Which of the following is NOT a major phase of information engineering?
Select one:
a. Enterprise Analysis
b. Business Area Analysis
c. Business System Analysis
d. Construction


The correct answer is: Business System Analysis
Question 2

Question text
Temporal Metrics include all but the following except:
Select one:
a. Environmental Metrics
b. Collateral Damage Potential (CDP)
c. Remediation Level (RL)
d. Report Confidence (RC)

The correct answer is: Environmental Metrics
Question 3

Question text
See Table 13-1; which methodology requires Business Entity Analysis?
Select one:
a. Process
b. Data
c. Object
d. None of the above

The correct answer is: Data
Question 4

Question text
See Figure 12-17; Which subdomain is responsible for service objects such as Define logical data access control and application presentation.
Select one:
a. Data.
b. Human.
c. Software.
d. Hardware/Operating System.


The correct answer is: Data.
Question 5

Question text
True or False: The purpose of a project plan is to maintain control of a project.
Select one:
True
False

The correct answer is 'True'.
Question 6

Question text
True or False:Risk is the relative impact that an exploited vulnerability would have to a user's environment.
Select one:
True
False

The correct answer is 'True'.
Question 7

Question text
According to Table 13-5; Which methodology is MOST predictable and consistent:

Select one:
a. Process
b. Data
c. Object
d. None of the above

The correct answer is: Data
Question 8

Question text
The _______ supports and sells the goals of the project throughout the organization:
Select one:
a. Project Manager
b. Sponsor
c. Champion
d. User


The correct answer is: Champion
Question 9

Question text
The Goal of 3NF Is to:
Select one:
a. Remove Repeating Groups
b. Remove Partial Key Dependencies
c. Remove Non-Repeating Groups
d. Remove Nonkey Dependencies Program code


The correct answer is: Remove Nonkey Dependencies Program code
Question 10

Question text
Jenkins (2005) listed the mythical man month diagram how many interfaces exist for a 5 person project.
Select one:
a. 1
b. 3
c. 6
d. 10


The correct answer is: 6
Question 11

Question text
FIGURE 7-3 Sample Data Flow Diagram depicts data flowing from Process 2.0 to:
Select one:
a. File B
b. Process 3.0
c. Entity Name 1
d. Process 2.0


The correct answer is: Entity Name 1
Question 12

Question text
All listed below are examples of stakeholders with the exception of:
Select one:
a. End user
b. Programmer
c. Executive
d. Expert


The correct answer is: Programmer
Question 13

Question text
True or False: In this diagram the activity production phase 1 can begin before specify requirements has completed.

Select one:
True
False

The correct answer is 'False'.
Question 14

Question text
True or False: Both ADW and IEF are CASE tools.
Select one:
True
False

The correct answer is 'True'.
Question 15

Question text
True or False: Data-oriented methods assume that, since data are unstable and processes are, data should be the main focus of activities.
Select one:
True
False

The correct answer is 'False'.
Question 16

Question text
Which of the following is NOT an element of a project plan:
Select one:
a. What location is involved
b. When it needs to be done by
c. Who is to do it
d. How it is to be achieved


The correct answer is: What location is involved
Question 17

Question text
True or False: The two major activities of data modeling are the creation and refinement of an enemy-relationship diagram (ERD) and entity structure analysis.
Select one:
True
False

The correct answer is 'False'.
Question 18

Question text
True or False: CASE tools can ONLY be used in single user versions and NOT multiuser.
Select one:
True
False

The correct answer is 'False'.
Question 19

Question text
A __________ is written by the PM and the SE and used to advertise a project to vendors to bid on.
Select one:
a. Bidding document
b. Project request
c. Request for bid
d. Request for proposal (RFP)


The correct answer is: Request for proposal (RFP)
Question 20

Question text
In "FIGURE 10-52 Example of Process Hierarchy Diagram," which of the following is NOT one of the four sub processes of sales?

Select one:
a. Data fulfillment
b. Prospect maintenance
c. Data security
d. Inventory fulfillment


The correct answer is: Data fulfillment
Question 21

Question text
An important part of the maintainability is to make all which of the following available:
Select one:
a. Project documentation
b. Design documentation
c. Supporting material
d. All of the above


The correct answer is: All of the above
Question 22

Question text
Based on this diagram return on investment (ROI) will be reached:

Select one:
a. 1 year
b. 2 years
c. 3 years
d. None of the above


The correct answer is: None of the above
Question 23

Question text
Two methods of analyzing methodology classes are:
Select one:
a. Information systems methodology framework
b. Humphrey's maturity framework
c. Information systems methodology framework and Humphrey's maturity framework
d. None of these

The correct answer is: Information systems methodology framework and Humphrey's maturity framework
Question 24

Question text
Boilerplate code means that the code:
Select one:
a. does vary from one program to another
b. is critical to maintaining applications at the functional level rather than at the code level.
c. does not vary from one program to another
d. meaning not changeable after it is accepted as complete, motivates users to be as complete in their thinking as possible


The correct answer is: does not vary from one program to another
Question 25

Question text
True or False: Cohesion is a measure of the external strength of a module with the notion that maximal, or functional, cohesion is the goal.
Select one:
True
False

The correct answer is 'False'.
Question 26

Question text
True or False: Vulnerability is a bug, flaw, weakness, or exposure of an application, system, device, or service that could lead to a failure of confidentiality, integrity, or availability.
Select one:
True
False

The correct answer is 'True'.
Question 27

Question text
A ____ test is performed for each of the smallest units of code?
Select one:
a. Regression
b. System
c. Integration
d. Unit


The correct answer is: Unit
Question 28

Question text
True or False: Identification does not refer to both Analysis and Design.
Select one:
True
False

The correct answer is 'False'.
Question 29

Question text
True or False: The code validation file has the validation role for Process 1.2.
Select one:
True
False

The correct answer is 'False'.
Question 30

Question text
True or False: Data-oriented design uses data as the basis for clustering processes, building databases, and identifying.
Select one:
True
False

The correct answer is 'True'.
Question 31

Question text
True or False: The scope triangle is NOT also called the quality triangle.
Select one:
True
False

The correct answer is 'False'.
Question 32

Question text
In "FIGURE 9-24 Decomposition for Customer and Video Maintenance Remove Repeating Groups," which processes are decomposed?
Select one or more:
a. Rental/Return
b. Accounting
c. Purchasing
d. Personnel / payroll


The correct answer is: Rental/Return, Purchasing
Question 33

Question text
Horizontal (or Subset) Data Partitioning:
Select one:
a. Complete 'records' or tuples of data are stored with different data in more than one location.
b. Data are copied in more than one location.
c. Partial 'records' or tuples of data are stored in more than one location.
d. Different data are completely stored in more than one location.
Some data may be accessed by remote sites.


The correct answer is: Partial 'records' or tuples of data are stored in more than one location.
Question 34

Question text
Table III-3 discusses all but:
Select one:
a. Document
b. Review
c. Coding
d. Identification


The correct answer is: Coding
Question 35

Question text
True or False: The purpose of the regression test is to ensure that the changes cause the application to regress to a functional state, that is, that the changes do introduce errors into the processing.
Select one:
True
False

The correct answer is 'False'.
Question 36

Question text
The specific activities in structured systems analysis:
Select one:
a. Develop a context diagram
b. Optionally, develop a state-transition diagram if building an on-line or real-time application
c. Develop a structured data dictionary
d. Develop a set of balanced data flow diagrams


The correct answer is: Develop a structured data dictionary
Question 37

Question text
True or False: Computer-aided software engineering (CASE) tools automate the hardware engineering process.
Select one:
True
False

The correct answer is 'False'.
Question 38

Question text
True or False: The code validation file has the validation role for Process 1.
Select one:
True
False

The correct answer is 'False'.
Question 39

Question text
True or False: White-box testing evaluates specific execute item logic to guarantee its proper functioning.
Select one:
True
False

The correct answer is 'True'.
Question 40

Question text
In the following development project schedule what is the deliverable for the acceptance testing phase:

Select one:
a. Project proposal
b. Requirements Spec
c. Alpha
d. Release system


The correct answer is: Release system
Question 41

Question text
True or False: Software engineering is the systematic application of tools and techniques in the development of computer-based applications.
Select one:
True
False

The correct answer is 'True'.
Question 42

Question text
Which is NOT a phase of project lifecycle (PLC)?
Select one:
a. Analysis and Design
b. Project Initiation
c. System Retirement
d. Preparation for Software Engineering


The correct answer is: System Retirement
Question 43

Question text
True or False: Scope encompasses your vision, but NOT your goal.
Select one:
True
False

The correct answer is 'False'.
Question 44

Question text
The Common Vulnerability Scoring System (CVSS) is an open framework that addresses what issue?
Select one:
a. Identifying and assessing vulnerabilities across many disparate software platforms
b. Identifying and assessing vulnerabilities across many disparate hardware platforms
c. Identifying and assessing vulnerabilities across many disparate hardware and software platforms
d. None of the above

The correct answer is: Identifying and assessing vulnerabilities across many disparate hardware and software platforms
Question 45

Question text
Legacy Systems are in what phase?
Select one:
a. design
b. installation
c. operations
d. maintenance

The correct answer is: maintenance
Question 46

Question text
Environmental Metrics include all the following except:
Select one:
a. Collateral Damage Potential (CDP)
b. Target Distribution (TD)
c. Security Requirements (CR, IR, AR)
d. Temporal vector's

The correct answer is: Temporal vector's
Question 47

Question text
The process diagram defines the hardware environment and shows process assignments to software.
Select one:
True
False

The correct answer is 'False'.
Question 48

Question text
Software engineers are involved in these activities in which correct order:
Select one:
a. Development, operation, maintenance or retirement
b. Operation, development, retirement and maintenance
c. Development, operation, maintenance and retirement
d. Operation, development, maintenance and retirement


The correct answer is: Development, operation, maintenance and retirement
Question 49

Question text
A __________work product is a product that is considered complete and that is the basis for other, current work by the project development team.
Select one:
a. Baseline
b. Change request
c. checklist
d. Change Control File


The correct answer is: Baseline
Question 50

Question text
A Structured Walk-Through does not include which work product?
Select one:
a. Program code
b. Programmer
c. Test plan
d. Test design


The correct answer is: Programmer
A Structured Walk-Through does not include this work product:
Select one:
a. Program code
b. Programmer
c. Test plan
d. Test design


The correct answer is: Programmer
Question 2

Question text
See Table 13-1; which methodology requires human interface guidelines?
Select one:
a. Process
b. Data
c. Object
d. None of the above

The correct answer is: Object
Question 3

Question text
The video store case study in chapter 2 includes requirements for customer, video and ___________.
Select one:
a. Rental Processing
b. Software
c. Hardware
d. Networks


The correct answer is: Rental Processing
Question 4

Question text
True/False: Booch diagram are used to summarize the objects-both application and service - and their interactions.
Select one:
True
False

The correct answer is 'True'.
Question 5

Question text
True or False: Software engineering is the systematic application of tools and techniques in the development of computer-based applications.
Select one:
True
False

The correct answer is 'True'.
Question 6

Question text
Legacy Systems are in what phase?
Select one:
a. design
b. installation
c. operations
d. maintenance

The correct answer is: maintenance
Question 7

Question text
True or False: Encapsulated Objects can have both Public or Private Parts.
Select one:
True
False

The correct answer is 'False'.
Question 8

Question text
True or False: The purpose of the regression test is to ensure that the changes cause the application to regress to a functional state, that is, that the changes do introduce errors into the processing.
Select one:
True
False

The correct answer is 'False'.
Question 9

Question text
There are five rules of scheduling; which of the following is NOT one of them:
Select one:
a. Eliminate uncertainty wherever you can
b. Pick the right level of granularity
c. Take a vacation
d. Analyst/Designer Toolkit


The correct answer is: Take a vacation
Question 10

Question text
The list below are useful terms in expressing requirements specifications and can be abbreviated to stand for:

Select one:
a. START
b. STOP
c. SMART
d. None of the above


The correct answer is: SMART
Question 11

Question text
A __________ is written by the PM and the SE and used to advertise a project to vendors to bid on.
Select one:
a. Bidding document
b. Project request
c. Request for bid
d. Request for proposal (RFP)


The correct answer is: Request for proposal (RFP)
Question 12

Question text
True or False: Scope encompasses your vision, but NOT your goal.
Select one:
True
False

The correct answer is 'False'.
Question 13

Question text
True or False: Computer-aided software engineering (CASE) tools automate the hardware engineering process.
Select one:
True
False

The correct answer is 'False'.
Question 14

Question text
True or False: White-box testing evaluates specific execute item logic to guarantee its proper functioning.
Select one:
True
False

The correct answer is 'True'.
Question 15

Question text
True or False: Computer-aided software engineering (CASE) tools automate the hardware engineering process.
Select one:
True
False

The correct answer is 'False'.
Question 16

Question text
Jenkins (2005) listed the mythical man month diagram how many interfaces exist for a 5 person project.
Select one:
a. 1
b. 3
c. 6
d. 10


The correct answer is: 6
Question 17

Question text
All listed below are examples of stakeholders with the exception of:
Select one:
a. End user
b. Programmer
c. Executive
d. Expert


The correct answer is: Programmer
Question 18

Question text
The _______ supports and sells the goals of the project throughout the organization:
Select one:
a. Project Manager
b. Sponsor
c. Champion
d. User


The correct answer is: Champion
Question 19

Question text
True or False: In this diagram the activity production phase 1 can begin before specify requirements has completed.

Select one:
True
False

The correct answer is 'False'.
Question 20

Question text
In the following development project schedule what is the deliverable for the acceptance testing phase:

Select one:
a. Project proposal
b. Requirements Spec
c. Alpha
d. Release system


The correct answer is: Release system
Question 21

Question text
The major activities of structured design are all except:
Select one:
a. Develop program specifications
b. Transform or transaction analysis of DFD
c. Define the logical database
d. Refine and complete structure chart


The correct answer is: Define the logical database
Question 22

Question text
True or False: The code validation file has the validation role for Process 1.2.
Select one:
True
False

The correct answer is 'False'.
Question 23

Question text
Which is NOT a phase of project lifecycle (PLC)?
Select one:
a. Analysis and Design
b. Project Initiation
c. System Retirement
d. Preparation for Software Engineering


The correct answer is: System Retirement
Question 24

Question text
True or False: Information systems methodology framework is NOT used to compare methodologies.
Select one:
True
False

The correct answer is 'False'.
Question 25

Question text
True or False: Booch diagrams are also called module structure diagrams.
Select one:
True
False

The correct answer is 'True'.
Question 26

Question text
True or False: The two major activities of data modeling are the creation and refinement of an enemy-relationship diagram (ERD) and entity structure analysis.
Select one:
True
False

The correct answer is 'False'.
Question 27

Question text
The R in CRUD matrix stands for:
Select one:
a. Repeat
b. Return
c. Report
d. Retrieve


The correct answer is: Retrieve
Question 28

Question text
Table 12-1 Object-Oriented Design Documentation; how many (tables and diagrams):
Select one:
a. 3,3
b. 4,3
c. 4,4
d. 3,4


The correct answer is: 3,4
Question 29

Question text
True or False: Vulnerability is a bug, flaw, weakness, or exposure of an application, system, device, or service that could lead to a failure of confidentiality, integrity, or availability.
Select one:
True
False

The correct answer is 'True'.
Question 30

Question text
True or False: The means to store unlimited, continuously growing databases currently are called data marts.
Select one:
True
False

The correct answer is 'False'.
Question 31

Question text
The specific activities in structured systems analysis:
Select one:
a. Develop a context diagram
b. Optionally, develop a state-transition diagram if building an on-line or real-time application
c. Develop a structured data dictionary
d. Develop a set of balanced data flow diagrams


The correct answer is: Develop a structured data dictionary
Question 32

Question text
See Figure 2: CVSS Metrics and Equations. Which values are considered optional when reflecting the risk posed by the vulnerability to a user's environment?
Select one:
a. Base metrics plus vector
b. Temporal metrics
c. Environmental metrics
d. B and C

The correct answer is: B and C
Question 33

Question text
True or False: Cohesion is a measure of the external strength of a module with the notion that maximal, or functional, cohesion is the goal.
Select one:
True
False

The correct answer is 'False'.
Question 34

Question text
A ____ test is performed for each of the smallest units of code?
Select one:
a. Regression
b. System
c. Integration
d. Unit


The correct answer is: Unit
Question 35

Question text
Jenkins (2005) stated that the critical path is defined as:
Select one:
a. It is this path that you can traverse in order to reach completion of your project on time
b. It is this path that you must traverse in order to reach completion of your project on time
c. The critical path represents the ideal set of tasks to be complete for your project
d. The critical path represents a set of tasks to be complete for your project


The correct answer is: It is this path that you must traverse in order to reach completion of your project on time
Question 36

Question text
Boilerplate code means that the code:
Select one:
a. does vary from one program to another
b. is critical to maintaining applications at the functional level rather than at the code level.
c. does not vary from one program to another
d. meaning not changeable after it is accepted as complete, motivates users to be as complete in their thinking as possible


The correct answer is: does not vary from one program to another
Question 37

Question text
True or False: In a required relationship, the entity must be present for the other entity to exist. In an optional relationship, the entity must be present for the other entity to exist.
Select one:
True
False

The correct answer is 'True'.
Question 38

Question text
True or False:Risk is the relative impact that an exploited vulnerability would have to a user's environment.
Select one:
True
False

The correct answer is 'True'.
Question 39

Question text
Table III-3 discusses all but:
Select one:
a. Document
b. Review
c. Coding
d. Identification


The correct answer is: Coding
Question 40

Question text
Project Managers must exhibit all these qualities except:
Select one:
a. Understanding
b. Trust
c. Budgeting
d. Empathy


The correct answer is: Budgeting
Question 41

Question text
How many types in "FIGURE 9-27 Types of Process Dependency Connections?"
Select one:
a. One
b. Two
c. Three
d. Five


The correct answer is: Five
Question 42

Question text
The Common Vulnerability Scoring System (CVSS) is an open framework that addresses what issue?
Select one:
a. Identifying and assessing vulnerabilities across many disparate software platforms
b. Identifying and assessing vulnerabilities across many disparate hardware platforms
c. Identifying and assessing vulnerabilities across many disparate hardware and software platforms
d. None of the above

The correct answer is: Identifying and assessing vulnerabilities across many disparate hardware and software platforms
Question 43

Question text
True or False: The Humphrey's maturity frameworks were developed for the Department of Defense as a self-assessment framework that identifies levels of computing and application development process maturity.
Select one:
True
False

The correct answer is 'True'.
Question 44

Question text
An important part of the maintainability is to make all which of the following available:
Select one:
a. Project documentation
b. Design documentation
c. Supporting material
d. All of the above


The correct answer is: All of the above
Question 45

Question text
True or False: There are three basic types of business programs: report, edit/validate, and file update.
Select one:
True
False

The correct answer is 'True'.
Question 46

Question text
Potential distribution of the application. The specific activities in structured systems analysis:
Select one:
a. Develop a context diagram
b. Optionally, develop a state-transition diagram if building an on-line or real-time application
c. Develop a structured data dictionary
d. Develop a set of balanced data flow diagrams


The correct answer is: Develop a structured data dictionary
Question 47

Question text
Horizontal (or Subset) Data Partitioning:
Select one:
a. Complete 'records' or tuples of data are stored with different data in more than one location.
b. Data are copied in more than one location.
c. Partial 'records' or tuples of data are stored in more than one location.
d. Different data are completely stored in more than one location.
Some data may be accessed by remote sites.


The correct answer is: Partial 'records' or tuples of data are stored in more than one location.
Question 48

Question text
Which of the following is NOT a major phase of information engineering?
Select one:
a. Enterprise Analysis
b. Business Area Analysis
c. Business System Analysis
d. Construction


The correct answer is: Business System Analysis
Question 49

Question text
"TABLE 8-9 CASE Tools for Structured Design Program" code include all but:

Select one:
a. The Developer
b. Maestro
c. Oracle
d. Analyst/Designer Toolkit


The correct answer is: Oracle
Question 50

Question text
The Base Metrics include all the following except:
Select one:
a. Access Vector
b. Authentication
c. Confidentiality, Integrity, Availability
d. Confidentiality, Integrity, Availability Impacts

The correct answer is: Confidentiality, Integrity, Availability
The Data Dictionary Process Contents does not include:
Select one:
a. Process Data
b. Process ID Number
c. Constraints (e.g., concurrence, sequential with another process, time-out, etc.)
d. Process Name


The correct answer is: Process Data
Question 2

Question text
True or False: The systems engineer provides organizational expertise while the project manager provides technical expertise.
Select one:
True
False

The correct answer is 'False'.
Question 3

Question text
The Goal of 3NF Is to:
Select one:
a. Remove Repeating Groups
b. Remove Partial Key Dependencies
c. Remove Non-Repeating Groups
d. Remove Nonkey Dependencies Program code


The correct answer is: Remove Nonkey Dependencies Program code
Question 4

Question text
True or False: Data-oriented design uses data as the basis for clustering processes, building databases, and identifying.
Select one:
True
False

The correct answer is 'True'.
Question 5

Question text
"FIGURE 9-7 ABC Video Partial Functional Decomposition of Purchasing" is a:
Select one:
a. Program code
b. Process flow
c. Function
d. Data flow


The correct answer is: Process flow
Question 6

Question text
True/False: Object oriented design has seven steps.
Select one:
True
False

The correct answer is 'True'.
Question 7

Question text
True or False: Sometimes referred to as a ‘business case’, the project proposal states the lowest level goals in a project.
Select one:
True
False

The correct answer is 'False'.
Question 8

Question text
Two methods of analyzing methodology classes are:
Select one:
a. Information systems methodology framework
b. Humphrey's maturity framework
c. Information systems methodology framework and Humphrey's maturity framework
d. None of these

The correct answer is: Information systems methodology framework and Humphrey's maturity framework
Question 9

Question text
True or False: Encapsulated Objects can have both Public or Private Parts.
Select one:
True
False

The correct answer is 'False'.
Question 10

Question text
Environmental Metrics include all the following except:
Select one:
a. Collateral Damage Potential (CDP)
b. Target Distribution (TD)
c. Security Requirements (CR, IR, AR)
d. Temporal vector's

The correct answer is: Temporal vector's
Question 11

Question text
The purpose of the Sample Change Request Impact Form:
Select one:
a. Document the priority for the action, and the cost and schedule of the change
b. The PM and SE define the schedule and cost.
c. The PM and SE redefine the schedule and the cost.
d. impacts of the change document the priority for the action, and the cost and schedule of the change.


The correct answer is: impacts of the change document the priority for the action, and the cost and schedule of the change.
Question 12

Question text
Based on this diagram return on investment (ROI) will be reached:

Select one:
a. 1 year
b. 2 years
c. 3 years
d. None of the above


The correct answer is: None of the above
Question 13

Question text
The Data Dictionary Process Contents does not include:
Select one:
a. Process Data
b. Process ID Number
c. Constraints (e.g., concurrence, sequential with another process, time-out, etc.)
d. Process Name


The correct answer is: Process Data
Question 14

Question text
See Table 13-1; which methodology requires Business Entity Analysis?
Select one:
a. Process
b. Data
c. Object
d. None of the above

The correct answer is: Data
Question 15

Question text
A __________work product is a product that is considered complete and that is the basis for other, current work by the project development team.
Select one:
a. Baseline
b. Change request
c. checklist
d. Change Control File


The correct answer is: Baseline
Question 16

Question text
True or False: The product or project can be accepted even if acceptance testing is not complete.
Select one:
True
False

The correct answer is 'False'.
Question 17

Question text
True or False: Program specifications document the program's purpose, process requirements, the logical and physical data definitions, input and output formats, screen layouts, constraints, and special processing considerations that might complicate the program.
Select one:
True
False

The correct answer is 'True'.
Question 18

Question text
True or False: The code validation file has the validation role for Process 1.2.
Select one:
True
False

The correct answer is 'False'.
Question 19

Question text
True or False: Both ADW and IEF are CASE tools.
Select one:
True
False

The correct answer is 'True'.
Question 20

Question text
True or False: Data-oriented methods assume that, since data are unstable and processes are, data should be the main focus of activities.
Select one:
True
False

The correct answer is 'False'.
Question 21

Question text
Which of the following is NOT an element of a project plan:
Select one:
a. What location is involved
b. When it needs to be done by
c. Who is to do it
d. How it is to be achieved


The correct answer is: What location is involved
Question 22

Question text
The results of structured design are all BUT the following:
Select one:
a. programming specifications
b. plans for testing
c. conversation
d. training and installation


The correct answer is: conversation
Question 23

Question text
Temporal Metrics include all but the following except:
Select one:
a. Environmental Metrics
b. Collateral Damage Potential (CDP)
c. Remediation Level (RL)
d. Report Confidence (RC)

The correct answer is: Environmental Metrics
Question 24

Question text
True or False: The purpose of a project plan is to maintain control of a project.
Select one:
True
False

The correct answer is 'True'.
Question 25

Question text
True or False: In "FIGURE 9-17 ABC Rental Processing-First-Cut Entity-Relationship Diagram," the three entities are: Customer, Video, Rental and Request.
Select one:
True
False

The correct answer is 'False'.
Question 26

Question text
Software engineers are involved in these activities in which correct order:
Select one:
a. Development, operation, maintenance or retirement
b. Operation, development, retirement and maintenance
c. Development, operation, maintenance and retirement
d. Operation, development, maintenance and retirement


The correct answer is: Development, operation, maintenance and retirement
Question 27

Question text
True or False: Figure 7-9 Example of Complex Context Diagram describes a inflows context called patients claims processing.
Select one:
True
False

The correct answer is 'True'.
Question 28

Question text
In "FIGURE 9-24 Decomposition for Customer and Video Maintenance Remove Repeating Groups," which processes are decomposed?
Select one or more:
a. Rental/Return
b. Accounting
c. Purchasing
d. Personnel / payroll


The correct answer is: Rental/Return, Purchasing
Question 29

Question text
True or False: The scope triangle is NOT also called the quality triangle.
Select one:
True
False

The correct answer is 'False'.
Question 30

Question text
Which goal is stated in a clear and concise manner and more likely to inspire team members to achieve it?
Select one:
a. “To deliver the cheapest system, in the shortest time, that just about gets the job done”
b. “To deliver the best sales and marketing system on the market”
c. “To deliver the cheapest system, in the shortest time, that almost gets the job done”
d. “To deliver a sales and marketing system on time”


The correct answer is: “To deliver the best sales and marketing system on the market”
Question 31

Question text
True or False: Data requirements for applications include: input, output, storage, and retrieval.
Select one:
True
False

The correct answer is 'True'.
Question 32

Question text
See Table 13-2; which methodology does not require Data Relationships knowledge?
Select one:
a. Process
b. Data
c. Object
d. None of the above

The correct answer is: Process
Question 33

Question text
A Structured Walk-Through does not include this work product:
Select one:
a. Program code
b. Programmer
c. Test plan
d. Test design


The correct answer is: Programmer
Question 34

Question text
Figure 7-3 Sample Data Flow Diagram depicts data flowing from Process 2.0 to:
Select one:
a. File B
b. Process 3.0
c. Entity Name 1
d. Process 2.0


The correct answer is: Entity Name 1
Question 35

Question text
An _______ is an entity from the real world whose processes and attributes (that is, the data) are modeled in a computerized application.
Select one:
a. abstract data type (ADT)
b. Class/objects
c. Object
d. class


The correct answer is: Object
Question 36

Question text
Useful tools for software engineers DO NOT include:
Select one:
a. process dependencies
b. synchronization matrix
c. process hierarchies
d. object diagrams.


The correct answer is: synchronization matrix
Question 37

Question text
True or False: Threat is the likelihood or frequency of a harmful event occurring.
Select one:
True
False

The correct answer is 'True'.
Question 38

Question text
True or False: Traceability is proven at test or implementation time and validates that a requirement has been satisfied.
Select one:
True
False

The correct answer is 'True'.
Question 39

Question text
The critical path of a project is defined as:
Select one:
a. Shortest sequence of dependent tasks to project completion.
b. The sequence of dependent tasks that together take the most time. If any of the tasks are delayed, the project is also delayed
c. The sequence of dependent tasks that together take the least time. If any of the tasks are delayed, the project can complete on time.
d. Longest sequence of dependent tasks to project completion.


The correct answer is: The sequence of dependent tasks that together take the most time. If any of the tasks are delayed, the project is also delayed
Question 40

Question text
Project teams characterize risk by impact and likelihood. Which quadrant is high impact and high likelihood?

Select one:
a. Major
b. Critical
c. Minor
d. Major


The correct answer is: Critical
Question 41

Question text
True or False: Booch diagrams are also called module structure diagrams.
Select one:
True
False

The correct answer is 'True'.
Question 42

Question text
Which of the following is NOT a group of CVSS?
Select one:
a. Base
b. Temporal
c. Environmental
d. Human

The correct answer is: Human
Question 43

Question text
According to Table 13-5; Which methodology is MOST predictable and consistent:

Select one:
a. Process
b. Data
c. Object
d. None of the above

The correct answer is: Data
Question 44

Question text
The purpose of the system test is:
Select one:
a. demonstrate an application's ability to operate satisfactorily in the actual production environment using its intended hardware and software configuration.
b. is a system test and NOT a documentation test.
c. test to demonstrate an application's ability to operate satisfactorily in a simulated production environment using its intended hardware and software configuration.
d. ensure that the changes do not cause the application to regress to a nonfunctional state, that is, that the changes do not introduce errors into the processing.


The correct answer is: test to demonstrate an application's ability to operate satisfactorily in a simulated production environment using its intended hardware and software configuration.
Question 45

Question text
Restructuring is:
Select one:
a. the redevelopment of a portion of an application with a bridge to the old application.
b. is the reverse analysis of an old application to conform to a new methodology, usually Information Engineering or object orientation.
c. is also known as reverse engineering. Rebuilding is the retirement and redevelopment of an application.
d. the redevelopment of an application with a bridge to the old application.


The correct answer is: the redevelopment of a portion of an application with a bridge to the old application.
Question 46

Question text
True or False: The Temporal group reflects the intrinsic qualities of a vulnerability.
Select one:
True
False

The correct answer is 'False'.
Question 47

Question text
____ are input data created to demonstrate that both components and the total system satisfy all design requirements.
Select one:
a. Test plan
b. Test strategy
c. Test cases
d. Subsystem testing


The correct answer is: Test cases
Question 48

Question text
True or False: In many projects the change management system is NOT linked to (or is part of) a defect tracking.
Select one:
True
False

The correct answer is 'False'.
Question 49

Question text
In "FIGURE 10-52 Example of Process Hierarchy Diagram," which of the following is NOT one of the four sub processes of sales?

Select one:
a. Data fulfillment
b. Prospect maintenance
c. Data security
d. Inventory fulfillment


The correct answer is: Data fulfillment
Question 50

Question text
True or False: CASE tools can ONLY be used in single user versions and NOT multiuser.
Select one:
True
False

The correct answer is 'False'.
True or False: Data requirements for applications include: input, output, storage, and retrieval.
Select one:
True
False

The correct answer is 'True'.
Question 2

Question text
The Project Manager’s job is to:
Select one:
a. Must understand the customer requirements for the team and keep the SE’s on track.
b. Leads the design, coding and testing effort. Decides which process to use (data, or object oriented design) and directs and reviews the SE2 products.
c. Leads the team and is responsible for the final product quality and timeliness.
d. Documents the figures, diagrams for process, data, or object oriented design.
e. Constructs schedule and milestones and keeps the PM informed and on schedule.


The correct answer is: Leads the team and is responsible for the final product quality and timeliness.
Question 3

Question text
True or False: White-box testing evaluates specific execute item logic to guarantee its proper functioning.
Select one:
True
False

The correct answer is 'True'.
Question 4

Question text
The process diagram defines the hardware environment and shows process assignments to software.
Select one:
True
False

The correct answer is 'False'.
Question 5

Question text
True or False: In a required relationship, the entity must be present for the other entity to exist. In an optional relationship, the entity must be present for the other entity to exist.
Select one:
True
False

The correct answer is 'True'.
Question 6

Question text
In "FIGURE 9-24 Decomposition for Customer and Video Maintenance Remove Repeating Groups," which processes are decomposed?
Select one or more:
a. Rental/Return
b. Accounting
c. Purchasing
d. Personnel / payroll


The correct answer is: Rental/Return, Purchasing
Question 7

Question text
True or False: Both ADW and IEF are CASE tools.
Select one:
True
False

The correct answer is 'True'.
Question 8

Question text
True or False: The scope triangle is NOT also called the quality triangle.
Select one:
True
False

The correct answer is 'False'.
Question 9

Question text
True or False: CASE tools can ONLY be used in single user versions and NOT multiuser.
Select one:
True
False

The correct answer is 'False'.
Question 10

Question text
FIGURE 7-3 Sample Data Flow Diagram depicts data flowing from Process 2.0 to:
Select one:
a. File B
b. Process 3.0
c. Entity Name 1
d. Process 2.0


The correct answer is: Entity Name 1
Question 11

Question text
Jenkins (2005) stated that the critical path is defined as:
Select one:
a. It is this path that you can traverse in order to reach completion of your project on time
b. It is this path that you must traverse in order to reach completion of your project on time
c. The critical path represents the ideal set of tasks to be complete for your project
d. The critical path represents a set of tasks to be complete for your project


The correct answer is: It is this path that you must traverse in order to reach completion of your project on time
Question 12

Question text
True or False: In many projects the change management system is NOT linked to (or is part of) a defect tracking.
Select one:
True
False

The correct answer is 'False'.
Question 13

Question text
True or False: Data-oriented methods assume that, since data are unstable and processes are, data should be the main focus of activities.
Select one:
True
False

The correct answer is 'False'.
Question 14

Question text
Restructuring is:
Select one:
a. the redevelopment of a portion of an application with a bridge to the old application.
b. is the reverse analysis of an old application to conform to a new methodology, usually Information Engineering or object orientation.
c. is also known as reverse engineering. Rebuilding is the retirement and redevelopment of an application.
d. the redevelopment of an application with a bridge to the old application.


The correct answer is: the redevelopment of a portion of an application with a bridge to the old application.
Question 15

Question text
True or False: Computer-aided software engineering (CASE) tools automate the hardware engineering process.
Select one:
True
False

The correct answer is 'False'.
Question 16

Question text
How many types in "FIGURE 9-27 Types of Process Dependency Connections?"
Select one:
a. One
b. Two
c. Three
d. Five


The correct answer is: Five
Question 17

Question text
True or False: Threat is the likelihood or frequency of a harmful event occurring.
Select one:
True
False

The correct answer is 'True'.
Question 18

Question text
True or False: Identification does not refer to both Analysis and Design.
Select one:
True
False

The correct answer is 'False'.
Question 19

Question text
True or False: The purpose of a project plan is to maintain control of a project.
Select one:
True
False

The correct answer is 'True'.
Question 20

Question text
Jenkins (2005) listed the mythical man month diagram how many interfaces exist for a 5 person project.
Select one:
a. 1
b. 3
c. 6
d. 10


The correct answer is: 6
Question 21

Question text
Figure 7-3 Sample Data Flow Diagram depicts data flowing from Process 2.0 to:
Select one:
a. File B
b. Process 3.0
c. Entity Name 1
d. Process 2.0


The correct answer is: Entity Name 1
Question 22

Question text
True or False: Figure 7-9 Example of Complex Context Diagram describes a inflows context called patients claims processing.
Select one:
True
False

The correct answer is 'True'.
Question 23

Question text
According to Table 13-5; Which methodology is MOST predictable and consistent:

Select one:
a. Process
b. Data
c. Object
d. None of the above

The correct answer is: Data
Question 24

Question text
Two methods of analyzing methodology classes are:
Select one:
a. Information systems methodology framework
b. Humphrey's maturity framework
c. Information systems methodology framework and Humphrey's maturity framework
d. None of these

The correct answer is: Information systems methodology framework and Humphrey's maturity framework
Question 25

Question text
True or False: Data-oriented design uses data as the basis for clustering processes, building databases, and identifying.
Select one:
True
False

The correct answer is 'True'.
Question 26

Question text
Potential distribution of the application. The specific activities in structured systems analysis:
Select one:
a. Develop a context diagram
b. Optionally, develop a state-transition diagram if building an on-line or real-time application
c. Develop a structured data dictionary
d. Develop a set of balanced data flow diagrams


The correct answer is: Develop a structured data dictionary
Question 27

Question text
Boilerplate code means that the code:
Select one:
a. does vary from one program to another
b. is critical to maintaining applications at the functional level rather than at the code level.
c. does not vary from one program to another
d. meaning not changeable after it is accepted as complete, motivates users to be as complete in their thinking as possible


The correct answer is: does not vary from one program to another
Question 28

Question text
An important part of the maintainability is to make all which of the following available:
Select one:
a. Project documentation
b. Design documentation
c. Supporting material
d. All of the above


The correct answer is: All of the above
Question 29

Question text
"TABLE 8-9 CASE Tools for Structured Design Program" code include all but:

Select one:
a. The Developer
b. Maestro
c. Oracle
d. Analyst/Designer Toolkit


The correct answer is: Oracle
Question 30

Question text
The specific activities in structured systems analysis:
Select one:
a. Develop a context diagram
b. Optionally, develop a state-transition diagram if building an on-line or real-time application
c. Develop a structured data dictionary
d. Develop a set of balanced data flow diagrams


The correct answer is: Develop a structured data dictionary
Question 31

Question text
Table III-3 discusses all but:
Select one:
a. Document
b. Review
c. Coding
d. Identification


The correct answer is: Coding
Question 32

Question text
The video store case study in chapter 2 includes requirements for customer, video and ___________.
Select one:
a. Rental Processing
b. Software
c. Hardware
d. Networks


The correct answer is: Rental Processing
Question 33

Question text
See Table 13-1; which methodology requires human interface guidelines?
Select one:
a. Process
b. Data
c. Object
d. None of the above

The correct answer is: Object
Question 34

Question text
The Base Metrics include all the following except:
Select one:
a. Access Vector
b. Authentication
c. Confidentiality, Integrity, Availability
d. Confidentiality, Integrity, Availability Impacts

The correct answer is: Confidentiality, Integrity, Availability
Question 35

Question text
Which goal is stated in a clear and concise manner and more likely to inspire team members to achieve it?
Select one:
a. “To deliver the cheapest system, in the shortest time, that just about gets the job done”
b. “To deliver the best sales and marketing system on the market”
c. “To deliver the cheapest system, in the shortest time, that almost gets the job done”
d. “To deliver a sales and marketing system on time”


The correct answer is: “To deliver the best sales and marketing system on the market”
Question 36

Question text
A ____ test is performed for each of the smallest units of code?
Select one:
a. Regression
b. System
c. Integration
d. Unit


The correct answer is: Unit
Question 37

Question text
True or False: The Temporal group reflects the intrinsic qualities of a vulnerability.
Select one:
True
False

The correct answer is 'False'.
Question 38

Question text
True or False: In this diagram the activity production phase 1 can begin before specify requirements has completed.

Select one:
True
False

The correct answer is 'False'.
Question 39

Question text
Which is NOT a phase of project lifecycle (PLC)?
Select one:
a. Analysis and Design
b. Project Initiation
c. System Retirement
d. Preparation for Software Engineering


The correct answer is: System Retirement
Question 40

Question text
True/False: Booch diagram are used to summarize the objects-both application and service - and their interactions.
Select one:
True
False

The correct answer is 'True'.
Question 41

Question text
True or False: In "FIGURE 9-17 ABC Rental Processing-First-Cut Entity-Relationship Diagram," the three entities are: Customer, Video, Rental and Request.
Select one:
True
False

The correct answer is 'False'.
Question 42

Question text
The major activities of structured design are all except:
Select one:
a. Develop program specifications
b. Transform or transaction analysis of DFD
c. Define the logical database
d. Refine and complete structure chart


The correct answer is: Define the logical database
Question 43

Question text
There are five rules of scheduling; which of the following is NOT one of them:
Select one:
a. Eliminate uncertainty wherever you can
b. Pick the right level of granularity
c. Take a vacation
d. Analyst/Designer Toolkit


The correct answer is: Take a vacation
Question 44

Question text
The Common Vulnerability Scoring System (CVSS) is an open framework that addresses what issue?
Select one:
a. Identifying and assessing vulnerabilities across many disparate software platforms
b. Identifying and assessing vulnerabilities across many disparate hardware platforms
c. Identifying and assessing vulnerabilities across many disparate hardware and software platforms
d. None of the above

The correct answer is: Identifying and assessing vulnerabilities across many disparate hardware and software platforms
Question 45

Question text
True or False: The systems engineer provides organizational expertise while the project manager provides technical expertise.
Select one:
True
False

The correct answer is 'False'.
Question 46

Question text
The critical path of a project is defined as:
Select one:
a. Shortest sequence of dependent tasks to project completion.
b. The sequence of dependent tasks that together take the most time. If any of the tasks are delayed, the project is also delayed
c. The sequence of dependent tasks that together take the least time. If any of the tasks are delayed, the project can complete on time.
d. Longest sequence of dependent tasks to project completion.


The correct answer is: The sequence of dependent tasks that together take the most time. If any of the tasks are delayed, the project is also delayed
Question 47

Question text
True or False:Risk is the relative impact that an exploited vulnerability would have to a user's environment.
Select one:
True
False

The correct answer is 'True'.
Question 48

Question text
____ are input data created to demonstrate that both components and the total system satisfy all design requirements.
Select one:
a. Test plan
b. Test strategy
c. Test cases
d. Subsystem testing


The correct answer is: Test cases
Question 49

Question text
True or False: The means to store unlimited, continuously growing databases currently are called data marts.
Select one:
True
False

The correct answer is 'False'.
Question 50

Question text
True or False: Sometimes referred to as a ‘business case’, the project proposal states the lowest level goals in a project.
Select one:
True
False

The correct answer is 'False'.

 

True or False: Scope encompasses your vision, but NOT your goal.
Select one:
True
False

The correct answer is 'False'.
Question 2

Question text
In the following development project schedule what is the deliverable for the acceptance testing phase:

Select one:
a. Project proposal
b. Requirements Spec
c. Alpha
d. Release system


The correct answer is: Release system
Question 3

Question text
The Goal of 3NF Is to:
Select one:
a. Remove Repeating Groups
b. Remove Partial Key Dependencies
c. Remove Non-Repeating Groups
d. Remove Nonkey Dependencies Program code


The correct answer is: Remove Nonkey Dependencies Program code
Question 4

Question text
Table 12-1 Object-Oriented Design Documentation; how many (tables and diagrams):
Select one:
a. 3,3
b. 4,3
c. 4,4
d. 3,4


The correct answer is: 3,4
Question 5

Question text
The Data Dictionary Process Contents does not include:
Select one:
a. Process Data
b. Process ID Number
c. Constraints (e.g., concurrence, sequential with another process, time-out, etc.)
d. Process Name


The correct answer is: Process Data
Question 6

Question text
True or False: Information systems methodology framework is NOT used to compare methodologies.
Select one:
True
False

The correct answer is 'False'.
Question 7

Question text
Software engineers are involved in these activities in which correct order:
Select one:
a. Development, operation, maintenance or retirement
b. Operation, development, retirement and maintenance
c. Development, operation, maintenance and retirement
d. Operation, development, maintenance and retirement


The correct answer is: Development, operation, maintenance and retirement
Question 8

Question text
A Structured Walk-Through does not include which work product?
Select one:
a. Program code
b. Programmer
c. Test plan
d. Test design


The correct answer is: Programmer
Question 9

Question text
True or False: Figure 7-9 Example of Complex Context Diagram describes a inflows context called patients claims processing.
Select one:
True
False

The correct answer is 'True'.
Question 10

Question text
Temporal Metrics include all but the following except:
Select one:
a. Environmental Metrics
b. Collateral Damage Potential (CDP)
c. Remediation Level (RL)
d. Report Confidence (RC)

The correct answer is: Environmental Metrics
Question 11

Question text
True or False: Software engineering is the systematic application of tools and techniques in the development of computer-based applications.
Select one:
True
False

The correct answer is 'True'.
Question 12

Question text
See Figure 12-17; Which subdomain is responsible for service objects such as Define logical data access control and application presentation.
Select one:
a. Data.
b. Human.
c. Software.
d. Hardware/Operating System.


The correct answer is: Data.
Question 13

Question text
True or False: Vulnerability is a bug, flaw, weakness, or exposure of an application, system, device, or service that could lead to a failure of confidentiality, integrity, or availability.
Select one:
True
False

The correct answer is 'True'.
Question 14

Question text
Which of the following is NOT a group of CVSS?
Select one:
a. Base
b. Temporal
c. Environmental
d. Human

The correct answer is: Human
Question 15

Question text
All listed below are examples of stakeholders with the exception of:
Select one:
a. End user
b. Programmer
c. Executive
d. Expert


The correct answer is: Programmer
Question 16

Question text
"FIGURE 9-7 ABC Video Partial Functional Decomposition of Purchasing" is a:
Select one:
a. Program code
b. Process flow
c. Function
d. Data flow


The correct answer is: Process flow
Question 17

Question text
See Figure 2: CVSS Metrics and Equations. Which values are considered optional when reflecting the risk posed by the vulnerability to a user's environment?
Select one:
a. Base metrics plus vector
b. Temporal metrics
c. Environmental metrics
d. B and C

The correct answer is: B and C
Question 18

Question text
True or False: Computer-aided software engineering (CASE) tools automate the hardware engineering process.
Select one:
True
False

The correct answer is 'False'.
Question 19

Question text
True or False: There are three basic types of business programs: report, edit/validate, and file update.
Select one:
True
False

The correct answer is 'True'.
Question 20

Question text
The results of structured design are all BUT the following:
Select one:
a. programming specifications
b. plans for testing
c. conversation
d. training and installation


The correct answer is: conversation
Question 21

Question text
True or False: Program specifications document the program's purpose, process requirements, the logical and physical data definitions, input and output formats, screen layouts, constraints, and special processing considerations that might complicate the program.
Select one:
True
False

The correct answer is 'True'.
Question 22

Question text
True or False: The product or project can be accepted even if acceptance testing is not complete.
Select one:
True
False

The correct answer is 'False'.
Question 23

Question text
The specific activities in structured systems analysis:
Select one:
a. Develop a context diagram
b. Optionally, develop a state-transition diagram if building an on-line or real-time application
c. Develop a structured data dictionary
d. Develop a set of balanced data flow diagrams


The correct answer is: Develop a structured data dictionary
Question 24

Question text
Environmental Metrics include all the following except:
Select one:
a. Collateral Damage Potential (CDP)
b. Target Distribution (TD)
c. Security Requirements (CR, IR, AR)
d. Temporal vector's

The correct answer is: Temporal vector's
Question 25

Question text
The R in CRUD matrix stands for:
Select one:
a. Repeat
b. Return
c. Report
d. Retrieve


The correct answer is: Retrieve
Question 26

Question text
Useful tools for software engineers DO NOT include:
Select one:
a. process dependencies
b. synchronization matrix
c. process hierarchies
d. object diagrams.


The correct answer is: synchronization matrix
Question 27

Question text
True or False: The purpose of the regression test is to ensure that the changes cause the application to regress to a functional state, that is, that the changes do introduce errors into the processing.
Select one:
True
False

The correct answer is 'False'.
Question 28

Question text
The _______ supports and sells the goals of the project throughout the organization:
Select one:
a. Project Manager
b. Sponsor
c. Champion
d. User


The correct answer is: Champion
Question 29

Question text
True or False: The Humphrey's maturity frameworks were developed for the Department of Defense as a self-assessment framework that identifies levels of computing and application development process maturity.
Select one:
True
False

The correct answer is 'True'.
Question 30

Question text
The purpose of the Sample Change Request Impact Form:
Select one:
a. Document the priority for the action, and the cost and schedule of the change
b. The PM and SE define the schedule and cost.
c. The PM and SE redefine the schedule and the cost.
d. impacts of the change document the priority for the action, and the cost and schedule of the change.


The correct answer is: impacts of the change document the priority for the action, and the cost and schedule of the change.
Question 31

Question text
A __________work product is a product that is considered complete and that is the basis for other, current work by the project development team.
Select one:
a. Baseline
b. Change request
c. checklist
d. Change Control File


The correct answer is: Baseline
Question 32

Question text
Legacy Systems are in what phase?
Select one:
a. design
b. installation
c. operations
d. maintenance

The correct answer is: maintenance
Question 33

Question text
See Table 13-2; which methodology does not require Data Relationships knowledge?
Select one:
a. Process
b. Data
c. Object
d. None of the above

The correct answer is: Process
Question 34

Question text
Project teams characterize risk by impact and likelihood. Which quadrant is high impact and high likelihood?

Select one:
a. Major
b. Critical
c. Minor
d. Major


The correct answer is: Critical
Question 35

Question text
The purpose of the system test is:
Select one:
a. demonstrate an application's ability to operate satisfactorily in the actual production environment using its intended hardware and software configuration.
b. is a system test and NOT a documentation test.
c. test to demonstrate an application's ability to operate satisfactorily in a simulated production environment using its intended hardware and software configuration.
d. ensure that the changes do not cause the application to regress to a nonfunctional state, that is, that the changes do not introduce errors into the processing.


The correct answer is: test to demonstrate an application's ability to operate satisfactorily in a simulated production environment using its intended hardware and software configuration.
Question 36

Question text
A __________ is written by the PM and the SE and used to advertise a project to vendors to bid on.
Select one:
a. Bidding document
b. Project request
c. Request for bid
d. Request for proposal (RFP)


The correct answer is: Request for proposal (RFP)
Question 37

Question text
True or False: Traceability is proven at test or implementation time and validates that a requirement has been satisfied.
Select one:
True
False

The correct answer is 'True'.
Question 38

Question text
See Table 13-1; which methodology requires Business Entity Analysis?
Select one:
a. Process
b. Data
c. Object
d. None of the above

The correct answer is: Data
Question 39

Question text
True or False: Cohesion is a measure of the external strength of a module with the notion that maximal, or functional, cohesion is the goal.
Select one:
True
False

The correct answer is 'False'.
Question 40

Question text
Project Managers must exhibit all these qualities except:
Select one:
a. Understanding
b. Trust
c. Budgeting
d. Empathy


The correct answer is: Budgeting
Question 41

Question text
In "FIGURE 10-52 Example of Process Hierarchy Diagram," which of the following is NOT one of the four sub processes of sales?

Select one:
a. Data fulfillment
b. Prospect maintenance
c. Data security
d. Inventory fulfillment


The correct answer is: Data fulfillment
Question 42

Question text
True or False: Identification does not refer to both Analysis and Design.
Select one:
True
False

The correct answer is 'False'.
Question 43

Question text
Which of the following is NOT a major phase of information engineering?
Select one:
a. Enterprise Analysis
b. Business Area Analysis
c. Business System Analysis
d. Construction


The correct answer is: Business System Analysis
Question 44

Question text
Which of the following is NOT an element of a project plan:
Select one:
a. What location is involved
b. When it needs to be done by
c. Who is to do it
d. How it is to be achieved


The correct answer is: What location is involved
Question 45

Question text
True or False: The two major activities of data modeling are the creation and refinement of an enemy-relationship diagram (ERD) and entity structure analysis.
Select one:
True
False

The correct answer is 'False'.
Question 46

Question text
Horizontal (or Subset) Data Partitioning:
Select one:
a. Complete 'records' or tuples of data are stored with different data in more than one location.
b. Data are copied in more than one location.
c. Partial 'records' or tuples of data are stored in more than one location.
d. Different data are completely stored in more than one location.
Some data may be accessed by remote sites.


The correct answer is: Partial 'records' or tuples of data are stored in more than one location.
Question 47

Question text
Based on this diagram return on investment (ROI) will be reached:

Select one:
a. 1 year
b. 2 years
c. 3 years
d. None of the above


The correct answer is: None of the above
Question 48

Question text
True or False: The code validation file has the validation role for Process 1.2.
Select one:
True
False

The correct answer is 'False'.
Question 49

Question text
True or False: The code validation file has the validation role for Process 1.
Select one:
True
False

The correct answer is 'False'.
Question 50

Question text
The list below are useful terms in expressing requirements specifications and can be abbreviated to stand for:

Select one:
a. START
b. STOP
c. SMART
d. None of the above


The correct answer is: SMART
True or False:Risk is the relative impact that an exploited vulnerability would have to a user's environment.
Select one:
True
False

The correct answer is 'True'.
Question 2

Question text
True or False: The Temporal group reflects the intrinsic qualities of a vulnerability.
Select one:
True
False

The correct answer is 'False'.
Question 3

Question text
All listed below are examples of stakeholders with the exception of:
Select one:
a. End user
b. Programmer
c. Executive
d. Expert


The correct answer is: Programmer
Question 4

Question text
True or False: Data-oriented design uses data as the basis for clustering processes, building databases, and identifying.
Select one:
True
False

The correct answer is 'True'.
Question 5

Question text
Boilerplate code means that the code:
Select one:
a. does vary from one program to another
b. is critical to maintaining applications at the functional level rather than at the code level.
c. does not vary from one program to another
d. meaning not changeable after it is accepted as complete, motivates users to be as complete in their thinking as possible


The correct answer is: does not vary from one program to another
Question 6

Question text
A Structured Walk-Through does not include this work product:
Select one:
a. Program code
b. Programmer
c. Test plan
d. Test design


The correct answer is: Programmer
Question 7

Question text
True or False: Computer-aided software engineering (CASE) tools automate the hardware engineering process.
Select one:
True
False

The correct answer is 'False'.
Question 8

Question text
The Data Dictionary Process Contents does not include:
Select one:
a. Process Data
b. Process ID Number
c. Constraints (e.g., concurrence, sequential with another process, time-out, etc.)
d. Process Name


The correct answer is: Process Data
Question 9

Question text
See Figure 12-17; Which subdomain is responsible for service objects such as Define logical data access control and application presentation.
Select one:
a. Data.
b. Human.
c. Software.
d. Hardware/Operating System.


The correct answer is: Data.
Question 10

Question text
True or False: The systems engineer provides organizational expertise while the project manager provides technical expertise.
Select one:
True
False

The correct answer is 'False'.
Question 11

Question text
Project teams characterize risk by impact and likelihood. Which quadrant is high impact and high likelihood?

Select one:
a. Major
b. Critical
c. Minor
d. Major


The correct answer is: Critical
Question 12

Question text
True or False: In this diagram the activity production phase 1 can begin before specify requirements has completed.

Select one:
True
False

The correct answer is 'False'.
Question 13

Question text
How many types in "FIGURE 9-27 Types of Process Dependency Connections?"
Select one:
a. One
b. Two
c. Three
d. Five


The correct answer is: Five
Question 14

Question text
True or False: The scope triangle is NOT also called the quality triangle.
Select one:
True
False

The correct answer is 'False'.
Question 15

Question text
True or False: The product or project can be accepted even if acceptance testing is not complete.
Select one:
True
False

The correct answer is 'False'.
Question 16

Question text
Which of the following is NOT a major phase of information engineering?
Select one:
a. Enterprise Analysis
b. Business Area Analysis
c. Business System Analysis
d. Construction


The correct answer is: Business System Analysis
Question 17

Question text
The R in CRUD matrix stands for:
Select one:
a. Repeat
b. Return
c. Report
d. Retrieve


The correct answer is: Retrieve
Question 18

Question text
True or False: Information systems methodology framework is NOT used to compare methodologies.
Select one:
True
False

The correct answer is 'False'.
Question 19

Question text
True or False: White-box testing evaluates specific execute item logic to guarantee its proper functioning.
Select one:
True
False

The correct answer is 'True'.
Question 20

Question text
The Base Metrics include all the following except:
Select one:
a. Access Vector
b. Authentication
c. Confidentiality, Integrity, Availability
d. Confidentiality, Integrity, Availability Impacts

The correct answer is: Confidentiality, Integrity, Availability
Question 21

Question text
True or False: The means to store unlimited, continuously growing databases currently are called data marts.
Select one:
True
False

The correct answer is 'False'.
Question 22

Question text
The major activities of structured design are all except:
Select one:
a. Develop program specifications
b. Transform or transaction analysis of DFD
c. Define the logical database
d. Refine and complete structure chart


The correct answer is: Define the logical database
Question 23

Question text
Two methods of analyzing methodology classes are:
Select one:
a. Information systems methodology framework
b. Humphrey's maturity framework
c. Information systems methodology framework and Humphrey's maturity framework
d. None of these

The correct answer is: Information systems methodology framework and Humphrey's maturity framework
Question 24

Question text
Based on this diagram return on investment (ROI) will be reached:

Select one:
a. 1 year
b. 2 years
c. 3 years
d. None of the above


The correct answer is: None of the above
Question 25

Question text
FIGURE 7-3 Sample Data Flow Diagram depicts data flowing from Process 2.0 to:
Select one:
a. File B
b. Process 3.0
c. Entity Name 1
d. Process 2.0


The correct answer is: Entity Name 1
Question 26

Question text
A __________work product is a product that is considered complete and that is the basis for other, current work by the project development team.
Select one:
a. Baseline
b. Change request
c. checklist
d. Change Control File


The correct answer is: Baseline
Question 27

Question text
Horizontal (or Subset) Data Partitioning:
Select one:
a. Complete 'records' or tuples of data are stored with different data in more than one location.
b. Data are copied in more than one location.
c. Partial 'records' or tuples of data are stored in more than one location.
d. Different data are completely stored in more than one location.
Some data may be accessed by remote sites.


The correct answer is: Partial 'records' or tuples of data are stored in more than one location.
Question 28

Question text
Software engineers are involved in these activities in which correct order:
Select one:
a. Development, operation, maintenance or retirement
b. Operation, development, retirement and maintenance
c. Development, operation, maintenance and retirement
d. Operation, development, maintenance and retirement


The correct answer is: Development, operation, maintenance and retirement
Question 29

Question text
True or False: Computer-aided software engineering (CASE) tools automate the hardware engineering process.
Select one:
True
False

The correct answer is 'False'.
Question 30

Question text
An important part of the maintainability is to make all which of the following available:
Select one:
a. Project documentation
b. Design documentation
c. Supporting material
d. All of the above


The correct answer is: All of the above
Question 31

Question text
____ are input data created to demonstrate that both components and the total system satisfy all design requirements.
Select one:
a. Test plan
b. Test strategy
c. Test cases
d. Subsystem testing


The correct answer is: Test cases
Question 32

Question text
The purpose of the Sample Change Request Impact Form:
Select one:
a. Document the priority for the action, and the cost and schedule of the change
b. The PM and SE define the schedule and cost.
c. The PM and SE redefine the schedule and the cost.
d. impacts of the change document the priority for the action, and the cost and schedule of the change.


The correct answer is: impacts of the change document the priority for the action, and the cost and schedule of the change.
Question 33

Question text
The specific activities in structured systems analysis:
Select one:
a. Develop a context diagram
b. Optionally, develop a state-transition diagram if building an on-line or real-time application
c. Develop a structured data dictionary
d. Develop a set of balanced data flow diagrams


The correct answer is: Develop a structured data dictionary
Question 34

Question text
True or False: CASE tools can ONLY be used in single user versions and NOT multiuser.
Select one:
True
False

The correct answer is 'False'.
Question 35

Question text
Figure 7-3 Sample Data Flow Diagram depicts data flowing from Process 2.0 to:
Select one:
a. File B
b. Process 3.0
c. Entity Name 1
d. Process 2.0


The correct answer is: Entity Name 1
Question 36

Question text
True or False: Scope encompasses your vision, but NOT your goal.
Select one:
True
False

The correct answer is 'False'.
Question 37

Question text
Table III-3 discusses all but:
Select one:
a. Document
b. Review
c. Coding
d. Identification


The correct answer is: Coding
Question 38

Question text
The critical path of a project is defined as:
Select one:
a. Shortest sequence of dependent tasks to project completion.
b. The sequence of dependent tasks that together take the most time. If any of the tasks are delayed, the project is also delayed
c. The sequence of dependent tasks that together take the least time. If any of the tasks are delayed, the project can complete on time.
d. Longest sequence of dependent tasks to project completion.


The correct answer is: The sequence of dependent tasks that together take the most time. If any of the tasks are delayed, the project is also delayed
Question 39

Question text
Which is NOT a phase of project lifecycle (PLC)?
Select one:
a. Analysis and Design
b. Project Initiation
c. System Retirement
d. Preparation for Software Engineering


The correct answer is: System Retirement
Question 40

Question text
The process diagram defines the hardware environment and shows process assignments to software.
Select one:
True
False

The correct answer is 'False'.
Question 41

Question text
True or False: Threat is the likelihood or frequency of a harmful event occurring.
Select one:
True
False

The correct answer is 'True'.
Question 42

Question text
The Goal of 3NF Is to:
Select one:
a. Remove Repeating Groups
b. Remove Partial Key Dependencies
c. Remove Non-Repeating Groups
d. Remove Nonkey Dependencies Program code


The correct answer is: Remove Nonkey Dependencies Program code
Question 43

Question text
True or False: In a required relationship, the entity must be present for the other entity to exist. In an optional relationship, the entity must be present for the other entity to exist.
Select one:
True
False

The correct answer is 'True'.
Question 44

Question text
See Table 13-2; which methodology does not require Data Relationships knowledge?
Select one:
a. Process
b. Data
c. Object
d. None of the above

The correct answer is: Process
Question 45

Question text
The results of structured design are all BUT the following:
Select one:
a. programming specifications
b. plans for testing
c. conversation
d. training and installation


The correct answer is: conversation
Question 46

Question text
Which goal is stated in a clear and concise manner and more likely to inspire team members to achieve it?
Select one:
a. “To deliver the cheapest system, in the shortest time, that just about gets the job done”
b. “To deliver the best sales and marketing system on the market”
c. “To deliver the cheapest system, in the shortest time, that almost gets the job done”
d. “To deliver a sales and marketing system on time”


The correct answer is: “To deliver the best sales and marketing system on the market”
Question 47

Question text
Project Managers must exhibit all these qualities except:
Select one:
a. Understanding
b. Trust
c. Budgeting
d. Empathy


The correct answer is: Budgeting
Question 48

Question text
Temporal Metrics include all but the following except:
Select one:
a. Environmental Metrics
b. Collateral Damage Potential (CDP)
c. Remediation Level (RL)
d. Report Confidence (RC)

The correct answer is: Environmental Metrics
Question 49

Question text
True or False: Software engineering is the systematic application of tools and techniques in the development of computer-based applications.
Select one:
True
False

The correct answer is 'True'.
Question 50

Question text
"TABLE 8-9 CASE Tools for Structured Design Program" code include all but:

Select one:
a. The Developer
b. Maestro
c. Oracle
d. Analyst/Designer Toolkit


The correct answer is: Oracle
Which is NOT a phase of project lifecycle (PLC)?
Select one:
a. Analysis and Design
b. Project Initiation
c. System Retirement
d. Preparation for Software Engineering


The correct answer is: System Retirement
Question 2

Question text
True or False: Software engineering is the systematic application of tools and techniques in the development of computer-based applications.
Select one:
True
False

The correct answer is 'True'.
Question 3

Question text
Useful tools for software engineers DO NOT include:
Select one:
a. process dependencies
b. synchronization matrix
c. process hierarchies
d. object diagrams.


The correct answer is: synchronization matrix
Question 4

Question text
Software engineers are involved in these activities in which correct order:
Select one:
a. Development, operation, maintenance or retirement
b. Operation, development, retirement and maintenance
c. Development, operation, maintenance and retirement
d. Operation, development, maintenance and retirement


The correct answer is: Development, operation, maintenance and retirement
Question 5

Question text
True or False: Data requirements for applications include: input, output, storage, and retrieval.
Select one:
True
False

The correct answer is 'True'.
Question 6

Question text
True or False: The systems engineer provides organizational expertise while the project manager provides technical expertise.
Select one:
True
False

The correct answer is 'False'.
Question 7

Question text
The _______ supports and sells the goals of the project throughout the organization:
Select one:
a. Project Manager
b. Sponsor
c. Champion
d. User


The correct answer is: Champion
Question 8

Question text
A __________ is written by the PM and the SE and used to advertise a project to vendors to bid on.
Select one:
a. Bidding document
b. Project request
c. Request for bid
d. Request for proposal (RFP)


The correct answer is: Request for proposal (RFP)
Question 9

Question text
The video store case study in chapter 2 includes requirements for customer, video and ___________.
Select one:
a. Rental Processing
b. Software
c. Hardware
d. Networks


The correct answer is: Rental Processing
Question 10

Question text
The critical path of a project is defined as:
Select one:
a. Shortest sequence of dependent tasks to project completion.
b. The sequence of dependent tasks that together take the most time. If any of the tasks are delayed, the project is also delayed
c. The sequence of dependent tasks that together take the least time. If any of the tasks are delayed, the project can complete on time.
d. Longest sequence of dependent tasks to project completion.


The correct answer is: The sequence of dependent tasks that together take the most time. If any of the tasks are delayed, the project is also delayed
Table III-3 discusses all but:
Select one:
a. Document
b. Review
c. Coding
d. Identification


The correct answer is: Coding
Question 2

Question text
True or False: Identification does not refer to both Analysis and Design.
Select one:
True
False

The correct answer is 'False'.
Question 3

Question text
A Structured Walk-Through does not include this work product:
Select one:
a. Program code
b. Programmer
c. Test plan
d. Test design


The correct answer is: Programmer
Question 4

Question text
True or False: Computer-aided software engineering (CASE) tools automate the hardware engineering process.
Select one:
True
False

The correct answer is 'False'.
Question 5

Question text
Figure 7-3 Sample Data Flow Diagram depicts data flowing from Process 2.0 to:
Select one:
a. File B
b. Process 3.0
c. Entity Name 1
d. Process 2.0


The correct answer is: Entity Name 1
Question 6

Question text
True or False: The code validation file has the validation role for Process 1.2.
Select one:
True
False

The correct answer is 'False'.
Question 7

Question text
The specific activities in structured systems analysis:
Select one:
a. Develop a context diagram
b. Optionally, develop a state-transition diagram if building an on-line or real-time application
c. Develop a structured data dictionary
d. Develop a set of balanced data flow diagrams


The correct answer is: Develop a structured data dictionary
Question 8

Question text
True or False: Figure 7-9 Example of Complex Context Diagram describes a inflows context called patients claims processing.
Select one:
True
False

The correct answer is 'True'.
Question 9

Question text
The Data Dictionary Process Contents does not include:
Select one:
a. Process Data
b. Process ID Number
c. Constraints (e.g., concurrence, sequential with another process, time-out, etc.)
d. Process Name


The correct answer is: Process Data
Which of the following is NOT a major phase of information engineering?
Select one:
a. Enterprise Analysis
b. Business Area Analysis
c. Business System Analysis
d. Construction


The correct answer is: Business System Analysis
Question 2

Question text
True or False: The two major activities of data modeling are the creation and refinement of an enemy-relationship diagram (ERD) and entity structure analysis.
Select one:
True
False

The correct answer is 'False'.
Question 3

Question text
"FIGURE 9-7 ABC Video Partial Functional Decomposition of Purchasing" is a:
Select one:
a. Program code
b. Process flow
c. Function
d. Data flow


The correct answer is: Process flow
Question 4

Question text
True or False: In a required relationship, the entity must be present for the other entity to exist. In an optional relationship, the entity must be present for the other entity to exist.
Select one:
True
False

The correct answer is 'True'.
Question 5

Question text
The Goal of 3NF Is to:
Select one:
a. Remove Repeating Groups
b. Remove Partial Key Dependencies
c. Remove Non-Repeating Groups
d. Remove Nonkey Dependencies Program code


The correct answer is: Remove Nonkey Dependencies Program code
Question 6

Question text
True or False: In "FIGURE 9-17 ABC Rental Processing-First-Cut Entity-Relationship Diagram," the three entities are: Customer, Video, Rental and Request.
Select one:
True
False

The correct answer is 'False'.
Question 7

Question text
In "FIGURE 9-24 Decomposition for Customer and Video Maintenance Remove Repeating Groups," which processes are decomposed?
Select one or more:
a. Rental/Return
b. Accounting
c. Purchasing
d. Personnel / payroll


The correct answer is: Rental/Return, Purchasing
Question 8

Question text
How many types in "FIGURE 9-27 Types of Process Dependency Connections?"
Select one:
a. One
b. Two
c. Three
d. Five


The correct answer is: Five
Question 9

Question text
True or False: Both ADW and IEF are CASE tools.
Select one:
True
False

The correct answer is 'True'.
Question 10

Question text
The R in CRUD matrix stands for:
Select one:
a. Repeat
b. Return
c. Report
d. Retrieve


The correct answer is: Retrieve
Potential distribution of the application. The specific activities in structured systems analysis:
Select one:
a. Develop a context diagram
b. Optionally, develop a state-transition diagram if building an on-line or real-time application
c. Develop a structured data dictionary
d. Develop a set of balanced data flow diagrams


The correct answer is: Develop a structured data dictionary
Question 2

Question text
Horizontal (or Subset) Data Partitioning:
Select one:
a. Complete 'records' or tuples of data are stored with different data in more than one location.
b. Data are copied in more than one location.
c. Partial 'records' or tuples of data are stored in more than one location.
d. Different data are completely stored in more than one location.
Some data may be accessed by remote sites.


The correct answer is: Partial 'records' or tuples of data are stored in more than one location.
Question 3

Question text
The Goal of 3NF Is to:
Select one:
a. Remove Repeating Groups
b. Remove Partial Key Dependencies
c. Remove Non-Repeating Groups
d. Remove Nonkey Dependencies Program code


The correct answer is: Remove Nonkey Dependencies Program code
Question 4

Question text
The video store case study in chapter 2 includes requirements for customer, video and ___________.
Select one:
a. Rental Processing
b. Software
c. Hardware
d. Networks


The correct answer is: Rental Processing
Question 5

Question text
Useful tools for software engineers DO NOT include:
Select one:
a. process dependencies
b. synchronization matrix
c. process hierarchies
d. object diagrams.


The correct answer is: synchronization matrix
Question 6

Question text
A Structured Walk-Through does not include this work product:
Select one:
a. Program code
b. Programmer
c. Test plan
d. Test design


The correct answer is: Programmer
Question 7

Question text
True or False: Cohesion is a measure of the external strength of a module with the notion that maximal, or functional, cohesion is the goal.
Select one:
True
False

The correct answer is 'False'.
Question 8

Question text
True or False: Identification does not refer to both Analysis and Design.
Select one:
True
False

The correct answer is 'False'.
Question 9

Question text
True or False: Data requirements for applications include: input, output, storage, and retrieval.
Select one:
True
False

The correct answer is 'True'.
Question 10

Question text
True or False: Both ADW and IEF are CASE tools.
Select one:
True
False

The correct answer is 'True'.
Question 11

Question text
True or False: Software engineering is the systematic application of tools and techniques in the development of computer-based applications.
Select one:
True
False

The correct answer is 'True'.
Question 12

Question text
True or False: The systems engineer provides organizational expertise while the project manager provides technical expertise.
Select one:
True
False

The correct answer is 'False'.
Question 13

Question text
True or False: In a required relationship, the entity must be present for the other entity to exist. In an optional relationship, the entity must be present for the other entity to exist.
Select one:
True
False

The correct answer is 'True'.
Question 14

Question text
True or False: The code validation file has the validation role for Process 1.2.
Select one:
True
False

The correct answer is 'False'.
Question 15

Question text
True or False: Computer-aided software engineering (CASE) tools automate the hardware engineering process.
Select one:
True
False

The correct answer is 'False'.
Question 16

Question text
Table III-3 discusses all but:
Select one:
a. Document
b. Review
c. Coding
d. Identification


The correct answer is: Coding
Question 17

Question text
In "FIGURE 9-24 Decomposition for Customer and Video Maintenance Remove Repeating Groups," which processes are decomposed?
Select one or more:
a. Rental/Return
b. Accounting
c. Purchasing
d. Personnel / payroll


The correct answer is: Rental/Return, Purchasing
Question 18

Question text
True or False: Data-oriented methods assume that, since data are unstable and processes are, data should be the main focus of activities.
Select one:
True
False

The correct answer is 'False'.
Question 19

Question text
True or False: Program specifications document the program's purpose, process requirements, the logical and physical data definitions, input and output formats, screen layouts, constraints, and special processing considerations that might complicate the program.
Select one:
True
False

The correct answer is 'True'.
Question 20

Question text
Which of the following is NOT a major phase of information engineering?
Select one:
a. Enterprise Analysis
b. Business Area Analysis
c. Business System Analysis
d. Construction


The correct answer is: Business System Analysis
An _______ is an entity from the real world whose processes and attributes (that is, the data) are modeled in a computerized application.
Select one:
a. abstract data type (ADT)
b. Class/objects
c. Object
d. class


The correct answer is: Object
Question 2

Question text
True or False: Encapsulated Objects can have both Public or Private Parts.
Select one:
True
False

The correct answer is 'False'.
Question 3

Question text
The Project Manager’s job is to:
Select one:
a. Must understand the customer requirements for the team and keep the SE’s on track.
b. Leads the design, coding and testing effort. Decides which process to use (data, or object oriented design) and directs and reviews the SE2 products.
c. Leads the team and is responsible for the final product quality and timeliness.
d. Documents the figures, diagrams for process, data, or object oriented design.
e. Constructs schedule and milestones and keeps the PM informed and on schedule.


The correct answer is: Leads the team and is responsible for the final product quality and timeliness.
Question 4

Question text
True or False: Computer-aided software engineering (CASE) tools automate the hardware engineering process.
Select one:
True
False

The correct answer is 'False'.
Question 5

Question text
A Structured Walk-Through does not include which work product?
Select one:
a. Program code
b. Programmer
c. Test plan
d. Test design


The correct answer is: Programmer
Question 6

Question text
True/False: Object oriented design has seven steps.
Select one:
True
False

The response was correct.
The correct answer is 'True'.
Question 7

Question text
Table 12-1 Object-Oriented Design Documentation; how many (tables and diagrams):
Select one:
a. 3,3
b. 4,3
c. 4,4
d. 3,4


The correct answer is: 3,4
Question 8

Question text
The process diagram defines the hardware environment and shows process assignments to software.
Select one:
True
False


The correct answer is 'False'.
Question 9

Question text
See Figure 12-17; Which subdomain is responsible for service objects such as Define logical data access control and application presentation.
Select one:
a. Data.
b. Human.
c. Software.
d. Hardware/Operating System.


The correct answer is: Data.
Question 10

Question text
True/False: Booch diagram are used to summarize the objects-both application and service - and their interactions.
Select one:
True
False

Your answer was correct.
The correct answer is 'True'.
A ____ test is performed for each of the smallest units of code?
Select one:
a. Regression
b. System
c. Integration
d. Unit


The correct answer is: Unit
Question 2

Question text
True or False: White-box testing evaluates specific execute item logic to guarantee its proper functioning.
Select one:
True
False

The correct answer is 'True'.
Question 3

Question text
____ are input data created to demonstrate that both components and the total system satisfy all design requirements.
Select one:
a. Test plan
b. Test strategy
c. Test cases
d. Subsystem testing


The correct answer is: Test cases
Question 4

Question text
The purpose of the system test is:
Select one:
a. demonstrate an application's ability to operate satisfactorily in the actual production environment using its intended hardware and software configuration.
b. is a system test and NOT a documentation test.
c. test to demonstrate an application's ability to operate satisfactorily in a simulated production environment using its intended hardware and software configuration.
d. ensure that the changes do not cause the application to regress to a nonfunctional state, that is, that the changes do not introduce errors into the processing.


The correct answer is: test to demonstrate an application's ability to operate satisfactorily in a simulated production environment using its intended hardware and software configuration.
Question 5

Question text
True or False: The purpose of the regression test is to ensure that the changes cause the application to regress to a functional state, that is, that the changes do introduce errors into the processing.
Select one:
True
False

The correct answer is 'False'.
Question 6

Question text
True or False: There are three basic types of business programs: report, edit/validate, and file update.
Select one:
True
False

The correct answer is 'True'.
Question 7

Question text
Boilerplate code means that the code:
Select one:
a. does vary from one program to another
b. is critical to maintaining applications at the functional level rather than at the code level.
c. does not vary from one program to another
d. meaning not changeable after it is accepted as complete, motivates users to be as complete in their thinking as possible


The correct answer is: does not vary from one program to another
Question 8

Question text
A __________work product is a product that is considered complete and that is the basis for other, current work by the project development team.
Select one:
a. Baseline
b. Change request
c. checklist
d. Change Control File


The correct answer is: Baseline
Question 9

Question text
The purpose of the Sample Change Request Impact Form:
Select one:
a. Document the priority for the action, and the cost and schedule of the change
b. The PM and SE define the schedule and cost.
c. The PM and SE redefine the schedule and the cost.
d. impacts of the change document the priority for the action, and the cost and schedule of the change.


The correct answer is: impacts of the change document the priority for the action, and the cost and schedule of the change.
Question 10

Question text
Restructuring is:
Select one:
a. the redevelopment of a portion of an application with a bridge to the old application.
b. is the reverse analysis of an old application to conform to a new methodology, usually Information Engineering or object orientation.
c. is also known as reverse engineering. Rebuilding is the retirement and redevelopment of an application.
d. the redevelopment of an application with a bridge to the old application.


The correct answer is: the redevelopment of a portion of an application with a bridge to the old application.
Jenkins (2005) stated that the critical path is defined as:
Select one:
a. It is this path that you can traverse in order to reach completion of your project on time
b. It is this path that you must traverse in order to reach completion of your project on time
c. The critical path represents the ideal set of tasks to be complete for your project
d. The critical path represents a set of tasks to be complete for your project


The correct answer is: It is this path that you must traverse in order to reach completion of your project on time
Question 2

Question text
True or False: The scope triangle is NOT also called the quality triangle.
Select one:
True
False

The correct answer is 'False'.
Question 3

Question text
Jenkins (2005) listed the mythical man month diagram how many interfaces exist for a 5 person project.
Select one:
a. 1
b. 3
c. 6
d. 10


The correct answer is: 6
Question 4

Question text
True or False: Scope encompasses your vision, but NOT your goal.
Select one:
True
False

The correct answer is 'False'.
Question 5

Question text
Which goal is stated in a clear and concise manner and more likely to inspire team members to achieve it?
Select one:
a. “To deliver the cheapest system, in the shortest time, that just about gets the job done”
b. “To deliver the best sales and marketing system on the market”
c. “To deliver the cheapest system, in the shortest time, that almost gets the job done”
d. “To deliver a sales and marketing system on time”


The correct answer is: “To deliver the best sales and marketing system on the market”
Question 6

Question text
True or False: Sometimes referred to as a ‘business case’, the project proposal states the lowest level goals in a project.
Select one:
True
False

The correct answer is 'False'.
Question 7

Question text
Based on this diagram return on investment (ROI) will be reached:

Select one:
a. 1 year
b. 2 years
c. 3 years
d. None of the above


The correct answer is: None of the above
Question 8

Question text
All listed below are examples of stakeholders with the exception of:
Select one:
a. End user
b. Programmer
c. Executive
d. Expert


The correct answer is: Programmer
Question 9

Question text
True or False: Traceability is proven at test or implementation time and validates that a requirement has been satisfied.
Select one:
True
False

The correct answer is 'True'.
Question 10

Question text
The list below are useful terms in expressing requirements specifications and can be abbreviated to stand for:

Select one:
a. START
b. STOP
c. SMART
d. None of the above


The correct answer is: SMART
True or False: The product or project can be accepted even if acceptance testing is not complete.
Select one:
True
False

The correct answer is 'False'.
Question 2

Question text
True or False: The purpose of a project plan is to maintain control of a project.
Select one:
True
False

The correct answer is 'True'.
Question 3

Question text
True or False: Traceability is proven at test or implementation time and validates that a requirement has been satisfied.
Select one:
True
False

The correct answer is 'True'.
Question 4

Question text
True/False: Object oriented design has seven steps.
Select one:
True
False

The response was correct.
The correct answer is 'True'.
Question 5

Question text
The purpose of the system test is:
Select one:
a. demonstrate an application's ability to operate satisfactorily in the actual production environment using its intended hardware and software configuration.
b. is a system test and NOT a documentation test.
c. test to demonstrate an application's ability to operate satisfactorily in a simulated production environment using its intended hardware and software configuration.
d. ensure that the changes do not cause the application to regress to a nonfunctional state, that is, that the changes do not introduce errors into the processing.


The correct answer is: test to demonstrate an application's ability to operate satisfactorily in a simulated production environment using its intended hardware and software configuration.
Question 6

Question text
____ are input data created to demonstrate that both components and the total system satisfy all design requirements.
Select one:
a. Test plan
b. Test strategy
c. Test cases
d. Subsystem testing


The correct answer is: Test cases
Question 7

Question text
A Structured Walk-Through does not include which work product?
Select one:
a. Program code
b. Programmer
c. Test plan
d. Test design


The correct answer is: Programmer
Question 8

Question text
True or False: Scope encompasses your vision, but NOT your goal.
Select one:
True
False

The correct answer is 'False'.
Question 9

Question text
Which of the following is NOT an element of a project plan:
Select one:
a. What location is involved
b. When it needs to be done by
c. Who is to do it
d. How it is to be achieved


The correct answer is: What location is involved
Question 10

Question text
Jenkins (2005) stated that the critical path is defined as:
Select one:
a. It is this path that you can traverse in order to reach completion of your project on time
b. It is this path that you must traverse in order to reach completion of your project on time
c. The critical path represents the ideal set of tasks to be complete for your project
d. The critical path represents a set of tasks to be complete for your project


The correct answer is: It is this path that you must traverse in order to reach completion of your project on time
Question 11

Question text
True or False: Sometimes referred to as a ‘business case’, the project proposal states the lowest level goals in a project.
Select one:
True
False

The correct answer is 'False'.
Question 12

Question text
An important part of the maintainability is to make all which of the following available:
Select one:
a. Project documentation
b. Design documentation
c. Supporting material
d. All of the above


The correct answer is: All of the above
Question 13

Question text
A ____ test is performed for each of the smallest units of code?
Select one:
a. Regression
b. System
c. Integration
d. Unit


The correct answer is: Unit
Question 14

Question text
The process diagram defines the hardware environment and shows process assignments to software.
Select one:
True
False


The correct answer is 'False'.
Question 15

Question text
Restructuring is:
Select one:
a. the redevelopment of a portion of an application with a bridge to the old application.
b. is the reverse analysis of an old application to conform to a new methodology, usually Information Engineering or object orientation.
c. is also known as reverse engineering. Rebuilding is the retirement and redevelopment of an application.
d. the redevelopment of an application with a bridge to the old application.


The correct answer is: the redevelopment of a portion of an application with a bridge to the old application.
Question 16

Question text
Based on this diagram return on investment (ROI) will be reached:

Select one:
a. 1 year
b. 2 years
c. 3 years
d. None of the above


The correct answer is: None of the above
Question 17

Question text
True or False: Encapsulated Objects can have both Public or Private Parts.
Select one:
True
False

The correct answer is 'False'.
Question 18

Question text
Boilerplate code means that the code:
Select one:
a. does vary from one program to another
b. is critical to maintaining applications at the functional level rather than at the code level.
c. does not vary from one program to another
d. meaning not changeable after it is accepted as complete, motivates users to be as complete in their thinking as possible


The correct answer is: does not vary from one program to another
Question 19

Question text
An _______ is an entity from the real world whose processes and attributes (that is, the data) are modeled in a computerized application.
Select one:
a. abstract data type (ADT)
b. Class/objects
c. Object
d. class


The correct answer is: Object
Question 20

Question text
In the following development project schedule what is the deliverable for the acceptance testing phase:

Select one:
a. Project proposal
b. Requirements Spec
c. Alpha
d. Release system


The correct answer is: Release system
See Table 13-1; which methodology requires human interface guidelines?
Select one:
a. Process
b. Data
c. Object
d. None of the above

The correct answer is: Object
Question 2

Question text
True or False: Information systems methodology framework is NOT used to compare methodologies.
Select one:
True
False

The correct answer is 'False'.
Question 3

Question text
See Table 13-1; which methodology requires Business Entity Analysis?
Select one:
a. Process
b. Data
c. Object
d. None of the above

The correct answer is: Data
Question 4

Question text
True or False: The Humphrey's maturity frameworks were developed for the Department of Defense as a self-assessment framework that identifies levels of computing and application development process maturity.
Select one:
True
False

The correct answer is 'True'.
Question 5

Question text
See Table 13-2; which methodology does not require Data Relationships knowledge?
Select one:
a. Process
b. Data
c. Object
d. None of the above

The correct answer is: Process
Question 6

Question text
According to Table 13-5; Which methodology is MOST predictable and consistent:

Select one:
a. Process
b. Data
c. Object
d. None of the above

The correct answer is: Data
Question 7

Question text
True or False: CASE tools can ONLY be used in single user versions and NOT multiuser.
Select one:
True
False

The correct answer is 'False'.
Question 8

Question text
Legacy Systems are in what phase?
Select one:
a. design
b. installation
c. operations
d. maintenance

The correct answer is: maintenance
Question 9

Question text
True or False: The means to store unlimited, continuously growing databases currently are called data marts.
Select one:
True
False

The correct answer is 'False'.
Question 10

Question text
Two methods of analyzing methodology classes are:
Select one:
a. Information systems methodology framework
b. Humphrey's maturity framework
c. Information systems methodology framework and Humphrey's maturity framework
d. None of these

The correct answer is: Information systems methodology framework and Humphrey's maturity framework
Which of the following is NOT a group of CVSS?
Select one:
a. Base
b. Temporal
c. Environmental
d. Human
Question 2

Question text
True or False: The Temporal group reflects the intrinsic qualities of a vulnerability.
Select one:
True
False
Question 3

Question text
The Common Vulnerability Scoring System (CVSS) is an open framework that addresses what issue?
Select one:
a. Identifying and assessing vulnerabilities across many disparate software platforms
b. Identifying and assessing vulnerabilities across many disparate hardware platforms
c. Identifying and assessing vulnerabilities across many disparate hardware and software platforms
d. None of the above
Question 4

Question text
See Figure 2: CVSS Metrics and Equations. Which values are considered optional when reflecting the risk posed by the vulnerability to a user's environment?
Select one:
a. Base metrics plus vector
b. Temporal metrics
c. Environmental metrics
d. B and C
Question 5

Question text
True or False: Vulnerability is a bug, flaw, weakness, or exposure of an application, system, device, or service that could lead to a failure of confidentiality, integrity, or availability.
Select one:
True
False
Question 6

Question text
True or False: Threat is the likelihood or frequency of a harmful event occurring.
Select one:
True
False
Question 7

Question text
True or False:Risk is the relative impact that an exploited vulnerability would have to a user's environment.
Select one:
True
False
Question 8

Question text
Temporal Metrics include all but the following except:
Select one:
a. Environmental Metrics
b. Collateral Damage Potential (CDP)
c. Remediation Level (RL)
d. Report Confidence (RC)
Question 9

Question text
Environmental Metrics include all the following except:
Select one:
a. Collateral Damage Potential (CDP)
b. Target Distribution (TD)
c. Security Requirements (CR, IR, AR)
d. Temporal vector's
Question 10

Question text
The Base Metrics include all the following except:
Select one:
a. Access Vector
b. Authentication
c. Confidentiality, Integrity, Availability
d. Confidentiality, Integrity, Availability Impacts
The Data Dictionary Process Contents does not include:
Select one:
a. Process Data
b. Process ID Number
c. Constraints (e.g., concurrence, sequential with another process, time-out, etc.)
d. Process Name


The correct answer is: Process Data
Question 2

Question text
True or False: In "FIGURE 9-17 ABC Rental Processing-First-Cut Entity-Relationship Diagram," the three entities are: Customer, Video, Rental and Request.
Select one:
True
False

The correct answer is 'False'.
Question 3

Question text
Which goal is stated in a clear and concise manner and more likely to inspire team members to achieve it?
Select one:
a. “To deliver the cheapest system, in the shortest time, that just about gets the job done”
b. “To deliver the best sales and marketing system on the market”
c. “To deliver the cheapest system, in the shortest time, that almost gets the job done”
d. “To deliver a sales and marketing system on time”


The correct answer is: “To deliver the best sales and marketing system on the market”
Question 4

Question text
The major activities of structured design are all except:
Select one:
a. Develop program specifications
b. Transform or transaction analysis of DFD
c. Define the logical database
d. Refine and complete structure chart


The correct answer is: Define the logical database
Question 5

Question text
True or False: Threat is the likelihood or frequency of a harmful event occurring.
Select one:
True
False

The correct answer is 'True'.
Question 6

Question text
True or False: In a required relationship, the entity must be present for the other entity to exist. In an optional relationship, the entity must be present for the other entity to exist.
Select one:
True
False

The correct answer is 'True'.
Question 7

Question text
The Base Metrics include all the following except:
Select one:
a. Access Vector
b. Authentication
c. Confidentiality, Integrity, Availability
d. Confidentiality, Integrity, Availability Impacts

The correct answer is: Confidentiality, Integrity, Availability
Question 8

Question text
There are five rules of scheduling; which of the following is NOT one of them:
Select one:
a. Eliminate uncertainty wherever you can
b. Pick the right level of granularity
c. Take a vacation
d. Analyst/Designer Toolkit


The correct answer is: Take a vacation
Question 9

Question text
The purpose of the Sample Change Request Impact Form:
Select one:
a. Document the priority for the action, and the cost and schedule of the change
b. The PM and SE define the schedule and cost.
c. The PM and SE redefine the schedule and the cost.
d. impacts of the change document the priority for the action, and the cost and schedule of the change.


The correct answer is: impacts of the change document the priority for the action, and the cost and schedule of the change.
Question 10

Question text
See Table 13-1; which methodology requires human interface guidelines?
Select one:
a. Process
b. Data
c. Object
d. None of the above

The correct answer is: Object
Question 11

Question text
True or False: Data requirements for applications include: input, output, storage, and retrieval.
Select one:
True
False

The correct answer is 'True'.
Question 12

Question text
True or False: In many projects the change management system is NOT linked to (or is part of) a defect tracking.
Select one:
True
False

The correct answer is 'False'.
Question 13

Question text
____ are input data created to demonstrate that both components and the total system satisfy all design requirements.
Select one:
a. Test plan
b. Test strategy
c. Test cases
d. Subsystem testing


The correct answer is: Test cases
Question 14

Question text
True/False: Object oriented design has seven steps.
Select one:
True
False

The response was correct.
The correct answer is 'True'.
Question 15

Question text
True or False: Sometimes referred to as a ‘business case’, the project proposal states the lowest level goals in a project.
Select one:
True
False

The correct answer is 'False'.
Question 16

Question text
"FIGURE 9-7 ABC Video Partial Functional Decomposition of Purchasing" is a:
Select one:
a. Program code
b. Process flow
c. Function
d. Data flow


The correct answer is: Process flow
Question 17

Question text
The results of structured design are all BUT the following:
Select one:
a. programming specifications
b. plans for testing
c. conversation
d. training and installation


The correct answer is: conversation
Question 18

Question text
True or False: The product or project can be accepted even if acceptance testing is not complete.
Select one:
True
False

The correct answer is 'False'.
Question 19

Question text
True or False: Program specifications document the program's purpose, process requirements, the logical and physical data definitions, input and output formats, screen layouts, constraints, and special processing considerations that might complicate the program.
Select one:
True
False

The correct answer is 'True'.
Question 20

Question text
Restructuring is:
Select one:
a. the redevelopment of a portion of an application with a bridge to the old application.
b. is the reverse analysis of an old application to conform to a new methodology, usually Information Engineering or object orientation.
c. is also known as reverse engineering. Rebuilding is the retirement and redevelopment of an application.
d. the redevelopment of an application with a bridge to the old application.


The correct answer is: the redevelopment of a portion of an application with a bridge to the old application.
Question 21

Question text
The critical path of a project is defined as:
Select one:
a. Shortest sequence of dependent tasks to project completion.
b. The sequence of dependent tasks that together take the most time. If any of the tasks are delayed, the project is also delayed
c. The sequence of dependent tasks that together take the least time. If any of the tasks are delayed, the project can complete on time.
d. Longest sequence of dependent tasks to project completion.


The correct answer is: The sequence of dependent tasks that together take the most time. If any of the tasks are delayed, the project is also delayed
Question 22

Question text
The Project Manager’s job is to:
Select one:
a. Must understand the customer requirements for the team and keep the SE’s on track.
b. Leads the design, coding and testing effort. Decides which process to use (data, or object oriented design) and directs and reviews the SE2 products.
c. Leads the team and is responsible for the final product quality and timeliness.
d. Documents the figures, diagrams for process, data, or object oriented design.
e. Constructs schedule and milestones and keeps the PM informed and on schedule.


The correct answer is: Leads the team and is responsible for the final product quality and timeliness.
Question 23

Question text
True or False: The Temporal group reflects the intrinsic qualities of a vulnerability.
Select one:
True
False

The correct answer is 'False'.
Question 24

Question text
The purpose of the system test is:
Select one:
a. demonstrate an application's ability to operate satisfactorily in the actual production environment using its intended hardware and software configuration.
b. is a system test and NOT a documentation test.
c. test to demonstrate an application's ability to operate satisfactorily in a simulated production environment using its intended hardware and software configuration.
d. ensure that the changes do not cause the application to regress to a nonfunctional state, that is, that the changes do not introduce errors into the processing.


The correct answer is: test to demonstrate an application's ability to operate satisfactorily in a simulated production environment using its intended hardware and software configuration.
Question 25

Question text
True or False: Information systems methodology framework is NOT used to compare methodologies.
Select one:
True
False

The correct answer is 'False'.
Question 26

Question text
The video store case study in chapter 2 includes requirements for customer, video and ___________.
Select one:
a. Rental Processing
b. Software
c. Hardware
d. Networks


The correct answer is: Rental Processing
Question 27

Question text
Which of the following is NOT a group of CVSS?
Select one:
a. Base
b. Temporal
c. Environmental
d. Human

The correct answer is: Human
Question 28

Question text
True or False: The systems engineer provides organizational expertise while the project manager provides technical expertise.
Select one:
True
False

The correct answer is 'False'.
Question 29

Question text
See Figure 2: CVSS Metrics and Equations. Which values are considered optional when reflecting the risk posed by the vulnerability to a user's environment?
Select one:
a. Base metrics plus vector
b. Temporal metrics
c. Environmental metrics
d. B and C

The correct answer is: B and C
Question 30

Question text
Potential distribution of the application. The specific activities in structured systems analysis:
Select one:
a. Develop a context diagram
b. Optionally, develop a state-transition diagram if building an on-line or real-time application
c. Develop a structured data dictionary
d. Develop a set of balanced data flow diagrams


The correct answer is: Develop a structured data dictionary
Question 31

Question text
Jenkins (2005) stated that the critical path is defined as:
Select one:
a. It is this path that you can traverse in order to reach completion of your project on time
b. It is this path that you must traverse in order to reach completion of your project on time
c. The critical path represents the ideal set of tasks to be complete for your project
d. The critical path represents a set of tasks to be complete for your project


The correct answer is: It is this path that you must traverse in order to reach completion of your project on time
Question 32

Question text
True or False: Identification does not refer to both Analysis and Design.
Select one:
True
False

The correct answer is 'False'.
Question 33

Question text
True or False: Traceability is proven at test or implementation time and validates that a requirement has been satisfied.
Select one:
True
False

The correct answer is 'True'.
Question 34

Question text
The R in CRUD matrix stands for:
Select one:
a. Repeat
b. Return
c. Report
d. Retrieve


The correct answer is: Retrieve
Question 35

Question text
An _______ is an entity from the real world whose processes and attributes (that is, the data) are modeled in a computerized application.
Select one:
a. abstract data type (ADT)
b. Class/objects
c. Object
d. class


The correct answer is: Object
Question 36

Question text
A Structured Walk-Through does not include this work product:
Select one:
a. Program code
b. Programmer
c. Test plan
d. Test design


The correct answer is: Programmer
Question 37

Question text
See Table 13-2; which methodology does not require Data Relationships knowledge?
Select one:
a. Process
b. Data
c. Object
d. None of the above

The correct answer is: Process
Question 38

Question text
How many types in "FIGURE 9-27 Types of Process Dependency Connections?"
Select one:
a. One
b. Two
c. Three
d. Five


The correct answer is: Five
Question 39

Question text
"TABLE 8-9 CASE Tools for Structured Design Program" code include all but:

Select one:
a. The Developer
b. Maestro
c. Oracle
d. Analyst/Designer Toolkit


The correct answer is: Oracle
Question 40

Question text
Project teams characterize risk by impact and likelihood. Which quadrant is high impact and high likelihood?

Select one:
a. Major
b. Critical
c. Minor
d. Major


The correct answer is: Critical
Question 41

Question text
True or False: There are three basic types of business programs: report, edit/validate, and file update.
Select one:
True
False

The correct answer is 'True'.
Question 42

Question text
True or False: The means to store unlimited, continuously growing databases currently are called data marts.
Select one:
True
False

The correct answer is 'False'.
Question 43

Question text
The list below are useful terms in expressing requirements specifications and can be abbreviated to stand for:

Select one:
a. START
b. STOP
c. SMART
d. None of the above


The correct answer is: SMART
Question 44

Question text
True or False: Figure 7-9 Example of Complex Context Diagram describes a inflows context called patients claims processing.
Select one:
True
False

The correct answer is 'True'.
Question 45

Question text
The Data Dictionary Process Contents does not include:
Select one:
a. Process Data
b. Process ID Number
c. Constraints (e.g., concurrence, sequential with another process, time-out, etc.)
d. Process Name


The correct answer is: Process Data
Question 46

Question text
Project Managers must exhibit all these qualities except:
Select one:
a. Understanding
b. Trust
c. Budgeting
d. Empathy


The correct answer is: Budgeting
Question 47

Question text
Useful tools for software engineers DO NOT include:
Select one:
a. process dependencies
b. synchronization matrix
c. process hierarchies
d. object diagrams.


The correct answer is: synchronization matrix
Question 48

Question text
The specific activities in structured systems analysis:
Select one:
a. Develop a context diagram
b. Optionally, develop a state-transition diagram if building an on-line or real-time application
c. Develop a structured data dictionary
d. Develop a set of balanced data flow diagrams


The correct answer is: Develop a structured data dictionary
Question 49

Question text
Figure 7-3 Sample Data Flow Diagram depicts data flowing from Process 2.0 to:
Select one:
a. File B
b. Process 3.0
c. Entity Name 1
d. Process 2.0


The correct answer is: Entity Name 1
Question 50

Question text
True or False: The Humphrey's maturity frameworks were developed for the Department of Defense as a self-assessment framework that identifies levels of computing and application development process maturity.
Select one:
True
False

The correct answer is 'True'.

 

CallTutors Guarantees

  • Work Within Deadline
  • Lowest Price Guranteed
  • Plagiarism Free Guranteed
  • 24 * 7 Availability
  • Native Experienced Experts
  • Free Revisions

Reviews

Total Reviews: 81

Research essay writing02/18/2018

Hi, i have given them my research essay writing work and these guys are just awesome. They have some of the best UK writers. Just love them for their quality service and delivery.

Tani J.
so much perfection02/17/2018

They handle each order with so much perfection. I got the assignment well before the time and it was written nicely. I never knew they could be of such a great help, and after seeing the quality of their work I’ve decided to hire them only for future projects.

Charlie Cassandra
Management Assignment02/16/2018

The subject assigned to me was not clear and as I couldn’t take risk my marks, I made a decision to hire Management Assignment Help service. I got my assignment in time and it was written perfectly. All the important things and points were properly covered and wonderfully written.

Russell Ash
Accounting Assignment Help02/12/2018

I was searching Accounting Assignment Help. I got professionals help and their services are really very good. Thanks

Nadeem Aslam
Great Support Team02/09/2018

Great experience, great service!!

George

Read More...