d. training and installation
The correct answer is: conversation
Question 46
Which goal is stated in a clear and concise manner and more likely to inspire team members to achieve it?
Select one:
a. “To deliver the cheapest system, in the shortest time, that just about gets the job done”
b. “To deliver the best sales and marketing system on the market”
c. “To deliver the cheapest system, in the shortest time, that almost gets the job done”
d. “To deliver a sales and marketing system on time”
The correct answer is: “To deliver the best sales and marketing system on the market”
Question 47
Project Managers must exhibit all these qualities except:
Select one:
a. Understanding
b. Trust
c. Budgeting
d. Empathy
The correct answer is: Budgeting
Question 48
Temporal Metrics include all but the following except:
Select one:
a. Environmental Metrics
b. Collateral Damage Potential (CDP)
c. Remediation Level (RL)
d. Report Confidence (RC)
The correct answer is: Environmental Metrics
Question 49
True or False: Software engineering is the systematic application of tools and techniques in the development of computer-based applications.
Select one:
True
False
The correct answer is 'True'.
Question 50
"TABLE 8-9 CASE Tools for Structured Design Program" code include all but:
Select one:
a. The Developer
b. Maestro
c. Oracle
d. Analyst/Designer Toolkit
The correct answer is: Oracle
Which is NOT a phase of project lifecycle (PLC)?
Select one:
a. Analysis and Design
b. Project Initiation
c. System Retirement
d. Preparation for Software Engineering
The correct answer is: System Retirement
Question 2
True or False: Software engineering is the systematic application of tools and techniques in the development of computer-based applications.
Select one:
True
False
The correct answer is 'True'.
Question 3
Useful tools for software engineers DO NOT include:
Select one:
a. process dependencies
b. synchronization matrix
c. process hierarchies
d. object diagrams.
The correct answer is: synchronization matrix
Question 4
Software engineers are involved in these activities in which correct order:
Select one:
a. Development, operation, maintenance or retirement
b. Operation, development, retirement and maintenance
c. Development, operation, maintenance and retirement
d. Operation, development, maintenance and retirement
The correct answer is: Development, operation, maintenance and retirement
Question 5
True or False: Data requirements for applications include: input, output, storage, and retrieval.
Select one:
True
False
The correct answer is 'True'.
Question 6
True or False: The systems engineer provides organizational expertise while the project manager provides technical expertise.
Select one:
True
False
The correct answer is 'False'.
Question 7
The _______ supports and sells the goals of the project throughout the organization:
Select one:
a. Project Manager
b. Sponsor
c. Champion
d. User
The correct answer is: Champion
Question 8
A __________ is written by the PM and the SE and used to advertise a project to vendors to bid on.
Select one:
a. Bidding document
b. Project request
c. Request for bid
d. Request for proposal (RFP)
The correct answer is: Request for proposal (RFP)
Question 9
The video store case study in chapter 2 includes requirements for customer, video and ___________.
Select one:
a. Rental Processing
b. Software
c. Hardware
d. Networks
The correct answer is: Rental Processing
Question 10
The critical path of a project is defined as:
Select one:
a. Shortest sequence of dependent tasks to project completion.
b. The sequence of dependent tasks that together take the most time. If any of the tasks are delayed, the project is also delayed
c. The sequence of dependent tasks that together take the least time. If any of the tasks are delayed, the project can complete on time.
d. Longest sequence of dependent tasks to project completion.
The correct answer is: The sequence of dependent tasks that together take the most time. If any of the tasks are delayed, the project is also delayed
Table III-3 discusses all but:
Select one:
a. Document
b. Review
c. Coding
d. Identification
The correct answer is: Coding
Question 2
True or False: Identification does not refer to both Analysis and Design.
Select one:
True
False
The correct answer is 'False'.
Question 3
A Structured Walk-Through does not include this work product:
Select one:
a. Program code
b. Programmer
c. Test plan
d. Test design
The correct answer is: Programmer
Question 4
True or False: Computer-aided software engineering (CASE) tools automate the hardware engineering process.
Select one:
True
False
The correct answer is 'False'.
Question 5
Figure 7-3 Sample Data Flow Diagram depicts data flowing from Process 2.0 to:
Select one:
a. File B
b. Process 3.0
c. Entity Name 1
d. Process 2.0
The correct answer is: Entity Name 1
Question 6
True or False: The code validation file has the validation role for Process 1.2.
Select one:
True
False
The correct answer is 'False'.
Question 7
The specific activities in structured systems analysis:
Select one:
a. Develop a context diagram
b. Optionally, develop a state-transition diagram if building an on-line or real-time application
c. Develop a structured data dictionary
d. Develop a set of balanced data flow diagrams
The correct answer is: Develop a structured data dictionary
Question 8
True or False: Figure 7-9 Example of Complex Context Diagram describes a inflows context called patients claims processing.
Select one:
True
False
The correct answer is 'True'.
Question 9
The Data Dictionary Process Contents does not include:
Select one:
a. Process Data
b. Process ID Number
c. Constraints (e.g., concurrence, sequential with another process, time-out, etc.)
d. Process Name
The correct answer is: Process Data
Which of the following is NOT a major phase of information engineering?
Select one:
a. Enterprise Analysis
b. Business Area Analysis
c. Business System Analysis
d. Construction
The correct answer is: Business System Analysis
Question 2
True or False: The two major activities of data modeling are the creation and refinement of an enemy-relationship diagram (ERD) and entity structure analysis.
Select one:
True
False
The correct answer is 'False'.
Question 3
"FIGURE 9-7 ABC Video Partial Functional Decomposition of Purchasing" is a:
Select one:
a. Program code
b. Process flow
c. Function
d. Data flow
The correct answer is: Process flow
Question 4
True or False: In a required relationship, the entity must be present for the other entity to exist. In an optional relationship, the entity must be present for the other entity to exi
The Goal of 3NF Is to:
Select one:
a. Remove Repeating Groups
b. Remove Partial Key Dependencies
c. Remove Non-Repeating Groups
d. Remove Nonkey Dependencies Program code
The correct answer is: Remove Nonkey Dependencies Program code
Question 6
True or False: In "FIGURE 9-17 ABC Rental Processing-First-Cut Entity-Relationship Diagram," the three entities are: Customer, Video, Rental and Request.
Select one:
True
False
The correct answer is 'False'.
Question 7
In "FIGURE 9-24 Decomposition for Customer and Video Maintenance Remove Repeating Groups," which processes are decomposed?
Select one or more:
a. Rental/Return
b. Accounting
c. Purchasing
d. Personnel / payroll
The correct answer is: Rental/Return, Purchasing
Question 8
How many types in "FIGURE 9-27 Types of Process Dependency Connections?"
Select one:
a. One
b. Two
c. Three
d. Five
The correct answer is: Five
Question 9
True or False: Both ADW and IEF are CASE tools.
Select one:
True
False
The correct answer is 'True'.
Question 10
The R in CRUD matrix stands for:
Select one:
a. Repeat
b. Return
c. Report
d. Retrieve
The correct answer is: Retrieve
Potential distribution of the application. The specific activities in structured systems analysis:
Select one:
a. Develop a context diagram
b. Optionally, develop a state-transition diagram if building an on-line or real-time application
c. Develop a structured data dictionary
d. Develop a set of balanced data flow diagrams
The correct answer is: Develop a structured data dictionary
Question 2
Horizontal (or Subset) Data Partitioning:
Select one:
a. Complete 'records' or tuples of data are stored with different data in more than one location.
b. Data are copied in more than one location.
c. Partial 'records' or tuples of data are stored in more than one location.
d. Different data are completely stored in more than one location.
Some data may be accessed by remote sites.
The correct answer is: Partial 'records' or tuples of data are stored in more than one location.
Question 3
The Goal of 3NF Is to:
Select one:
a. Remove Repeating Groups
b. Remove Partial Key Dependencies
c. Remove Non-Repeating Groups
d. Remove Nonkey Dependencies Program code
The correct answer is: Remove Nonkey Dependencies Program code
Question 4
The video store case study in chapter 2 includes requirements for customer, video and ___________.
Select one:
a. Rental Processing
b. Software
c. Hardware
d. Networks
The correct answer is: Rental Processing
Question 5
Useful tools for software engineers DO NOT include:
Select one:
a. process dependencies
b. synchronization matrix
c. process hierarchies
A Structured Walk-Through does not include this work product:
Select one:
a. Program code
b. Programmer
c. Test plan
d. Test design
The correct answer is: Programmer
Question 7
True or False: Cohesion is a measure of the external strength of a module with the notion that maximal, or functional, cohesion is the goal.
Select one:
True
False
The correct answer is 'False'.
Question 8
True or False: Identification does not refer to both Analysis and Design.
Select one:
True
False
The correct answer is 'False'.
Question 9
True or False: Data requirements for applications include: input, output, storage,ion 10
True or False: Both ADW and IEF are CASE tools.
Select one:
True
False
The correct answer is 'True'.
Question 11
True or False: Software engineering is the systematic application of tools and techniques in the development of computer-based applications.
Select one:
True
False
The correct answer is 'True'.
Question 12
True or False: The systems engineer provides organizational expertise while the project manager provides technical expertise.
Select one:
True
False
The correct answer is 'False'.
Question 13
True or False: In a required relationship, the entity must be present for the other entity to exist. In an optional relationship, the entity must be present for the other entity to exist.
Select one:
True
False
The correct answer is 'True'.
Question 14
True or False: The code validation file has the validation role for Process 1.2.
Select one:
True
False
The correct answer is 'False'.
Question 15
True or False: Computer-aided software engineering (CASE) tools automate the hardware engineering process.
Select one:
True
False
The correct answer is 'False'.
Question 16
Table III-3 discusses all but:
Select one:
a. Document
b. Review
c. Coding
d. Identification
The correct answer is: Coding
Question 17
In "FIGURE 9-24 Decomposition for Customer and Video Maintenance RemZ;�UZ;�U��
�UO�
�UxZ;�U0Z;�U@0Z;�Ubr /> b. Accounting
c. Purchasing
d. Personnel / payroll
The correct answer is: Rental/Return, Purchasing
Question 18
True or False: Data-oriented methods assume that, since data are unstable and processes are, data should be the main focus of activities.
Select one:
True
False
The correct answer is 'False'.
Question 19
True or False: Program specifications document the program's purpose, process requirements, the logical and physical data definitions, input and output formats, screen layouts, constraints, and special processing considerations that might complicate the program.
Select one:
True
False
The correct answer is 'True'.
Question 20
Which of the following is NOT a major phase of information engineering?
Select one:
a. Enterprise Analysis
b. Business Area Analysis
c. Business System Analysis
d. Construction
The correct answer is: Business System Analysis
An _______ is an entity from the real world whose processes and attributes (that is, the data) are modeled in a computerized application.
Select one:
a. abstract data type (ADT)
b. Class/objects
c. Object
d. class
The correct answer is: Object
Question 2
True or False: Encapsulated Objects can have both Public or Private Parts.
Select one:
True
False
The correct answer is 'False'.
Question 3
The Project Manager’s job is to:
Select one:
a. Must understand the customer requirements for the team and keep the SE’s on track.
b. Leads the design, coding and testing effort. Decides which process to use (data, or object oriented design) and directs and reviews the SE2 products.
c. Leads the team and is responsible for the final product quality and timeliness.
d. Documents the figures, diagrams for process, data, or object oriented design.
e. Constructs schedule and milestones and keeps the PM informed and on schedule.
The correct answer is: Leads the team and is responsible for the final product quality and timeliness.
Question 4
True or False: Computer-aided software engineering (CASE) tools automate the hardware engineering process.
Select one:
True
False
The correct answer is 'False'.
Question 5
A Structured Walk-Through does not include which work product?
Select one:
a. Program code
b. Programmer
c. Test plan
d. Test design
The correct answer is: Programmer
Question 6
True/False: Object oriented design has seven steps.
Select one:
True
False
The response was correct.
The correct answer is 'True'.
Question 7
Table 12-1 Object-Oriented Design Documentation; how many (tables and diagrams):
Select one:
a. 3,3
b. 4,3
c. 4,4
d. 3,4
The correct answer is: 3,4
Question 8
The process diagram defines the hardware environment and shows process assignments to software.
Select one:
True
False
The correct answer is 'False'.
Question 9
See Figure 12-17; Which subdomain is responsible for service objects such as Define logical data access control and application presentation.
Select one:
a. Data.
b. Human.
c. Software.
d. Hardware/Operating System.
The correct answer is: Data.
Question 10
True/False: Booch diagram are used to summarize the objects-both application and service - and their interactions.
Select one:
True
False
Your answer was correct.
The correct answer is 'True'.
A ____ test is performed for each of the smallest units of code?
Select one:
a. Regression
b. System
c. Integration
d. Unit
The correct answer is: Unit
Question 2
True or False: White-box testing evaluates specific execute item logic to guarantee its proper functioning.
Select one:
True
False
The correct answer is 'True'.
Question 3
____ are input data created to demonstrate that both components and the total system satisfy all design requirements.
Select one:
a. Test plan
b. Test strategy
c. Test cases
d. Subsystem testing
The correct answer is: Test cases
Question 4
The purpose of the system test is:
Select one:
a. demonstrate an application's ability to operate satisfactorily in the actual production environment using its intended hardware and software configuration.
b. is a system test and NOT a documentation test.
c. test to demonstrate an application's ability to operate satisfactorily in a simulated production environment using its intended hardware and software configuration.
d. ensure that the changes do not cause the application to regress to a nonfunctional state, that is, that the changes do not introduce errors into the processing.
The correct answer is: test to demonstrate an application's ability to operate satisfactorily in a simulated production environment using its intended hardware and software configuration.
Question 5
True or False: The purpose of the regression test is to ensure that the changes cause the application to regress to a functional state, that is, that the changes do introduce errors into the processing.
Select one:
True
False
The correct answer is 'False'.
Question 6
True or False: There are three basic types of business programs: report, edit/validate, and file update.
Select one:
True
False
The correct answer is 'True'.
Question 7
Boilerplate code means that the code:
Select one:
a. does vary from one program to another
b. is critical to maintaining applications at the functional level rather than at the code level.
c. does not vary from one program to another
d. meaning not changeable after it is accepted as complete, motivates users to be as complete in their thinking as possible
The correct answer is: does not vary from one program to another
Question 8
A __________work product is a product that is considered complete and that is the basis for other, current work by the project development team.
Select one:
a. Baseline
b. Change request
c. checklist
d. Change Control File
The correct answer is: Baseline
Question 9
The purpose of the Sample Change Request Impact Form:
Select one:
a. Document the priority for the action, and the cost and schedule of the change
b. The PM and SE define the schedule and cost.
c. The PM and SE redefine the schedule and the cost.
d. impacts of the change document the priority for the action, and the cost and schedule of the change.
The correct answer is: impacts of the change document the priority for the action, and the cost and schedule of the change.
Question 10
Restructuring is:
Select one:
a. the redevelopment of a portion of an application with a bridge to the old application.
b. is the reverse analysis of an old application to conform to a new methodology, usually Information Engineering or object orientation.
c. is also known as reverse engineering. Rebuilding is the retirement and redevelopment of an application.
d. the redevelopment of an application with a bridge to the old application.
The correct answer is: the redevelopment of a portion of an application with a bridge to the old application.
Jenkins (2005) stated that the critical path is defined as:
Select one:
a. It is this path that you can traverse in order to reach completion of your project on time
b. It is this path that you must traverse in order to reach completion of your project on time
c. The critical path represents the ideal set of tasks to be complete for your project
d. The critical path represents a set of tasks to be complete for your project
The correct answer is: It is this path that you must traverse in order to reach completion of your project on time
Question 2
True or False: The scope triangle is NOT also called the quality triangle.
Select one:
True
False
The correct answer is 'False'.
Question 3
Jenkins (2005) listed the mythical man month diagram how many interfaces exist for a 5 person project.
Select one:
a. 1
b. 3
c. 6
d. 10
The correct answer is: 6
Question 4
True or False: Scope encompasses your vision, but NOT your goal.
Select one:
True
False
The correct answer is 'False'.
Question 5
Which goal is stated in a clear and concise manner and more likely to inspire team members to achieve it?
Select one:
a. “To deliver the cheapest system, in the shortest time, that just about gets the job done”
b. “To deliver the best sales and marketing system on the market”
c. “To deliver the cheapest system, in the shortest time, that almost gets the job done”
d. “To deliver a sales and marketing system on time”
The correct answer is: “To deliver the best sales and marketing system on the market”
Question 6
True or False: Sometimes referred to as a ‘business case’, the project proposal states the lowest level goals in a project.
Select one:
True
False
The correct answer is 'False'.
Question 7
Based on this diagram return on investment (ROI) will be reached:
Select one:
a. 1 year
b. 2 years
c. 3 years
d. None of the above
The correct answer is: None of the above
Question 8
All listed below are examples of stakeholders with the exception of:
Select one:
a. End user
b. Programmer
True or False: Traceability is proven at test or implementation time and validates that a requirement has been satisfied.
Select one:
True
False
The correct answer is 'True'.
Question 10
The list below are useful terms in expressing requirements specifications and can be abbreviated to stand for:
Select one:
a. START
b. STOP
c. SMART
d. None of the above
The correct answer is: SMART
True or False: The product or project can be accepted even if acceptance testing is not complete.
Select one:
True
False
The correct answer is 'False'.
Question 2
True or False: The purpose of a project plan is to maintain control of a project.
Select one:
True
False
The correct answer is 'True'.
Question 3
True or False: Traceability is proven at test or implementation time and validates that a requirement has been satisfied.
Select one:
True
False
The correct answer is 'True'.
Question 4
True/False: Object oriented design has seven steps.
Select one:
True
False
The response was correct.
The correct answer is 'True'.
Question 5
The purpose of the system test is:
Select one:
a. demonstrate an application's ability to operate satisfactorily in the actual production environment using its intended hardware and software configuration.
b. is a system test and NOT a documentation test.
c. test to demonstrate an application's ability to operate satisfactorily in a simulated production environment using its intended hardware and software configuration.
d. ensure that the changes do not cause the application to regress to a nonfunctional state, that is, that the changes do not introduce errors into the processing.
The correct answer is: test to demonstrate an application's ability to operate satisfactorily in a simulated production environment using its intended hardware and software configuration.
Question 6
____ are input data created to demonstrate that both components and the total system satisfy all design requirements.
Select one:
a. Test plan
b. Test strategy
c. Test cases
d. Subsystem testing
The correct answer is: Test cases
Question 7
A Structured Walk-Through does not include which work product?
Select one:
a. Program code
b. Programmer
c. Test plan
d. Test design
The correct answer is: Programmer
Question 8
True or False: Scope encompasses your vision, but NOT your goal.
Select one:
True
False
The correct answer is 'False'.
Question 9
Which of the following is NOT an element of a project plan:
Select one:
a. What location is involved
b. When it needs to be done by
c. Who is to do it
d. How it is to be achieved
The correct answer is: What location is involved
Question 10
Jenkins (2005) sn order to reach completion of your project on time
b. It is this path that you must traverse in order to reach completion of your project on time
c. The critical path represents the ideal set of tasks to be complete for your project
d. The critical path represents a set of tasks to be complete for your project
The correct answer is: It is this path that you must traverse in order to reach completion of your project on time
Question 11
True or False: Sometimes referred to as a ‘business case’, the project proposal states the lowest level goals in a project.
Select one:
True
False
The correct answer is 'False'.
Question 12
An important part of the maintainability is to make all which of the following avng material
d. All of the above
The correct answer is: All of the above
Question 13
A ____ test is performed for each of the smallest units of code?
Select one:
a. Regression
b. System
c. Integration
d. Unit
The correct answer is: Unit
Question 14
The process diagram defines the hardware environment and shows process assignments to software.
Select one:
True
False
The correct answer is 'False'.
Question 15
Restructuring is:
Select one:
a. the redevelopment of a portion of an application with a bridge to the old application.
b. is the reverse analysis of an old application to conform to a new methodology, usually Information Engineering or object orientation.
c. is also known as reverse engineering. Rebuilding is the retirement and redevelopment of an application.
d. the redevelopment of an application with a bridge to the old application.
The correct answer is: the redevelopment of a portion of an application with a bridge to the old application.
Question 16
Based on this diagram return on investment (ROI) will be reached:
Select one:
a. 1 year
b. 2 years
c. 3 years
d. None of the above
The correct answer is: None of the above
Question 17
True or False: Encapsulated Obje`D>�U`D>�U���
�U�}�
�U�D>�U�D>�U@�D>�Ur is 'False'.
Question 18
Boilerplate code means that the code:
Select one:
a. does vary from one program to another
b. is critical to maintaining applications at the functional level rather than at the code level.
c. does not vary from one program to another
d. meaning not changeable after it is accepted as complete vary from one program to another
Question 19
An _______ is an entity from the real world whose processes and attributes (that is, the data) are modeled in a computerized application.
Select one:
a. abstract data type (ADT)
b. Class/objects
c. Object
d. class
The correct answer is: Object
Question 20
In the following development project schedule what is the deliverable for the acceptance testing phase:
Select one:
a. Project proposal
b. Requirements Spec
c. Alpha
d. Release system
The correct answer is: Release system
See Table 13-1; which methodology requires human interface guidelines?
Select one:
a. Process
b. Data
c. Object
d. None of the above
The correct answer is: Object
Question 2
True or False: Information systems methodology framework is NOT used to compare methodologies.
Select one:
True
False
The correct answer is 'False'.
Question 3
See Table 13-1; which methodology requires Business Entity Analysis?
Select one:
a. Process
b. Data
c. Object
d. None of the above
The correct answer is: Data
Question 4
True or False: The Humphrey's maturity frameworks were developed for the Department of Defense as a self-assessment framework that identifies levels of computing and application development process maturity.
Select one:
True
False
The correct answer is 'True'.
Question 5
See Table 13-2; which methodology does not require Data Relationships knowledge?
Select one:
a. Process
b. Data
c. Object
d. None of the above
The correct answer is: Process
Question 6
According to Table 13-5; Which methodology is MOST predictable and consistent:
Select one:
a. Process
b. Data
c. Object
d. None of the above
The correct answer is: Data
Question 7
True or False: CASE tools can ONLY be used in single user versions and NOT multiuser.
Select one:
True
False
The correct answer is 'False'.
Question 8
Legacy Systems are in what phase?
Select one:
a. design
b. installation
c. operations
d. maintenance
The correct answer is: maintenance
Question 9
True or False: The means to store unlimited, continuously growing databases currently are called data marts.
Select one:
True
False
The correct answer is 'False'.
Question 10
Two methods of analyzing methodology classes are:
Select one:
a. Information systems methodology framework
b. Humphrey's maturity framework
c. Information systems methodology framework and Humphrey's maturity framework
d. None of these
The correct answer is: Information systems methodology framework and Humphrey's maturity framework
Which of the following is NOT a group of CVSS?
Select one:
a. Base
b. Temporal
c. Environmental
d. Human
Question 2
True or False: The Temporal group reflects the intrinsic qualities of a vulnerability.
Select one:
True
False
Question 3
The Common Vulnerability Scoring System (CVSS) is an open framework that addresses what issue?
Select one:
a. Identifying and assessing vulnerabilities across many disparate software platforms
b. Identifying and assessing vulnerabilities across many disparate hardware platforms
c. Identifying and assessing vulnerabilities across many disparate hardware and software platforms
d. None of the above
Question 4
See Figure 2: CVSS Metrics and Equations. Which values are considered optional when reflecting the risk posed by the vulnerability to a user's environment?
Select one:
a. Base metrics plus vector
b. Temporal metrics
c. Environmental metrics
d. B and C
Question 5
True or False: Vulnerability is a bug, flaw, weakness, or exposure of an application, system, device, or service that could lead to a failure of confidentiality, integrity, or availability.
Select one:
True
False
Question 6
True or False: Threat is the likelihood or frequency of a harmful event occurring.
Select one:
True
False
Question 7
True or False:Risk is the relative impact that an exploited vulnerability would have to a user's environment.
Select one:
True
False
Question 8
Temporal Metrics include all but the following except:
Select one:
a. Environmental Metrics
b. Collateral Damage Potential (CDP)
c. Remediation Level (RL)
d. Report Confidence (RC)
Question 9
Environmental Metrics include all the following except:
Select one:
a. Collateral Damage Potential (CDP)
b. Target Distribution (TD)
c. Security Requirements (CR, IR, AR)
d. Temporal vector's
Question 10
The Base Metrics include all the following except:
Select one:
a. Access Vector
b. Authentication
c. Confidentiality, Integrity, Availability
d. Confidentiality, Integrity, Availability Impacts
The Data Dictionary Process Contents does not include:
Select one:
a. Process Data
b. Process ID Number
c. Constraints (e.g., concurrence, sequential with another process, time-out, etc.)
d. Process Name
The correct answer is: Process Data
Question 2
True or False: In "FIGURE 9-17 ABC Rental Processing-First-Cut Entity-Relationship Diagram," the three entities are: Customer, Video, Rental and Request.
Select one:
True
False
The correct answer is 'False'.
Question 3
Which goal is stated in a clear and concise manner and more likely to inspire team members to achieve it?
Select one:
a. “To deliver the cheapest system, in the shortest time, that just about gets the job done”
b. “To deliver the best sales and marketing system on the market”
c. “To deliver the cheapest system, in the shortest time, that almost gets the job done”
d. “To deliver a sales and marketing system on time”
The correct answer is: “To deliver the best sales and marketing system on the market”
Question 4
The major activities of structured design are all except:
Select one:
a. Develop program specifications
b. Transform or transaction analysis of DFD
c. Define the logical database
d. Refine and complete structure chart
The correct answer is: Define the logical database
Question 5
True or False: Threat is the likelihood or frequency of a harmful event occurring.
Select one:
True
False
The correct answer is 'True'.
Question 6
True or False: In a required relationship, the entity must be present for the other entity to exist. In an optional relationship, the entity must be present for the other entity to exist.
Select one:
True
False
The correct answer is 'True'.
Question 7
The Base Metrics include all the following except:
Select one:
a. Access Vector
b. Authentication
c. Confidentiality, Integrity, Availability
d. Confidentiality, Integrity, Availability Impacts
The correct answer is: Confidentiality, Integrity, Availability
Question 8
There are five rules of scheduling; which of the following is NOT one of them:
Select one:
a. Eliminate uncertainty wherever you can
b. Pick the right level of granularity
c. Take a vacation
d. Analyst/Designer Toolkit
The correct answer is: Take a vacation
Question 9
The purpose of the Sample Change Request Impact Form:
Select one:
a. Document the priority for the action, and the cost and schedule of the change
b. The PM and SE define the schedule and cost.
c. The PM and SE redefine the schedule and the cost.
d. impacts of the change document the priority for the action, and the cost and schedule of the change.
The correct answer is: impacts of the change document the priority for the action, and the cost and schedule of the change.
Question 10
See Table 13-1; which methodology requires human interface guidelines?
Select one:
a. Process
b. Data
c. Object
d. None of the above
The correct answer is: Object
Question 11
True or False: Data requirements for applications include: input, output, storage, and retrieval.
Select one:
True
False
The correct answer is 'True'.
Question 12
True or False: In many projects the change management system is NOT linked to (or is part of) a defect tracking.
Select one:
True
False
The correct answer is 'False'.
Question 13
____ are input data created to demonstrate that both components and the total system satisfy all design requirements.
Select one:
a. Test plan
b. Test strategy
c. Test cases
d. Subsystem testing
The correct answer is: Test cases
Question 14
True/False: Object oriented design has seven steps.
Select one:
True
False
The response was correct.
The correct answer is 'True'.
Question 15
True or False: Sometimes referred to as a ‘business case’, the project proposal states the lowest level goals in a project.
Select one:
True
False
The correct answer is 'False'.
Question 16
"FIGURE 9-7 ABC Video Partial Functional Decomposition of Purchasing" is a:
Select one:
a. Program code
b. Process flow
c. Function
d. Data flow
The correct answer is: Process flow
Question 17
The results of structured design are all BUT the following:
Select one:
a. programming specifications
b. plans for testing
c. conversation
d. training and installation
The correct answer is: conversation
Question 18
True or False: The product or project can be accepted even if acceptance testing is not complete.
Select one:
True
False
The correct answer is 'False'.
Question 19
True or False: Program specifications document the program's purpose, process requirements, the logical and physical data definitions, input and output formats, screen layouts, constraints, and special processing considerations that might complicate the program.
Select one:
True
False
The correct answer is 'True'.
Question 20
Restructuring is:
Select one:
a. the redevelopment of a portion of an application with a bridge to the old application.
b. is the reverse analysis of an old application to conform to a new methodology, usually Information Engineering or object orientation.
c. is also known as reverse engineering. Rebuilding is the retirement and redevelopment of an application.
d. the redevelopment of an application with a bridge to the old application.
The correct answer is: the redevelopment of a portion of an application with a bridge to the old application.
Question 21
The critical path of a project is defined as:
Select one:
a. Shortest sequence of dependent tasks to project completion.
b. The sequence of dependent tasks that together take the most time. If any of the tasks are delayed, the project is also delayed
c. The sequence of dependent tasks that together take the least time. If any of the tasks are delayed, the project can complete on time.
d. Longest sequence of dependent tasks to project completion.
The correct answer is: The sequence of dependent tasks that together take the most time. If any of the tasks are delayed, the project is also delayed
Question 22
The Project Manager’s job is to:
Select one:
a. Must understand the customer requirements for the team and keep the SE’s on track.
b. Leads the design, coding and testing effort. Decides which process to use (data, or object oriented design) and directs and reviews the SE2 products.
c. Leads the team and is responsible for the final product quality and timeliness.
d. Documents the figures, diagrams for process, data, or object oriented design.
e. Constructs schedule and milestones and keeps the PM informed and on schedule.
The correct answer is: Leads the team and is responsible for the final product quality and timeliness.
Question 23
True or False: The Temporal group reflects the intrinsic qualities of a vulnerability.
Select one:
True
False
The correct answer is 'False'.
Question 24
The purpose of the system test is:
Select one:
a. demonstrate an application's ability to operate satisfactorily in the actual production environment using its intended hardware and software configuration.
b. is a system test and NOT a documentation test.
c. test to demonstrate an application's ability to operate satisfactorily in a simulated production environment using its intended hardware and software configuration.
d. ensure that the changes do not cause the application to regress to a nonfunctional state, that is, that the changes do not introduce errors into the processing.
The correct answer is: test to demonstrate an application's ability to operate satisfactorily in a simulated production environment using its intended hardware and software configuration.
Question 25
True or False: Information systems methodology framework is NOT used to compare methodologies.
Select one:
True
False
The correct answer is 'False'.
Question 26
The video store case study in chapter 2 includes requirements for customer, video and ___________.
Select one:
a. Rental Processing
b. Software
c. Hardware
d. Networks
The correct answer is: Rental Processing
Question 27
Which of the following is NOT a group of CVSS?
Select one:
a. Base
b. Temporal
c. Environmental
d. Human
The correct answer is: Human
Question 28
True or False: The systems engineer provides organizational expertise while the project manager provides technical expertise.
Select one:
True
False
The correct answer is 'False'.
Question 29
See Figure 2: CVSS Metrics and Equations. Which values are considered optional when reflecting the risk posed by the vulnerability to a user's environment?
Select one:
a. Base metrics plus vector
b. Temporal metrics
c. Environmental metrics
d. B and C
The correct answer is: B and C
Question 30
Potential distribution of the application. The specific activities in structured systems analysis:
Select one:
a. Develop a context diagram
b. Optionally, develop a state-transition diagram if building an on-line or real-time application
c. Develop a structured data dictionary
d. Develop a set of balanced data flow diagrams
The correct answer is: Develop a structured data dictionary
Question 31
Jenkins (2005) stated that the critical path is defined as:
Select one:
a. It is this path that you can traverse in order to reach completion of your project on time
b. It is this path that you must traverse in order to reach completion of your project on time
c. The critical path represents the ideal set of tasks to be complete for your project
d. The critical path represents a set of tasks to be complete for your project
The correct answer is: It is this path that you must traverse in order to reach completion of your project on time
Question 32
True or False: Identification does not refer to both Analysis and Design.
Select one:
True
False
The correct answer is 'False'.
Question 33
True or False: Traceability is proven at test or implementation time and validates that a requirement has been satisfied.
Select one:
True
False
The correct answer is 'True'.
Question 34
The R in CRUD matrix stands for:
Select one:
a. Repeat
b. Return
c. Report
d. Retrieve
The correct answer is: Retrieve
Question 35
An _______ is an entity from the real world whose processes and attributes (that is, the data) are modeled in a computerized application.
Select one:
a. abstract data type (ADT)
b. Class/objects
c. Object
d. class
The correct answer is: Object
Question 36
A Structured Walk-Through does not include this work product:
Select one:
a. Program code
b. Programmer
c. Test plan
d. Test design
The correct answer is: Programmer
Question 37
See Table 13-2; which methodology does not require Data Relationships knowledge?
Select one:
a. Process
b. Data
c. Object
d. None of the above
The correct answer is: Process
Question 38
How many types in "FIGURE 9-27 Types of Process Dependency Connections?"
Select one:
a. One
b. Two
c. Three
d. Five
The correct answer is: Five
Question 39
"TABLE 8-9 CASE Tools for Structured Design Program" code include all but:
Select one:
a. The Developer
b. Maestro
c. Oracle
d. Analyst/Designer Toolkit
The correct answer is: Oracle
Question 40
Project teams characterize risk by impact and likelihood. Which quadrant is high impact and high likelihood?
Select one:
a. Major
b. Critical
c. Minor
d. Major
The correct answer is: Critical
Question 41
True or False: There are three basic types of business programs: report, edit/validate, and file update.
Select one:
True
False
The correct answer is 'True'.
Question 42
True or False: The means to store unlimited, continuously growing databases currently are called data marts.
Select one:
True
False
The correct answer is 'False'.
Question 43
The list below are useful terms in expressing requirements specifications and can be abbreviated to stand for:
Select one:
a. START
b. STOP
c. SMART
d. None of the above
The correct answer is: SMART
Question 44
True or False: Figure 7-9 Example of Complex Context Diagram describes a inflows context called patients claims processing.
Select one:
True
False
The correct answer is 'True'.
Question 45
The Data Dictionary Process Contents does not include:
Select one:
a. Process Data
b. Process ID Number
c. Constraints (e.g., concurrence, sequential with another process, time-out, etc.)
d. Process Name
The correct answer is: Process Data
Question 46
Project Managers must exhibit all these qualities except:
Select one:
a. Understanding
b. Trust
c. Budgeting
d. Empathy
The correct answer is: Budgeting
Question 47
Useful tools for software engineers DO NOT include:
Select one:
a. process dependencies
b. synchronization matrix
c. process hierarchies
d. object diagrams.
The correct answer is: synchronization matrix
Question 48
The specific activities in structured systems analysis:
Select one:
a. Develop a context diagram
b. Optionally, develop a state-transition diagram if building an on-line or real-time application
c. Develop a structured data dictionary
d. Develop a set of balanced data flow diagrams
The correct answer is: Develop a structured data dictionary
Question 49
Figure 7-3 Sample Data Flow Diagram depicts data flowing from Process 2.0 to:
Select one:
a. File B
b. Process 3.0
c. Entity Name 1
d. Process 2.0
The correct answer is: Entity Name 1
Question 50
True or False: The Humphrey's maturity frameworks were developed for the Department of Defense as a self-assessment framework that identifies levels of computing and application development process maturity.
Select one:
True
False
The correct answer is 'True'.