Software Engineering Quiz

CallTutors Guarantees

  • Work Within Deadline
  • Lowest Price Guaranteed
  • Plagiarism Free Guaranteed
  • 24 * 7 Availability
  • Native Experienced Experts
  • Free Revisions



Get
Flat 30% Off
on your Assignment Now!

Price Includes

Plagiarism Report

$20.99
free

Limitless Amendments

$31.49
free

Bibliography

$17.05
free

Outline

$6.55
free

Title Page

$6.55
free

Formatting

$10.49
free

Get all these features

$93.12
free

Which of the following is NOT a major phase of information engineering?
Select one:
a. Enterprise Analysis
b. Business Area Analysis
c. Business System Analysis
d. Construction

The correct answer is: Business System Analysis

Question 2

Temporal Metrics include all but the following except:
Select one:
a. Environmental Metrics
b. Collateral Damage Potential (CDP)
c. Remediation Level (RL)
d. Report Confidence (RC)
The correct answer is: Environmental Metrics

Question 3

See Table 13-1; which methodology requires Business Entity Analysis?
Select one:
a. Process
b. Data
c. Object
d. None of the above
The correct answer is: Data

Question 4

See Figure 12-17; Which subdomain is responsible for service objects such as Define logical data access control and application presentation.
Select one:
a. Data.
b. Human.
c. Software.
d. Hardware/Operating System.

The correct answer is: Data.

Question 5

True or False: The purpose of a project plan is to maintain control of a project.
Select one:
True
False
The correct answer is 'True'.

Question 6

True or False:Risk is the relative impact that an exploited vulnerability would have to a user's environment.
Select one:
True
False
The correct answer is 'True'.

Question 7

According to Table 13-5; Which methodology is MOST predictable and consistent:

Select one:
a. Process
b. Data
c. Object
d. None of the above
The correct answer is: Data

Question 8

The _______ supports and sells the goals of the project throughout the organization:
Select one:
a. Project Manager
b. Sponsor
c. Champion
d. User

The correct answer is: Champion

Question 9

The Goal of 3NF Is to:
Select one:
a. Remove Repeating Groups
b. Remove Partial Key Dependencies
c. Remove Non-Repeating Groups
d. Remove Nonkey Dependencies Program code

The correct answer is: Remove Nonkey Dependencies Program code

Question 10

Jenkins (2005) listed the mythical man month diagram how many interfaces exist for a 5 person project.
Select one:
a. 1
b. 3
c. 6
d. 10

The correct answer is: 6

Question 11

FIGURE 7-3 Sample Data Flow Diagram depicts data flowing from Process 2.0 to:
Select one:
a. File B
b. Process 3.0
c. Entity Name 1
d. Process 2.0

The correct answer is: Entity Name 1

Question 12

All listed below are examples of stakeholders with the exception of:
Select one:
a. End user
b. Programmer
c. Executive
d. Expert

The correct answer is: Programmer

Question 13

True or False: In this diagram the activity production phase 1 can begin before specify requirements has completed.

Select one:
True
False
The correct answer is 'False'.

Question 14

True or False: Both ADW and IEF are CASE tools.
Select one:
True
False
The correct answer is 'True'.

Question 15

True or False: Data-oriented methods assume that, since data are unstable and processes are, data should be the main focus of activities.
Select one:
True
False
The correct answer is 'False'.

Question 16

Which of the following is NOT an element of a project plan:
Select one:
a. What location is involved
b. When it needs to be done by
c. Who is to do it
d. How it is to be achieved

The correct answer is: What location is involved

Question 17

True or False: The two major activities of data modeling are the creation and refinement of an enemy-relationship diagram (ERD) and entity structure analysis.
Select one:
True
False
The correct answer is 'False'.

Question 18

True or False: CASE tools can ONLY be used in single user versions and NOT multiuser.
Select one:
True
False
The correct answer is 'False'.

Question 19

A __________ is written by the PM and the SE and used to advertise a project to vendors to bid on.
Select one:
a. Bidding document
b. Project request
c. Request for bid
d. Request for proposal (RFP)

The correct answer is: Request for proposal (RFP)

Question 20

In "FIGURE 10-52 Example of Process Hierarchy Diagram," which of the following is NOT one of the four sub processes of sales?

Select one:
a. Data fulfillment
b. Prospect maintenance
c. Data security
d. Inventory fulfillment

The correct answer is: Data fulfillment

Question 21

An important part of the maintainability is to make all which of the following available:
Select one:
a. Project documentation
b. Design documentation
c. Supporting material
d. All of the above

The correct answer is: All of the above

Question 22

Based on this diagram return on investment (ROI) will be reached:

Select one:
a. 1 year
b. 2 years
c. 3 years
d. None of the above

The correct answer is: None of the above

Question 23

Two methods of analyzing methodology classes are:
Select one:
a. Information systems methodology framework
b. Humphrey's maturity framework
c. Information systems methodology framework and Humphrey's maturity framework
d. None of these
The correct answer is: Information systems methodology framework and Humphrey's maturity framework

Question 24

Boilerplate code means that the code:
Select one:
a. does vary from one program to another
b. is critical to maintaining applications at the functional level rather than at the code level.
c. does not vary from one program to another
d. meaning not changeable after it is accepted as complete, motivates users to be as complete in their thinking as possible

The correct answer is: does not vary from one program to another

Question 25

True or False: Cohesion is a measure of the external strength of a module with the notion that maximal, or functional, cohesion is the goal.
Select one:
True
False
The correct answer is 'False'.

Question 26

True or False: Vulnerability is a bug, flaw, weakness, or exposure of an application, system, device, or service that could lead to a failure of confidentiality, integrity, or availability.
Select one:
True
False
The correct answer is 'True'.

Question 27

A ____ test is performed for each of the smallest units of code?
Select one:
a. Regression
b. System
c. Integration
d. Unit

The correct answer is: Unit

Question 28

True or False: Identification does not refer to both Analysis and Design.
Select one:
True
False
The correct answer is 'False'.

Question 29

True or False: The code validation file has the validation role for Process 1.2.
Select one:
True
False
The correct answer is 'False'.

Question 30

True or False: Data-oriented design uses data as the basis for clustering processes, building databases, and identifying.
Select one:
True
False
The correct answer is 'True'.

Question 31

True or False: The scope triangle is NOT also called the quality triangle.
Select one:
True
False
The correct answer is 'False'.

Question 32

In "FIGURE 9-24 Decomposition for Customer and Video Maintenance Remove Repeating Groups," which processes are decomposed?
Select one or more:
a. Rental/Return
b. Accounting
c. Purchasing
d. Personnel / payroll

The correct answer is: Rental/Return, Purchasing

Question 33

Horizontal (or Subset) Data Partitioning:
Select one:
a. Complete 'records' or tuples of data are stored with different data in more than one location.
b. Data are copied in more than one location.
c. Partial 'records' or tuples of data are stored in more than one location.
d. Different data are completely stored in more than one location.
Some data may be accessed by remote sites.

The correct answer is: Partial 'records' or tuples of data are stored in more than one location.

Question 34

Table III-3 discusses all but:
Select one:
a. Document
b. Review
c. Coding
d. Identification

The correct answer is: Coding

Question 35

True or False: The purpose of the regression test is to ensure that the changes cause the application to regress to a functional state, that is, that the changes do introduce errors into the processing.
Select one:
True
False
The correct answer is 'False'.

Question 36

The specific activities in structured systems analysis:
Select one:
a. Develop a context diagram
b. Optionally, develop a state-transition diagram if building an on-line or real-time application
c. Develop a structured data dictionary
d. Develop a set of balanced data flow diagrams

The correct answer is: Develop a structured data dictionary

Question 37

True or False: Computer-aided software engineering (CASE) tools automate the hardware engineering process.
Select one:
True
False
The correct answer is 'False'.

Question 38

True or False: The code validation file has the validation role for Process 1.
Select one:
True
False
The correct answer is 'False'.

Question 39

True or False: White-box testing evaluates specific execute item logic to guarantee its proper functioning.
Select one:
True
False
The correct answer is 'True'.

Question 40

In the following development project schedule what is the deliverable for the acceptance testing phase:

Select one:
a. Project proposal
b. Requirements Spec
c. Alpha
d. Release system

The correct answer is: Release system

Question 41

True or False: Software engineering is the systematic application of tools and techniques in theer is 'True'.

Question 42

Which is NOT a phase of project lifecycle (PLC)?
Select one:
a. Analysis and Design
b. Project Initiation
c. System Retirement
d. Preparation for Software Engineering

The correct answer is: System Retirement

Question 43

True or False: Scope encompasses your vision, but NOT your goal.
Select one:
True
False
The correct answer is 'False'.

Question 44

The Common Vulnerability Scoring System (CVSS) is an open framework that addresses what issue?
Select one:
a. Identifying and assessing vulnerabilities across many disparate software platforms
b. Identifying and assessing vulnerabilities across many disparate hardware platforms
c. Identifying and assessing vulnerabilities across many disparate hardware and software platforms
d. None of the above
The correct answer is: Identifying and assessing vulnerabilities across many disparate hardware and software platforms

Question 45

Legacy Systems are in what phase?
Select one:
a. design
b. installation
c. operations
d. maintenance
The correct answer is: maintenance

Question 46

Environmental Metrics include all the following except:
Select one:
a. Collateral Damage Potential (CDP)
b. Target Distribution (TD)
c. Security Requirements (CR, IR, AR)
d. Temporal vector's
The correct answer is: Temporal vector's

Question 47

The process diagram defines the hardware environment and shows process assignments to software.
Select one:
True
False
The correct answer is 'False'.

Question 48

Software engineers are involved in these activities in which correct order:
Select one:
a. Development, operation, maintenance or retirement
b. Operation, development, retirement and maintenance
c. Development, operation, maintenance and retirement
d. Operation, development, maintenance and retirement

The correct answer is: Development, operation, maintenance and retirement

Question 49

A __________work product is a product that is considered complete and that is the basis for other, current work by the project development team.
Select one:
a. Baseline
b. Change request
c. checklist
d. Change Control File

The correct answer is: Baseline

Question 50

A Structured Walk-Through does not include which work product?
Select one:
a. Program code
b. Programmer
c. Test plan
d. Test design

The correct answer is: Programmer
A Structured Walk-Through does not include this work product:
Select one:
a. Program code
b. Programmer
c. Test plan
d. Test design

The correct answer is: Programmer

Question 2

See Table 13-1; which methodology requires human interface guidelines?
Select one:
a. Process
b. Data
c. Object
d. None of the above
The correct answer is: Object

Question 3

The video store case study in chapter 2 includes requirements for are
d. Networks

The correct answer is: Rental Processing

Question 4

True/False: Booch diagram are used to summarize the objects-both application and service - and their interactions.
Select one:
True
False
The correct answer is 'True'.

Question 5

True or False: Software engineering is the systematic application of tools and techniques in the development of computer-based applications.
Select one:
True

Select one:
a. design
b. installation
c. operations
d. maintenance
The correct answer is: maintenance

Question 7

True or False: Encapsulated Objects can have both Public or Private Parts.
Select one:
True
False
The correct answer is 'False'.

Question 8
To regress to a functional state, that is, that the changes do introduce errors into the processing.
Select one:
True
False
The correct answer is 'False'.

Question 9

There are five rules of scheduling; which of the following is NOT one of them:
Select one:
a. Eliminate uncertainty wherever you can
b. Pick the right level of granularity
c. Take a vacation
d. Analyst/Designer Toolkit

The correct answer is: Take a vacation

Question 10

The list below are useful terms in expressing requirements specifications and can be abbreviated to stand for:

Select one:
a. START
b. STOP
c. SMART
d. None of the above

The correct answer is: SMART

Question 11


A __________ is written by the PM and the SE and used to advertise a project to vendors to bid on.
Select one:
a. Bidding document
b. Project request
c. Request for bid
d. Request for proposal (RFP)

The correct answer is: Request for proposal (RFP)

Question 12

True or False: Scope encompasses your vision, but NOT your goal.
Select one:
True
False
The correct answer is 'False'.

Question 13

True or False: Computer-aided software engineering (CASE) tools automate the hardware engineering process.
Select one:
True
False
The correct answer is 'False'.

Question 14

True or False: White-box testing evaluates specific execute item logic to guarantee its proper functioning.
Select one:
True
False
The correct answer is 'True'.

Question 15

True or False: Computer-aided software engineering (CASE) tools automate the hardware engineering process.
Select one:
True
False
The correct answer is 'False'.

Question 16

Jenkins (2005) listed the mythical man month diagram how many interfaces exist for a 5 person project.
Select one:
a. 1
b. 3
c. 6
d. 10

The correct answer is: 6

Question 17

All listed below are examples of stakeholders with the exception of:
Select one:
a. End user
b. Programmer
c. Executive
d. Expert

The correct answer is: Programmer

Question 18

The _______ supports and sells the goals of the project throughout the organization:
Select one:
a. Project Manager
b. Sponsor
c. Champion
d. User

The correct answer is: Champion

Question 19

True or False: In this diagram the activity production phase 1 can begin before specify requirements has completed.

Select one:
True
False
The correct answer is 'False'.

Question 20

In the following development project schedule what is the deliverable for the acceptance testing phase:

Select one:
a. Project proposal
b. Requirements Spec
c. Alpha
d. Release system

The correct answer is: Release system

Question 21

The major activities of structured design are all except:
Select one:
a. Develop program specifications
b. Transform or transaction analysis of DFD
c. Define the logical database
d. Refine and complete structure chart

The correct answer is: Define the logical database

Question 22

True or False: The code validation file has the validation role for Process 1.2.
Select one:
True
False
The correct answer is 'False'.

Question 23

Which is NOT a phase of project lifecycle (PLC)?
Select one:
a. Analysis and Design
b. Project Initiation
c. System Retirement
d. Preparation for Software Engineering

The correct answer is: System Retirement

Question 24

True or False: Information systems methodology framework is NOT used to compare methodologies.
Select one:
True
False
The correct answer is 'False'.

Question 25

True or False: Booch diagrams are also called module structure diagrams.
Select one:
True
False
The correct answer is 'True'.

Question 26

True or False: The two major activities of data modeling are the creation and refinement of an enemy-relationship diagram (ERD) and entity structure analysis.
Select one:
True
False
The correct answer is 'False'.

Question 27

The R in CRUD matrix stands for:
Select one:
a. Repeat
b. Return
c. Report
d. Retrieve

The correct answer is: Retrieve

Question 28

Table 12-1 Object-Oriented Design Documentation; how many (tables and diagrams):
Select one:
a. 3,3
b. 4,3
c. 4,4
d. 3,4

The correct answer is: 3,4

Question 29

True or False: Vulnerability is a bug, flaw, weakness, or exposure of an application, system, device, or service that could lead to a failure of confidentiality, integrity, or availability.
Select one:
True
False
The correct answer is 'True'.

Question 30

True or False: The means to store unlimited, continuously growing databases currently are called data marts.
Select one:
True
False
The correct answer is 'False'.

Question 31

The specific activities in structured systems analysis:
Select one:
a. Develop a context diagram
b. Optionally, develop a state-transition diagram if building an on-line or real-time application
c. Develop a structured data dictionary
d. Develop a set of balanced data flow diagrams

The correct answer is: Develop a structured data dictionary

Question 32

See Figure 2: CVSS Metrics and Equations. Which values are considered optional when reflecting the risk posed by the vulnerability to a user's environment?
Select one:
a. Base metrics plus vector
b. Temporal metrics
c. Environmental metrics
d. B and C
The correct answer is: B and C

Question 33

True or False: Cohesion is a measure of the external strength of a module with the notion that maximal, or functional, cohesion is the goal.
Select one:
True
False
The correct answer is 'False'.

Question 34

A ____ test is performed for each of the smallest units of code?
Select one:
a. Regression
b. System
c. Integration
d. Unit

The correct answer is: Unit

Question 35

Jenkins (2005) stated that the critical path is defined as:
Select one:
a. It is this path that you can traverse in order to reach completion of your project on time
b. It is this path that you must traverse in order to reach completion of your project on time
c. The critical path represents the ideal set of tasks to be complete for your project
d. The critical path represents a set of tasks to be complete for your project

The correct answer is: It is this path that you must traverse in order to reach completion of your project on time

Question 36

Boilerplate code means that the code:
Select one:
a. does vary from one program to another
b. is critical to maintaining applications at the functional level rather than at the code level.
c. does not vary from one program to another
d. meaning not changeable after it is accepted as complete, motivates users to be as complete in their thinking as possible

The correct answer is: does not vary from one program to another

Question 37

True or False: In a required relationship, the entity must be present for the other entity to exist. In an optional relationship, the entity must be present for the other entity to exist.
Select one:
True
False
The correct answer is 'True'.

Question 38

True or False:Risk is the relative impact that an exploited vulnerability would have to a user's environment.
Select one:
True
False
The correct answer is 'True'.

Question 39

Table III-3 discusses all but:
Select one:
a. Document
b. Review
c. Coding
d. Identification

The correct answer is: Coding

Question 40

Project Managers must exhibit all these qualities except:
Select one:
a. Understanding
b. Trust
c. Budgeting
d. Empathy

The correct answer is: Budgeting

Question 41

How many types in "FIGURE 9-27 Types of Process Dependency Connections?"
Select one:
a. One
b. Two
c. Three
d. Five

The correct answer is: Five

Question 42

The Common Vulnerability Scoring System (CVSS) is an open framework that addresses what issue?
Select one:
a. Identifying and assessing vulnerabilities across many disparate software platforms
b. Identifying and assessing vulnerabilities across many disparate hardware platforms
c. Identifying and assessing vulnerabilities across many disparate hardware and software platforms
d. None of the above
The correct answer is: Identifying and assessing vulnerabilities across many disparate hardware and software platforms

Question 43

True or False: The Humphrey's maturity frameworks were developed for the Department of Defense as a self-assessment framework that identifies levels of computing and application development process maturity.
Select one:
True
False
The correct answer is 'True'.

Question 44

An important part of the maintainability is to make all which of the following available:
Select one:
a. Project documentation
b. Design documentation
c. Supporting material
d. All of the above

The correct answer is: All of the above

Question 45

True or False: There are three basic types of business programs: report, edit/validate, and file update.
Select one:
True
False
The correct answer is 'True'.

Question 46

Potential distribution of the application. The specific activities in structured systems analysis:
Select one:
a. Develop a context diagram
b. Optionally, develop a state-transition diagram if building an on-line or real-time application
c. Develop a structured data dictionary
d. Develop a set of balanced data flow diagrams

The correct answer is: Develop a structured data dictionary

Question 47

Horizontal (or Subset) Data Partitioning:
Select one:
a. Complete 'records' or tuples of data are stored with different data in more than one location.
b. Data are copied in more than one location.
c. Partial 'records' or tuples of data are stored in more than one location.
d. Different data are completely stored in more than one location.
Some data may be accessed by remote sites.

The correct answer is: Partial 'records' or tuples of data are stored in more than one location.

Question 48

Which of the following is NOT a major phase of information engineering?
Select one:
a. Enterprise Analysis
b. Business Area Analysis
c. Business System Analysis
d. Construction

The correct answer is: Business System Analysis

Question 49

"TABLE 8-9 CASE Tools for Structured Design Program" code includyst/Designer Toolkit

The correct answer is: Oracle

Question 50

The Base Metrics include all the following except:
Select one:
a. Access Vector
b. Authentication
c. Confidentiality, Integrity, Availability
d. Confidentiality, Integrity, Availability Impacts
The correct answer is: Confidentiality, Integrity, Availability
The Data Dictionary Process Contents does not include:
Select one:
a. Process Data
b. Process ID Number
c. Constraints (e.g., concurrence, sequential with another process, time-out, etc.)
d. Process Name

The correct answer is: Process Data

Question 2

True or False: The systems engineer provides organizational expertise while the project manager provides technical expertise.
Select one:
True
False
The correct answer is 'False'.

Question 3

The Goal of 3NF Is to:
Select one:
a. Remove Repeating Groups
b. Remove Partial Key Dependencies
c. Remove Non-Repeating Groups
d. Remove Nonkey Dependencies Program code

The correct answer is: Remove Nonkey Dependencies Program code

Question 4

True or False: Data-oriented design uses data as the basis for clustering processes, building databases, and identifying.
Select one:
True
False
The correct answer is 'True'.

Question 5

"FIGURE 9-7 ABC Video Partial Functional Decomposition of Purchasing" is a:
Select one:
a. Program code
b. Process flow
c. Function
d. Data flow

The correct answer is: Process flow

Question 6

True/False: Object oriented design has seven steps.
Select one:
True
False
The correct answer is 'True'.

Question 7

True or False: Sometimes referred to as a ‘business case’, the project proposal states the lowest level goals in a project.
Select one:
True
False
The correct answer is 'False'.

Question 8

Two methods of analyzing methodology classes are:
Select one:
a. Information systems methodology framework
b. Humphrey's maturity framework
c. Information systems methodology framework and Humphrey's maturity framework
d. None of these
The correct answer is: Information systems methodology framework and Humphrey's maturity framework

Question 9

True or False: Encapsulated Objects can have both Public or Private Parts.
Select one:
True
False
The correct answer is 'False'.

Question 10

Environmental Metrics include all the following except:
Select one:
a. Collateral Damage Potential (CDP)
b. Target Distribution (TD)
c. Security Requirements (CR, IR, AR)
d. Temporal vector's
The correct answer is: Temporal vector's

Question 11

The purpose of the Sample Change Request Impact Form:
Select one:
a. Document the priority for the action, and the cost and schedule of the change
b. The PM and SE define the schedule and cost.
c. The PM and SE redefine the schedule and the cost.
d. impe correct answer is: impacts of the change document the priority for the action, and the cost and schedule of the change.

Question 12

Based on this diagram return on investment (ROI) will be reached:

Select one:
a. 1 year
b. 2 years
c. 3 years
d. None of the above

The correct answer is: None of the above

Question 13

The Data Dictionary Process Contents does not include:
Select one:
a. Process Data
b. Process ID Number
c. Constraints (e.g., concurre is: Process Data

Question 14

See Table 13-1; which methodology requires Business Entity Analysis?
Select one:
a. Process
b. Data
c. Object
d. None of the above
The correct answer is: Data

Question 15

A __________work product is a product that is considered complete and that is the basis for other, current work by the project development team.
Select one:
a. Baseline
b. Change request
c. checklist
d. Change Control File

The correct answer is: Baseline

Question 16

True or False: The product or project can be accepted even if Z; �UZ; �U�� �UO� �UxZ; �U0Z; �U@0Z; �Ulse'.

Question 17

True or False: Program specifications document the program's purpose, process requirements, the logical and physical data definitions, input and output formats, screen layouts, constraints, and special processing considerations that might complicate the program.
Select one:
True
False
The correct answer is 'True'.

Question 18

True or False: The code validation file has the validation role for Process 1.2.
Select one:
True
False
The correct answer is 'False'.

Question 19

True or False: Both ADW and IEF are CASE tools.
Select one:
True
False
The correct answer is 'True'.

Question 20

True or False: Data-oriented methods assume that, since data are unstable and processes are, data should be the main focus of activities.
Select one:
True
False
The correct answer is 'False'.

Question 21

Which of the following is NOT an element of a project plan:
Select one:
a. What location is involved
b. When it needs to be done by
c. Who is to do it
d. How it is to be achieved

The correct answer is: What location is involved

Question 22

The results of structured design are all BUT the following:
Select one:
a. programming specifications
b. plans for testing
c. conversation
d. training and installation

The correct answer is: conversation

Question 23

Temporal Metrics include all but the following except:
Select one:
a. Environmental Metrics
b. Collateral Damage Potential (CDP)
c. Remediation Level (RL)
d. Report Confidence (RC)
The correct answer is: Environmental Metrics

Question 24

True or False: The purpose of a project plan is to maintain control of a project.
Select one:
True
False
The correct answer is 'True'.

Question 25

True or False: In "FIGURE 9-17 ABC Rental Processing-First-Cut Entity-Relationship Diagram," the three entities are: Customer, Video, Rental and Request.
Select one:
True
False
The correct answer is 'False'.

Question 26

Software engineers are involved in these activities in which correct order:
Select one:
a. Development, operation, maintenance or retirement
b. Operation, development, retirement and maintenance
c. Development, operation, maintenance and retirement
d. Operation, development, maintenance and retirement

The correct answer is: Development, operation, maintenance and retirement

Question 27

True or False: Figure 7-9 Example of Complex Context Diagram describes a inflows context called patients claims processing.
Select one:
True
False
The correct answer is 'True'.

Question 28

In "FIGURE 9-24 Decomposition for Customer and Video Maintenance Remove Repeating Groups," which processes are decomposed?
Select one or more:
a. Rental/Return
b. Accounting
c. Purchasing
d. Personnel / payroll

The correct answer is: Rental/Return, Purchasing

Question 29

True or False: The scope triangle is NOT also called the quality triangle.
Select one:
True
False
The correct answer is 'False'.

Question 30

Which goal is stated in a clear and concise manner and more likely to inspire team members to achieve it?
Select one:
a. “To deliver the cheapest system, in the shortest time, that just about gets the job done”
b. “To deliver the best sales and marketing system on the market”
c. “To deliver the cheapest system, in the shortest time, that almost gets the job done”
d. “To deliver a sales and marketing system on time”

The correct answer is: “To deliver the best sales and marketing system on the market”

Question 31

True or False: Data requirements for applications include: input, output, storage, and retrieval.
Select one:
True
False
The correct answer is 'True'.

Question 32

See Table 13-2; which methodology does not require Data Relationships knowledge?
Select one:
a. Process
b. Data
c. Object
d. None of the above
The correct answer is: Process

Question 33

A Structured Walk-Through does not include this work product:
Select one:
a. Program code
b. Programmer
c. Test plan
d. Test design

The correct answer is: Programmer

Question 34

Figure 7-3 Sample Data Flow Diagram depicts data flowing from Process 2.0 to:
Select one:
a. File B
b. Process 3.0
c. Entity Name 1
d. Process 2.0

The correct answer is: Entity Name 1

Question 35

An _______ is an entity from the real world whose processes and attributes (that is, the data) are modeled in a computerized application.
Select one:
a. abstract data type (ADT)
b. Class/objects
c. Object
d. class

The correct answer is: Object

Question 36

Useful tools for software engineers DO NOT include:
Select one:
a. process dependencies
b. synchronization matrix
c. process hierarchies
d. object diagrams.

The correct answer is: synchronization matrix

Question 37

True or False: Threat is the likelihood or frequency of a harmful event occurring.
Select one:
True
False
The correct answer is 'True'.

Question 38

True or False: Traceability is proven at test or implementation time and validates that a requirement has been satisfied.
Select one:
True
False
The correct answer is 'True'.

Question 39

The critical path of a project is defined as:
Select one:
a. Shortest sequence of dependent tasks to project completion.
b. The sequence of dependent tasks that together take the most time. If any of the tasks are delayed, the project is also delayed
c. The sequence of dependent tasks that together take the least time. If any of the tasks are delayed, the project can complete on time.
d. Longest sequence of dependent tasks to project completion.

The correct answer is: The sequence of dependent tasks that together take the most time. If any of the tasks are delayed, the project is also delayed

Question 40

Project teams characterize risk by impact and likelihood. Which quadrant is high impact and high likelihood?

Select one:
a. Major
b. Critical
c. Minor
d. Major

The correct answer is: Critical

Question 41

True or False: Booch diagrams are also called module structure diagrams.
Select one:
True
False
The correct answer is 'True'.

Question 42

Which of the following is NOT a group of CVSS?
Select one:
a. Base
b. Temporal
c. Environmental
d. Human
The correct answer is: Human

Question 43

According to Table 13-5; Which methodology is MOST predictable and consistent:

Select one:
a. Process
b. Data
c. Object
d. None of the above
The correct answer is: Data

Question 44

The purpose of the system test is:
Select one:
a. demonstrate an application's ability to operate satisfactorily in the actual production environment using its intended hardware and software configuration.
b. is a system test and NOT a documentation test.
c. test to demonstrate an application's ability to operate satisfactorily in a simulated production environment using its intended hardware and software configuration.
d. ensure that the changes do not cause the application to regress to a nonfunctional state, that is, that the changes do not introduce errors into the processing.

The correct answer is: test to demonstrate an application's ability to operate satisfactorily in a simulated production environment using its intended hardware and software configuration.

Question 45

Restructuring is:
Select one:
a. the redevelopment of a portion of an application with a bridge to the old application.
b. is the reverse analysis of an old application to conform to a new methodology, usually Information Engineering or object orientation.
c. is also known as reverse engineering. Rebuilding is the retirement and redevelopment of an application.
d. the redevelopment of an application with a bridge to the old application.

The correct answer is: the redevelopment of a portion of an application with a bridge to the old application.

Question 46

True or False: The Temporal group reflects the intrinsic qualities of a vulnerability.
Select one:
True
False
The correct answer is 'False'.

Question 47

____ are input data created to demonstrate that both components and the total system satisfy all design requirements.
Select one:
a. Test plan
b. Test strategy
c. Test cases
d. Subsystem testing

The correct answer is: Test cases

Question 48

True or False: In many projects the change management system is NOT linked to (or is part of) a defect tracking.
Select one:
True
False
The correct answer is 'False'.

Question 49

In "FIGURE 10-52 Example of Process Hierarchy Diagram," which of the following is NOT one of the four sub processes of sales?

Select one:
a. Data fulfillment
b. Prospect maintenance
c. Data security
d. Inventory fulfillment

The correct answer is: Data fulfillment

Question 50

True or False: CASE tools can ONLY be used in single user versions and NOT multiuser.
Select one:
True
False
The correct answer is 'False'.
True or False: Data requirements for applications include: input, output, storage, and retrieval.
Select one:
True
False
The correct answer is 'True'.

Question 2

The Project Manager’s job is to:
Select one:
a. Must understand the customer requirements for the team and keep the SE’s on track.
b. Leads the design, coding and testing effort. Decides which process to use (data, or object oriented design) and directs and reviews the SE2 products.
c. Leads the team and is responsible for the final product quality and timeliness.
d. Documents the figures, diagrams for process, data, or object oriented design.
e. Constructs schedule and milestones and keeps the PM informed and on schedule.

The correct answer is: Leads the team and is responsible for the final product quality and timeliness.

Question 3

True or False: White-box testing evaluates specific execute item logic to guarantee its proper functioning.
Select one:
True
False
The correct answer is 'True'.

Question 4

The process diagram defines the hardware environment and shows process assignments to software.
Select one:
True
False
The correct answer is 'False'.

Question 5

True or False: In a required relationship, the entity must be present for the other entity to exist. In an optional relationship, the entity must be present for the other entity to exist.
Select one:
True
False
The correct answer is 'True'.

Question 6

In "FIGURE 9-24 Decomposition for Customer and Video Maintenance Remove Repeating Groups," which processes are decomposed?
Select one or more:
a. Rental/Return
b. Accounting
c. Purchasing
d. Personnel / payroll

The correct answer is: Rental/Return, Purchasing

Question 7

True or False: Both ADW and IEF are CASE tools.
Select one:
True
False
The correct answer is 'True'.

Question 8

True or False: The scope triangle is NOT also called the quality triangle.
Select one:
True
False
The correct answer is 'False'.

Question 9

True or False: CASE tools can ONLY be used in single user versions and NOT multiuser.
Select one:
True
False
The correct answer is 'False'.

Question 10

FIGURE 7-3 Sample Data Flow Diagram depicts data flowing from Process 2.0 to:
Select one:
a. File B
b. Process 3.0
c. Entity Name 1
d. Process 2.0

The correct answer is: Entity Name 1

Question 11

Jenkins (2005) stated that the critical path is defined as:
Select one:
a. It is this path that you can traverse in order to reach completion of your project on time
b. It is this path that you must traverse in order to reach completion of your project on time
c. The critical path represents the ideal set of tasks to be complete for your project
d. The critical path represents a set of tasks to be complete for your project

The correct answer is: It is this path that you must traverse in order to reach completion of your project on time

Question 12

True or False: In many projects the change management system is NOT linked to (or is part of) a defect tracking.
Select one:
True
False
The correct answer is 'False'.

Question 13

True or False: Data-oriented methods assume that, since data are unstable and processes are, data should be the main focus of activities.
Select one:
True
False
The correct answer is 'False'.

Question 14

Restructuring is:
Select one:
a. the redevelopment of a portion of an application with a bridge to the old application.
b. is the reverse analysis of an old application to conform to a new methodology, usually Information Engineering or object orientation.
c. is also known as reverse engineering. Rebuilding is the retirement and redevelopment of an application.
d. the redevelopment of an application with a bridge to the old application.

The correct answer is: the redevelopment of a portion of an application with a bridge to the old application.

Question 15

True or False: Computer-aided software engineering (CASE) tools automate the hardware engineering process.
Select one:
True
False
The correct answer is 'False'.

Question 16

How many types in "FIGURE 9-27 Types of Process Dependency Connections?"
Select one:
a. One
b. Two
c. Three
d. Five

The correct answer is: Five

Question 17

True or False: Threat is the likelihood or frequency of a harmful event occurring.
Select one:
True
False
The correct answer is 'True'.

Question 18

True or False: Identification does not refer to both Analysis and Design.
Select one:
True
False
The correct answer is 'False'.

Question 19

True or False: The purpose of a project plan is to maintain control of a project.
Select one:
True
False
The correct answer is 'True'.

Question 20

Jenkins (2005) listed the mythical man month diagram how many interfaces exist for a 5 person project.
Select one:
a. 1
b. 3
c. 6
d. 10

The correct answer is: 6

Question 21

Figure 7-3 Sample Data Flow Diagram depicts data flowing from Process 2.0 to:
Select one:
a. File B
b. Process 3.0
c. Entity Name 1
d. Process 2.0

The correct answer is: Entity Name 1

Question 22

True or False: Figure 7-9 Example of Complex Context Diagram describes a inflows context called patients claims processing.
Select one:
True
False
The correct answer is 'True'.

Question 23

According to Table 13-5; Which methodology is MOST predictable and consistent:

Select one:
a. Process
b. Data
c. Object
d. None of the above
The correct answer is: Data

Question 24

Two methods of analyzing methodology classes are:
Select one:
a. Information systems methodology framework
b. Humphrey's maturity framework
c. Information systems methodology framework and Humphrey's maturity framework
d. None of these
The correct answer is: Information systems methodology framework and Humphrey's maturity framework

Question 25

True or False: Data-oriented design uses data as the basis for clustering processes, building databases, and identifying.
Select one:
True
False
The correct answer is 'True'.

Question 26

Potential distribution of the application. The specific activities in structured systems analysis:
Select one:
a. Develop a context diagram
b. Optionally, develop a state-transition diagram if building an on-line or real-time application
c. Develop a structured data dictionary
d. Develop a set of balanced data flow diagrams

The correct answer is: Develop a structured data dictionary

Question 27

Boilerplate code means that the code:
Select one:
a. does vary from one program to another
b. is critical to maintaining applications at the functional level rather than at the code level.
c. does not vary from one program to another
d. meaning not changeable after it is accepted as complete, motivates users to be as complete in their thinking as possible

The correct answer is: does not vary from one program to another

Question 28

An important part of the maintainability is to make all which of the following available:
Select one:
a. Project documentation
b. Design documentation
c. Supporting material
d. All of the above

The correct answer is: All of the above

Question 29

"TABLE 8-9 CASE Tools for Structured Design Program" code include all but:

Select one:
a. The Developer
b. Maestro
c. Oracle
d. Analyst/Designer Toolkit

The correct answer is: Oracle

Question 30

The specific activities in structured systems analysis:
Select one:
a. Develop a context diagram
b. Optionally, develop a state-transition diagram if building an on-line or real-time application
c. Develop a structured data dictionary
d. Develop a set of balanced data flow diagrams

The correct answer is: Develop a structured data dictionary

Question 31

Table III-3 discusses all but:
Select one:
a. Document
b. Review
c. Coding
d. Identification

The correct answer is: Coding

Question 32

The video store case study in chapter 2 includes requirements for customer, video and ___________.
Select one:
a. Rental Processing
b. Software
c. Hardware
d. Networks

The correct answer is: Rental Processing

Question 33

See Table 13-1; which methodology requires human interface guidelines?
Select one:
a. Process
b. Data
c. Object
d. None of the above
The correct answer is: Object

Question 34

The Base Metrics include all the following except:
Select one:
a. Access Vector
b. Authentication
c. Confidentiality, Integrity, Availability
d. Confidentiality, Integrity, Availability Impacts
The correct answer is: Confidentiality, Integrity, Availability

Question 35

Which goal is stated in a clear and concise manner and more likely to inspire team members to achieve it?
Select one:
a. “To deliver the cheapest system, in the shortest time, that just about gets the job done”
b. “To deliver the best sales and marketing system on the market”
c. “To deliver the cheapest system, in the shortest time, that almost gets the job done”
d. “To deliver a sales and marketing system on time”

The correct answer is: “To deliver the best sales and marketing system on the market”

Question 36

A ____ test is performed for each of the smallest units of code?
Select one:
a. Regression
b. System
c. Integration
d. Unit

The correct answer is: Unit

Question 37

True or False: The Temporal group reflects the intrinsic qualities of a vulnerability.
Select one:
True
False
The correct answer is 'False'.

Question 38

True or False: In this diagram the activity production phase 1 can begin before specify requirements has completed.

Select one:
True
False
The correct answer is 'False'.

Question 39

Which is NOT a phase of project lifecycle (PLC)?
Select one:
a. Analysis and Design
b. Project Initiation
c. System Retirement
d. Preparation for Software Engineering

The correct answer is: System Retirement

Question 40

True/False: Booch diagram are used to summarize the objects-both application and service - and their interactions.
Select one:
True
False
The correct answer is 'True'.

Question 41

True or False: In "FIGURE 9-17 ABC Rental Processing-First-Cut Entity-Relationship Diagram," the three entities are: Customer, Video, Rental and Request.
Select one:
True
False
The correct answer is 'False'.

Question 42

The major activities of structured design are all except:
Select one:
a. Develop program specifications
b. Transform or transaction analysis of DFD
c. Define the logical database
d. Refine and complete structure chart

The correct answer is: Define the logical database

Question 43

There are five rules of scheduling; which of the following is NOT one of them:
Select one:
a. Eliminate uncertainty wherever you can
b. Pick the right level of granularity
c. Take a vacation
d. Analyst/Designer Toolkit

The correct answer is: Take a vacation

Question 44

The Common Vulnerability Scoring System (CVSS) is an open framework that addresses what issue?
Select one:
a. Identifying and assessing vulnerabilities across many disparate software platforms
b. Identifying and assessing vulnerabilities across many disparate hardware platforms
c. Identifying and assessing vulnerabilities across many disparate hardware and software platforms
d. None of the above
The correct answer is: Identifying and assessing vulnerabilities across many disparate hardware and software platforms

Question 45

True or False: The systems engineer provides organizational expertise while the project manager provides technical expertise.
Select one:
True
False
The correct answer is 'False'.

Question 46

The critical path of a project is defined as:
Select one:
a. Shortest sequence of dependent tasks to project completion.
b. The sequence of dependent tasks that together take the most time. If any of the tasks are delayed, the project is also delayed
c. The sequence of dependent tasks that together take the least time. If any of the tasks are delayed, the project can complete on time.
d. Longest sequence of dependent tasks to project completion.

The correct answer is: The sequence of dependent tasks that together take the most time. If any of the tasks are delayed, the project is also delayed

Question 47

True or False:Risk is the relative impact that an exploited vulnerability would have to a user's environment.
Select one:
True
False
The correct answer is 'True'.

Question 48

____ are input data created to demonstrate that both components and the total system satisfy all design requirements.
Select one:
a. Test plan
b. Test strategy
c. Test cases
d. Subsystem testing

The correct answer is: Test cases

Question 49

True or False: The means to store unlimited, continuously growing databases currently are called data marts.
Select one:
True
False
The correct answer is 'False'.

Question 50

True or False: Sometimes referred to as a ‘business case’, the project proposal states the lowest level goals in a project.
Select one:
True
False
The correct answer is 'False'.

 

True or False: Scope encompasses your vision, but NOT your goal.
Select one:
True
False
The correct answer is 'False'.

Question 2

In the following development project schedule what is the deliverable for the acceptance testing phase:

Select one:
a. Project proposal
b. Requirements Spec
c. Alpha
d. Release system

The correct answer is: Release system

Question 3

The Goal of 3NF Is to:
Select one:
a. Remove Repeating Groups
b. Remove Partial Key Dependencies
c. Remove Non-Repeating Groups
d. Remove Nonkey Dependencies Program code

The correct answer is: Remove Nonkey Dependencies Program code

Question 4

Table 12-1 Object-Oriented Design Documentation; how many (tables and diagrams):
Select one:
a. 3,3
b. 4,3
c. 4,4
d. 3,4

The correct answer is: 3,4

Question 5

The Data Dictionary Process Contents does not include:
Select one:
a. Process Data
b. Process ID Number
c. Constraints (e.g., concurrence, sequential with another process, time-out, etc.)
d. Process Name

The correct answer is: Process Data

Question 6

True or False: Information systems methodology framework is NOT used to compare methodologies.
Select one:
True
False
The correct answer is 'False'.

Question 7

Software engineers are involved in these activities in which correct order:
Select one:
a. Development, operation, maintenance or retirement
b. Operation, development, retirement and maintenance
c. Development, operation, maintenance and retirement
d. Operation, development, maintenance and retirement

The correct answer is: Development, operation, maintenance and retirement

Question 8

A Structured Walk-Through does not include which work product?
Select one:
a. Program code
b. Programmer
c. Test plan
d. Test design

The correct answer is: Programmer

Question 9

True or False: Figure 7-9 Example of Complex Context Diagram describes a inflows context called patients claims processing.
Select one:
True
False
The correct answer is 'True'.

Question 10

Temporal Metrics include all but the foll
c. Remediation Level (RL)
d. Report Confidence (RC)
The correct answer is: Environmental Metrics

Question 11

True or False: Software engineering is the systematic application of tools and techniques in the development of computer-based applications.
Select one:
True
False
The correct answer is 'True'.

Question 12

See Figure 12-17; Which subdomain is responsible for service objects such as Define logical data access control and application presentation.
Select one:
a. Data.
b. Human.
c. Software.
d. Hardware/Operating System.

The correct answer is: Data.

Question 13

True or False: Vulnerability is a bug, flaw, weakness, or exposure of an application, system, device, or service that could lead to a failure of confidentiality, integrity, or availability.
Select one:
True
False
The correct answer is 'True'.

Question 14

Which of the following is NOT a group of CVSS?
Select one:
a. Base
b. Temporal
c. Environmental
d. Human
The correct answer is: Human

Question 15

All listed below are examples of stakeholders with the exception of:
Select one:
a. End user
b. Programmer
c. Executive
d. Expert

The correct answer is: Programmer

Question 16

"FIGURE 9-7 ABC Video Partial Functional Decomposition of Purchasing" is a:
Select one:
a. Program code
b. Process flow
c. Function
d. Data flow

The correct answer is: Process flow

Question 17

See Figure 2: CVSS Metrics and Equations. Which values are considered optional when reflecting the risk posed by the vulnerability to a user's environment?
Select one:
a. Base metrics plus vector
b. Temporal metrics
c. Environmental metrics
d. B and C
The correct answer is: B and C

Question 18

True or False: Computer-aided software engineering (CASE) tools automate the hardware engineering process.
Select one:
True
False
The correct answer is 'False'.

Question 19

True or False: There are three basic types of business programs: report, edit/validate, and file update.
Select one:
True
False
The correct answer is 'True'.

Question 20

The results of structured design are all BUT the following:
Select one:
a. programming specifications
b. plans for testing
c. conversation
d. training and installation

The correct answer is: conversation

Question 21

True or False: Program specifications document the program's purpose, process requirements, the logical and physical data definitions, input and output formats, screen layouts, constraints, and special processing considerations that might complicate the program.
Select one:
True
False
The correct answer is 'True'.

Question 22

True or False: The product or project can be accepted even if acceptance testing is not complete.
Select one:
True
False
analysis:
Select one:
a. Develop a context diagram
b. Optionally, develop a state-transition diagram if building an on-line or real-time application
c. Develop a structured data dictionary
d. Develop a set of balanced data flow diagrams

The correct answer is: Develop a structured data dictionary

Question 24

Environmental Metrics include all the following except:
Select one:
a. Collateral Damage Potential (CDP)
b. Target Distribution (TD)
c. Security Requirements (CR, IR, AR)
d. Temporal vector's
The correct answer is: Temporal at
b. Return
c. Report
d. Retrieve

The correct answer is: Retrieve

Question 26

Useful tools for software engineers DO NOT include:
Select one:
a. process dependencies
b. synchronization matrix
c. process hierarchies
d. object diagrams.

The correct answer is: synchronization matrix

Question 27

True or False: The purpose of the regression test is to ensure that the changes cause the application to regress to a functional state, that is, that the changes do introduce errors into the processing.
Select one:
True
False
The correct answer is 'False'.

Question 28

The _______ supports and sells the goals of the project throughout the organization:
Select one:
a. Project Manager
b. Sponsor
c. Champion
d. User

The correct answer is: Champion

Question 29

True or False: The Z; �UZ; �U�� �UO� �UxZ; �U0Z; �U@0Z; �Urk that identifies levels of computing and application development process maturity.
Select one:
True
False
The correct answer is 'True'.

Question 30

The purpose of the Sample Change Request Impact Form:
Select one:
a. Document the priority for the action, and the cost and schedule of the change
b. The PM and SE define the schedule and cost.
c. The PM and SE redefine the schedule and the cost.
d. impacts of the change document the priority for the action, and the cost and schedule of the change.

The correct answer is: impacts of the change document the priority for the action, and the cost and schedule of the change.

Question 31

A __________work product is a product that is considered complete and that is the basis for other, current work by the project development team.
Select one:
a. Baseline
b. Change request
c. checklist
d. Change Control File

The correct answer is: Baseline

Question 32

Legacy Systems are in what phase?
Select one:
a. design
b. installation
c. operations
d. maintenance
The correct answer is: maintenance

Question 33

See Table 13-2; which methodology does not require Data Relationships knowledge?
Select one:
a. Process
b. Data
c. Object
d. None of the above
The correct answer is: Process

Question 34

Project teams characterize risk by impact and likelihood. Which quadrant is high impact and high likelihood?

Select one:
a. Major
b. Critical
c. Minor
d. Major

The correct answer is: Critical

Question 35

The purpose of the system test is:
Select one:
a. demonstrate an application's ability to operate satisfactorily in the actual production environment using its intended hardware and software configuration.
b. is a system test and NOT a documentation test.
c. test to demonstrate an application's ability to operate satisfactorily in a simulated production environment using its intended hardware and software configuration.
d. ensure that the changes do not cause the application to regress to a nonfunctional state, that is, that the changes do not introduce errors into the processing.

The correct answer is: test to demonstrate an application's ability to operate satisfactorily in a simulated production environment using its intended hardware and software configuration.

Question 36

A __________ is written by the PM and the SE and used to advertise a project to vendors to bid on.
Select one:
a. Bidding document
b. Project request
c. Request for bid
d. Request for proposal (RFP)

The correct answer is: Request for proposal (RFP)

Question 37

True or False: Traceability is proven at test or implementation time and validates that a requirement has been satisfied.
Select one:
True
False
The correct answer is 'True'.

Question 38

See Table 13-1; which methodology requires Business Entity Analysis?
Select one:
a. Process
b. Data
c. Object
d. None of the above
The correct answer is: Data

Question 39

True or False: Cohesion is a measure of the external strength of a module with the notion that maximal, or functional, cohesion is the goal.
Select one:
True
False
The correct answer is 'False'.

Question 40

Project Managers must exhibit all these qualities except:
Select one:
a. Understanding
b. Trust
c. Budgeting
d. Empathy

The correct answer is: Budgeting

Question 41

In "FIGURE 10-52 Example of Process Hierarchy Diagram," which of the following is NOT one of the four sub processes of sales?

Select one:
a. Data fulfillment
b. Prospect maintenance
c. Data security
d. Inventory fulfillment

The correct answer is: Data fulfillment

Question 42

True or False: Identification does not refer to both Analysis and Design.
Select one:
True
False
The correct answer is 'False'.

Question 43

Which of the following is NOT a major phase of information engineering?
Select one:
a. Enterprise Analysis
b. Business Area Analysis
c. Business System Analysis
d. Construction

The correct answer is: Business System Analysis

Question 44

Which of the following is NOT an element of a project plan:
Select one:
a. What location is involved
b. When it needs to be done by
c. Who is to do it
d. How it is to be achieved

The correct answer is: What location is involved

Question 45

True or False: The two major activities of data modeling are the creation and refinement of an enemy-relationship diagram (ERD) and entity structure analysis.
Select one:
True
False
The correct answer is 'False'.

Question 46

Horizontal (or Subset) Data Partitioning:
Select one:
a. Complete 'records' or tuples of data are stored with different data in more than one location.
b. Data are copied in more than one location.
c. Partial 'records' or tuples of data are stored in more than one location.
d. Different data are completely stored in more than one location.
Some data may be accessed by remote sites.

The correct answer is: Partial 'records' or tuples of data are stored in more than one location.

Question 47

Based on this diagram return on investment (ROI) will be reached:

Select one:
a. 1 year
b. 2 years
c. 3 years
d. None of the above

The correct answer is: None of the above

Question 48

True or False: The code validation file has the validation role for Process 1.2.
Select one:
True
False
The correct answer is 'False'.

Question 49

True or False: The code validation file has the validation role for Process 1.
Select one:
True
False
The correct answer is 'False'.

Question 50

The list below are useful terms in expressing requirements specifications and can be abbreviated to stand for:

Select one:
a. START
b. STOP
c. SMART
d. None of the above

The correct answer is: SMART
True or False:Risk is the relative impact that an exploited vulnerability would have to a user's environment.
Select one:
True
False
The correct answer is 'True'.

Question 2

True or False: The Temporal group reflects the intrinsic qualities of a vulnerability.
Select one:
True
False
The correct answer is 'False'.

Question 3

All listed below are examples of stakeholders with the exception of:
Select one:
a. End user
b. Programmer
c. Executive
d. Expert

The correct answer is: Programmer

Question 4

True or False: Data-oriented design uses data as the basis for clustering processes, building databases, and identifying.
Select one:
True
False
The correct answer is 'True'.

Question 5

Boilerplate code means that the code:
Select one:
a. does vary from one program to another
b. is critical to maintaining applications at the functional level rather than at the code level.
c. does not vary from one program to another
d. meaning not changeable after it is accepted as complete, motivates users to be as complete in their thinking as possible

The correct answer is: does not vary from one program to another

Question 6

A Structured Walk-Through does not include this work product:
Select one:
a. Program code
b. Programmer
c. Test plan
d. Test design

The correct answer is: Programmer

Question 7

True or False: Computer-aided software engineering (CASE) tools automate the hardware engineering process.
Select one:
True
False
The correct answer is 'False'.

Question 8

The Data Dictionary Process Contents does not include:
Select one:
a. Process Data
b. Process ID Number
c. Constraints (e.g., concurrence, sequential with another process, time-out, etc.)
d. Process Name

The correct answer is: Process Data

Question 9

See Figure 12-17; Which subdomain is responsible for service objects such as Define logical data access control and application presentation.
Select one:
a. Data.
b. Human.
c. Software.
d. Hardware/Operating System.

The correct answer is: Data.

Question 10

True or False: The systems engineer provides organizational expertise while the project manager provides technical expertise.
Select one:
True
False
The correct answer is 'False'.

Question 11

Project teams characterize risk by impact and likelihood. Which quadrant is high impact and high likelihood?

Select one:
a. Major
b. Critical
c. Minor
d. Major

The correct answer is: Critical

Question 12

True or False: In this diagram the activity production phase 1 can begin before specify requirements has completed.

Select one:
True
False
The correct answer is 'False'.

Question 13

How many types in "FIGURE 9-27 Types of Process Dependency Connections?"
Select one:
a. One
b. Two
c. Three
d. Five

The correct answer is: Five

Question 14

True or False: The scope triangle is NOT also called the quality triangle.
Select one:
True
False
The correct answer is 'False'.

Question 15

True or False: The product or project can be accepted even if acceptance testing is not complete.
Select one:
True
False
The correct answer is 'False'.

Question 16

Which of the following is NOT a major phase of information engineering?
Select one:
a. Enterprise Analysis
b. Business Area Analysis
c. Business System Analysis
d. Construction

The correct answer is: Business System Analysis

Question 17

The R in CRUD matrix stands for:
Select one:
a. Repeat
b. Return
c. Report
d. Retrieve

The correct answer is: Retrieve

Question 18

True or False: Information systems methodology framework is NOT used to compare methodologies.
Select one:
True
False
The correct answer is 'False'.

Question 19er functioning.
Select one:
True
False
The correct answer is 'True'.

Question 20

The Base Metrics include all the following except:
Select one:
a. Access Vector
b. Authentication
c. Confidentiality, Integrity, Availability
d. Confidentiality, Integrity, Availability Impacts
The correct answer is: Confidentiality, Integrity, Availability

Question 21

True or False: The means to store unlimited, continuously growing databases currently are called data marts.
Select one:
True
False
The correct answer is 'False'.

Question 22

The major activities of structured design are all except:
Select one:
a. Develop program specifications
b. Transform or transaction analysis of DFD
c. Define the logical database
d. Refine and complete structure chart

The correct answer is: Define the logical database

Question 23

Two methods of analyzing methodology classes are:
Select one:
a. Information systems methodology framework
b. Humphrey's maturity framework
c. Information systems methodology framework and Humphrey's maturity framework
d. None of these
The correct answer is: Information systems methodology framework and Humphrey's maturity framework

Question 24

Based on this diagram return on investment (ROI) will be reached:

Select one:
a. 1 year
b. 2 years
c. 3 years
d. None of the above

The correct answer is: None of the above

Question 25

FIGURE 7-3 Sample Data Flow Diagram depicts data flowing from Process 2.0 to:
Select one:
a. File B
b. Process 3.0
c. Entity Name 1
d. Process 2.0

The correct answer is: Entity Name 1

Question 26

A __________work product is a product that is considered complete and that is the basis for other, current work by the project development team.
Select one:
a. Baseline
b. Change request
c. checklist
d. Change Control File

The correct answer is: Baseline

Question 27

Horizontal (or Subset) Data Partitioning:
Select one:
a. Complete 'records' or tuples of data are stored with different data in more than one location.
b. Data are copied in more than one location.
c. Partial 'records' or tuples of data are stored in more than one location.
d. Different data are completely stored in more than one location.
Some data may be accessed by remote sites.

The correct answer is: Partial 'records' or tuples of data are stored in more than one location.

Question 28

Software engineers are involved in these activities in which correct order:
Select one:
a. Development, operation, maintenance or retirement
b. Operation, development, retirement and maintenance
c. Development, operation, maintenance and retirement
d. Operation, development, maintenance and retirement

The correct answer is: Development, operation, maintenance and retirement

Question ing process.
Select one:
True
False
The correct answer is 'False'.

Question 30

An important part of the maintainability is to make all which of the following available:
Select one:
a. Project documentation
b. Design documentation
c. Supporting material
d. All of the above

The correct answer is: All of the above

Question 31

____ are input data created to demonstrate that both components and the total system satisfy all design requirements.
Select one:
a. Test plan
b. Test strategy
c. Test cases
d. Subsystem testing

The correct answer is: Test e:
a. Document the priority for the action, and the cost and schedule of the change
b. The PM and SE define the schedule and cost.
c. The PM and SE redefine the schedule and the cost.
d. impacts of the change document the priority for the action, and the cost and schedule of the change.

The correct answer is: impacts of the change document the priority for the action, and the cost and schedule of the change.

Question 33

The specific activities in structured systems analysis:
Select one:
a. Develop a context diagram
b. Optionally, develop a state-transition diagram if building an on-line or real-time application
c. Develop a structured data dictionary
d. Develop a set of balanced data flow diagrams

The correct answer is: Develop a structured data dictionary

Question 34

True or False: CASE tools can ONLY be used in single user versions and NOT multiuser.
Select one:
True
False
The correct answer is 'False'.

Question 35

Figure 7-3 Sample Data Flow Diagram depicts data flowing from Process 2.0 to:
Select one:
a. File B
b. Process 3.0
c. Entity Name 1
d. Process 2.0

The correct answer is: EntiZ; �UZ; �U�� �UO� �UxZ; �U0Z; �U@0Z; �Ul.
Select one:
True
False
The correct answer is 'False'.

Question 37

Table III-3 discusses all but:
Select one:
a. Document
b. Review
c. Coding
d. Identification

The correct answer is: Coding

Question 38

The critical path of a project is defined as:
Select one:
a. Shortest sequence of dependent tasks to project completion.
b. The sequence of dependent tasks that together take the most time. If any of the tasks are delayed, the project is also delayed
c. The sequence of dependent tasks that together take the least time. If any of the tasks are delayed, the project can complete on time.
d. Longest sequence of dependent tasks to project completion.

The correct answer is: The sequence of dependent tasks that together take the most time. If any of the tasks are delayed, the project is also delayed

Question 39

Which is NOT a phase of project lifecycle (PLC)?
Select one:
a. Analysis and Design
b. Project Initiation
c. System Retirement
d. Preparation for Software Engineering

The correct answer is: System Retirement

Question 40

The process diagram defines the hardware environment and shows process assignments to software.
Select one:
True
False
The correct answer is 'False'.

Question 41

True or False: Threat is the likelihood or frequency of a harmful event occurring.
Select one:
True
False
The correct answer is 'True'.

Question 42

The Goal of 3NF Is to:
Select one:
a. Remove Repeating Groups
b. Remove Partial Key Dependencies
c. Remove Non-Repeating Groups
d. Remove Nonkey Dependencies Program code

The correct answer is: Remove Nonkey Dependencies Program code

Question 43

True or False: In a required relationship, the entity must be present for the other entity to exist. In an optional relationship, the entity must be present for the other entity to exist.
Select one:
True
False
The correct answer is 'True'.

Question 44

See Table 13-2; which methodology does not require Data Relationships knowledge?
Select one:
a. Process
b. Data
c. Object
d. None of the above
The correct answer is: Process

Question 45

The results of structured design are all BUT the following:
Select one:
a. programming specifications
b. plans for testing
c. conversation
d. training and installation

The correct answer is: conversation

Question 46

Which goal is stated in a clear and concise manner and more likely to inspire team members to achieve it?
Select one:
a. “To deliver the cheapest system, in the shortest time, that just about gets the job done”
b. “To deliver the best sales and marketing system on the market”
c. “To deliver the cheapest system, in the shortest time, that almost gets the job done”
d. “To deliver a sales and marketing system on time”

The correct answer is: “To deliver the best sales and marketing system on the market”

Question 47

Project Managers must exhibit all these qualities except:
Select one:
a. Understanding
b. Trust
c. Budgeting
d. Empathy

The correct answer is: Budgeting

Question 48

Temporal Metrics include all but the following except:
Select one:
a. Environmental Metrics
b. Collateral Damage Potential (CDP)
c. Remediation Level (RL)
d. Report Confidence (RC)
The correct answer is: Environmental Metrics

Question 49

True or False: Software engineering is the systematic application of tools and techniques in the development of computer-based applications.
Select one:
True
False
The correct answer is 'True'.

Question 50

"TABLE 8-9 CASE Tools for Structured Design Program" code include all but:

Select one:
a. The Developer
b. Maestro
c. Oracle
d. Analyst/Designer Toolkit

The correct answer is: Oracle
Which is NOT a phase of project lifecycle (PLC)?
Select one:
a. Analysis and Design
b. Project Initiation
c. System Retirement
d. Preparation for Software Engineering

The correct answer is: System Retirement

Question 2

True or False: Software engineering is the systematic application of tools and techniques in the development of computer-based applications.
Select one:
True
False
The correct answer is 'True'.

Question 3

Useful tools for software engineers DO NOT include:
Select one:
a. process dependencies
b. synchronization matrix
c. process hierarchies
d. object diagrams.

The correct answer is: synchronization matrix

Question 4

Software engineers are involved in these activities in which correct order:
Select one:
a. Development, operation, maintenance or retirement
b. Operation, development, retirement and maintenance
c. Development, operation, maintenance and retirement
d. Operation, development, maintenance and retirement

The correct answer is: Development, operation, maintenance and retirement

Question 5

True or False: Data requirements for applications include: input, output, storage, and retrieval.
Select one:
True
False
The correct answer is 'True'.

Question 6

True or False: The systems engineer provides organizational expertise while the project manager provides technical expertise.
Select one:
True
False
The correct answer is 'False'.

Question 7

The _______ supports and sells the goals of the project throughout the organization:
Select one:
a. Project Manager
b. Sponsor
c. Champion
d. User

The correct answer is: Champion

Question 8

A __________ is written by the PM and the SE and used to advertise a project to vendors to bid on.
Select one:
a. Bidding document
b. Project request
c. Request for bid
d. Request for proposal (RFP)

The correct answer is: Request for proposal (RFP)

Question 9

The video store case study in chapter 2 includes requirements for customer, video and ___________.
Select one:
a. Rental Processing
b. Software
c. Hardware
d. Networks

The correct answer is: Rental Processing

Question 10

The critical path of a project is defined as:
Select one:
a. Shortest sequence of dependent tasks to project completion.
b. The sequence of dependent tasks that together take the most time. If any of the tasks are delayed, the project is also delayed
c. The sequence of dependent tasks that together take the least time. If any of the tasks are delayed, the project can complete on time.
d. Longest sequence of dependent tasks to project completion.

The correct answer is: The sequence of dependent tasks that together take the most time. If any of the tasks are delayed, the project is also delayed
Table III-3 discusses all but:
Select one:
a. Document
b. Review
c. Coding
d. Identification

The correct answer is: Coding

Question 2

True or False: Identification does not refer to both Analysis and Design.
Select one:
True
False
The correct answer is 'False'.

Question 3

A Structured Walk-Through does not include this work product:
Select one:
a. Program code
b. Programmer
c. Test plan
d. Test design

The correct answer is: Programmer

Question 4

True or False: Computer-aided software engineering (CASE) tools automate the hardware engineering process.
Select one:
True
False
The correct answer is 'False'.

Question 5

Figure 7-3 Sample Data Flow Diagram depicts data flowing from Process 2.0 to:
Select one:
a. File B
b. Process 3.0
c. Entity Name 1
d. Process 2.0

The correct answer is: Entity Name 1

Question 6

True or False: The code validation file has the validation role for Process 1.2.
Select one:
True
False
The correct answer is 'False'.

Question 7

The specific activities in structured systems analysis:
Select one:
a. Develop a context diagram
b. Optionally, develop a state-transition diagram if building an on-line or real-time application
c. Develop a structured data dictionary
d. Develop a set of balanced data flow diagrams

The correct answer is: Develop a structured data dictionary

Question 8

True or False: Figure 7-9 Example of Complex Context Diagram describes a inflows context called patients claims processing.
Select one:
True
False
The correct answer is 'True'.

Question 9

The Data Dictionary Process Contents does not include:
Select one:
a. Process Data
b. Process ID Number
c. Constraints (e.g., concurrence, sequential with another process, time-out, etc.)
d. Process Name

The correct answer is: Process Data
Which of the following is NOT a major phase of information engineering?
Select one:
a. Enterprise Analysis
b. Business Area Analysis
c. Business System Analysis
d. Construction

The correct answer is: Business System Analysis

Question 2

True or False: The two major activities of data modeling are the creation and refinement of an enemy-relationship diagram (ERD) and entity structure analysis.
Select one:
True
False
The correct answer is 'False'.

Question 3

"FIGURE 9-7 ABC Video Partial Functional Decomposition of Purchasing" is a:
Select one:
a. Program code
b. Process flow
c. Function
d. Data flow

The correct answer is: Process flow

Question 4

True or False: In a required relationship, the entity must be present for the other entity to exist. In an optional relationship, the entity must be present for the other entity to exi
The Goal of 3NF Is to:
Select one:
a. Remove Repeating Groups
b. Remove Partial Key Dependencies
c. Remove Non-Repeating Groups
d. Remove Nonkey Dependencies Program code

The correct answer is: Remove Nonkey Dependencies Program code

Question 6

True or False: In "FIGURE 9-17 ABC Rental Processing-First-Cut Entity-Relationship Diagram," the three entities are: Customer, Video, Rental and Request.
Select one:
True
False
The correct answer is 'False'.

Question 7

In "FIGURE 9-24 Decomposition for Customer and Video Maintenance Remove Repeating Groups," which processes are decomposed?
Select one or more:
a. Rental/Return
b. Accounting
c. Purchasing
d. Personnel / payroll

The correct answer is: Rental/Return, Purchasing

Question 8

How many types in "FIGURE 9-27 Types of Process Dependency Connections?"
Select one:
a. One
b. Two
c. Three
d. Five

The correct answer is: Five

Question 9

True or False: Both ADW and IEF are CASE tools.
Select one:
True
False
The correct answer is 'True'.

Question 10

The R in CRUD matrix stands for:
Select one:
a. Repeat
b. Return
c. Report
d. Retrieve

The correct answer is: Retrieve
Potential distribution of the application. The specific activities in structured systems analysis:
Select one:
a. Develop a context diagram
b. Optionally, develop a state-transition diagram if building an on-line or real-time application
c. Develop a structured data dictionary
d. Develop a set of balanced data flow diagrams

The correct answer is: Develop a structured data dictionary

Question 2

Horizontal (or Subset) Data Partitioning:
Select one:
a. Complete 'records' or tuples of data are stored with different data in more than one location.
b. Data are copied in more than one location.
c. Partial 'records' or tuples of data are stored in more than one location.
d. Different data are completely stored in more than one location.
Some data may be accessed by remote sites.

The correct answer is: Partial 'records' or tuples of data are stored in more than one location.

Question 3

The Goal of 3NF Is to:
Select one:
a. Remove Repeating Groups
b. Remove Partial Key Dependencies
c. Remove Non-Repeating Groups
d. Remove Nonkey Dependencies Program code

The correct answer is: Remove Nonkey Dependencies Program code

Question 4

The video store case study in chapter 2 includes requirements for customer, video and ___________.
Select one:
a. Rental Processing
b. Software
c. Hardware
d. Networks

The correct answer is: Rental Processing

Question 5

Useful tools for software engineers DO NOT include:
Select one:
a. process dependencies
b. synchronization matrix
c. process hierarchies
A Structured Walk-Through does not include this work product:
Select one:
a. Program code
b. Programmer
c. Test plan
d. Test design

The correct answer is: Programmer

Question 7

True or False: Cohesion is a measure of the external strength of a module with the notion that maximal, or functional, cohesion is the goal.
Select one:
True
False
The correct answer is 'False'.

Question 8

True or False: Identification does not refer to both Analysis and Design.
Select one:
True
False
The correct answer is 'False'.

Question 9

True or False: Data requirements for applications include: input, output, storage,ion 10

True or False: Both ADW and IEF are CASE tools.
Select one:
True
False
The correct answer is 'True'.

Question 11

True or False: Software engineering is the systematic application of tools and techniques in the development of computer-based applications.
Select one:
True
False
The correct answer is 'True'.

Question 12

True or False: The systems engineer provides organizational expertise while the project manager provides technical expertise.
Select one:
True
False
The correct answer is 'False'.

Question 13

True or False: In a required relationship, the entity must be present for the other entity to exist. In an optional relationship, the entity must be present for the other entity to exist.
Select one:
True
False
The correct answer is 'True'.

Question 14

True or False: The code validation file has the validation role for Process 1.2.
Select one:
True
False
The correct answer is 'False'.

Question 15

True or False: Computer-aided software engineering (CASE) tools automate the hardware engineering process.
Select one:
True
False
The correct answer is 'False'.

Question 16

Table III-3 discusses all but:
Select one:
a. Document
b. Review
c. Coding
d. Identification

The correct answer is: Coding

Question 17

In "FIGURE 9-24 Decomposition for Customer and Video Maintenance RemZ; �UZ; �U�� �UO� �UxZ; �U0Z; �U@0Z; �Ubr /> b. Accounting
c. Purchasing
d. Personnel / payroll

The correct answer is: Rental/Return, Purchasing

Question 18

True or False: Data-oriented methods assume that, since data are unstable and processes are, data should be the main focus of activities.
Select one:
True
False
The correct answer is 'False'.

Question 19

True or False: Program specifications document the program's purpose, process requirements, the logical and physical data definitions, input and output formats, screen layouts, constraints, and special processing considerations that might complicate the program.
Select one:
True
False
The correct answer is 'True'.

Question 20

Which of the following is NOT a major phase of information engineering?
Select one:
a. Enterprise Analysis
b. Business Area Analysis
c. Business System Analysis
d. Construction

The correct answer is: Business System Analysis
An _______ is an entity from the real world whose processes and attributes (that is, the data) are modeled in a computerized application.
Select one:
a. abstract data type (ADT)
b. Class/objects
c. Object
d. class

The correct answer is: Object

Question 2

True or False: Encapsulated Objects can have both Public or Private Parts.
Select one:
True
False
The correct answer is 'False'.

Question 3

The Project Manager’s job is to:
Select one:
a. Must understand the customer requirements for the team and keep the SE’s on track.
b. Leads the design, coding and testing effort. Decides which process to use (data, or object oriented design) and directs and reviews the SE2 products.
c. Leads the team and is responsible for the final product quality and timeliness.
d. Documents the figures, diagrams for process, data, or object oriented design.
e. Constructs schedule and milestones and keeps the PM informed and on schedule.

The correct answer is: Leads the team and is responsible for the final product quality and timeliness.

Question 4

True or False: Computer-aided software engineering (CASE) tools automate the hardware engineering process.
Select one:
True
False
The correct answer is 'False'.

Question 5

A Structured Walk-Through does not include which work product?
Select one:
a. Program code
b. Programmer
c. Test plan
d. Test design

The correct answer is: Programmer

Question 6

True/False: Object oriented design has seven steps.
Select one:
True
False

The response was correct.
The correct answer is 'True'.

Question 7

Table 12-1 Object-Oriented Design Documentation; how many (tables and diagrams):
Select one:
a. 3,3
b. 4,3
c. 4,4
d. 3,4

The correct answer is: 3,4

Question 8

The process diagram defines the hardware environment and shows process assignments to software.
Select one:
True
False

The correct answer is 'False'.

Question 9

See Figure 12-17; Which subdomain is responsible for service objects such as Define logical data access control and application presentation.
Select one:
a. Data.
b. Human.
c. Software.
d. Hardware/Operating System.

The correct answer is: Data.

Question 10

True/False: Booch diagram are used to summarize the objects-both application and service - and their interactions.
Select one:
True
False

Your answer was correct.
The correct answer is 'True'.
A ____ test is performed for each of the smallest units of code?
Select one:
a. Regression
b. System
c. Integration
d. Unit

The correct answer is: Unit

Question 2

True or False: White-box testing evaluates specific execute item logic to guarantee its proper functioning.
Select one:
True
False
The correct answer is 'True'.

Question 3

____ are input data created to demonstrate that both components and the total system satisfy all design requirements.
Select one:
a. Test plan
b. Test strategy
c. Test cases
d. Subsystem testing

The correct answer is: Test cases

Question 4

The purpose of the system test is:
Select one:
a. demonstrate an application's ability to operate satisfactorily in the actual production environment using its intended hardware and software configuration.
b. is a system test and NOT a documentation test.
c. test to demonstrate an application's ability to operate satisfactorily in a simulated production environment using its intended hardware and software configuration.
d. ensure that the changes do not cause the application to regress to a nonfunctional state, that is, that the changes do not introduce errors into the processing.

The correct answer is: test to demonstrate an application's ability to operate satisfactorily in a simulated production environment using its intended hardware and software configuration.

Question 5

True or False: The purpose of the regression test is to ensure that the changes cause the application to regress to a functional state, that is, that the changes do introduce errors into the processing.
Select one:
True
False
The correct answer is 'False'.

Question 6

True or False: There are three basic types of business programs: report, edit/validate, and file update.
Select one:
True
False
The correct answer is 'True'.

Question 7

Boilerplate code means that the code:
Select one:
a. does vary from one program to another
b. is critical to maintaining applications at the functional level rather than at the code level.
c. does not vary from one program to another
d. meaning not changeable after it is accepted as complete, motivates users to be as complete in their thinking as possible

The correct answer is: does not vary from one program to another

Question 8

A __________work product is a product that is considered complete and that is the basis for other, current work by the project development team.
Select one:
a. Baseline
b. Change request
c. checklist
d. Change Control File

The correct answer is: Baseline

Question 9

The purpose of the Sample Change Request Impact Form:
Select one:
a. Document the priority for the action, and the cost and schedule of the change
b. The PM and SE define the schedule and cost.
c. The PM and SE redefine the schedule and the cost.
d. impacts of the change document the priority for the action, and the cost and schedule of the change.

The correct answer is: impacts of the change document the priority for the action, and the cost and schedule of the change.

Question 10

Restructuring is:
Select one:
a. the redevelopment of a portion of an application with a bridge to the old application.
b. is the reverse analysis of an old application to conform to a new methodology, usually Information Engineering or object orientation.
c. is also known as reverse engineering. Rebuilding is the retirement and redevelopment of an application.
d. the redevelopment of an application with a bridge to the old application.

The correct answer is: the redevelopment of a portion of an application with a bridge to the old application.
Jenkins (2005) stated that the critical path is defined as:
Select one:
a. It is this path that you can traverse in order to reach completion of your project on time
b. It is this path that you must traverse in order to reach completion of your project on time
c. The critical path represents the ideal set of tasks to be complete for your project
d. The critical path represents a set of tasks to be complete for your project

The correct answer is: It is this path that you must traverse in order to reach completion of your project on time

Question 2

True or False: The scope triangle is NOT also called the quality triangle.
Select one:
True
False
The correct answer is 'False'.

Question 3

Jenkins (2005) listed the mythical man month diagram how many interfaces exist for a 5 person project.
Select one:
a. 1
b. 3
c. 6
d. 10

The correct answer is: 6

Question 4

True or False: Scope encompasses your vision, but NOT your goal.
Select one:
True
False
The correct answer is 'False'.

Question 5

Which goal is stated in a clear and concise manner and more likely to inspire team members to achieve it?
Select one:
a. “To deliver the cheapest system, in the shortest time, that just about gets the job done”
b. “To deliver the best sales and marketing system on the market”
c. “To deliver the cheapest system, in the shortest time, that almost gets the job done”
d. “To deliver a sales and marketing system on time”

The correct answer is: “To deliver the best sales and marketing system on the market”

Question 6

True or False: Sometimes referred to as a ‘business case’, the project proposal states the lowest level goals in a project.
Select one:
True
False
The correct answer is 'False'.

Question 7

Based on this diagram return on investment (ROI) will be reached:

Select one:
a. 1 year
b. 2 years
c. 3 years
d. None of the above

The correct answer is: None of the above

Question 8

All listed below are examples of stakeholders with the exception of:
Select one:
a. End user
b. Programmer
True or False: Traceability is proven at test or implementation time and validates that a requirement has been satisfied.
Select one:
True
False
The correct answer is 'True'.

Question 10

The list below are useful terms in expressing requirements specifications and can be abbreviated to stand for:

Select one:
a. START
b. STOP
c. SMART
d. None of the above

The correct answer is: SMART
True or False: The product or project can be accepted even if acceptance testing is not complete.
Select one:
True
False
The correct answer is 'False'.

Question 2

True or False: The purpose of a project plan is to maintain control of a project.
Select one:
True
False
The correct answer is 'True'.

Question 3

True or False: Traceability is proven at test or implementation time and validates that a requirement has been satisfied.
Select one:
True
False
The correct answer is 'True'.

Question 4

True/False: Object oriented design has seven steps.
Select one:
True
False

The response was correct.
The correct answer is 'True'.

Question 5

The purpose of the system test is:
Select one:
a. demonstrate an application's ability to operate satisfactorily in the actual production environment using its intended hardware and software configuration.
b. is a system test and NOT a documentation test.
c. test to demonstrate an application's ability to operate satisfactorily in a simulated production environment using its intended hardware and software configuration.
d. ensure that the changes do not cause the application to regress to a nonfunctional state, that is, that the changes do not introduce errors into the processing.

The correct answer is: test to demonstrate an application's ability to operate satisfactorily in a simulated production environment using its intended hardware and software configuration.

Question 6

____ are input data created to demonstrate that both components and the total system satisfy all design requirements.
Select one:
a. Test plan
b. Test strategy
c. Test cases
d. Subsystem testing

The correct answer is: Test cases

Question 7

A Structured Walk-Through does not include which work product?
Select one:
a. Program code
b. Programmer
c. Test plan
d. Test design

The correct answer is: Programmer

Question 8

True or False: Scope encompasses your vision, but NOT your goal.
Select one:
True
False
The correct answer is 'False'.

Question 9

Which of the following is NOT an element of a project plan:
Select one:
a. What location is involved
b. When it needs to be done by
c. Who is to do it
d. How it is to be achieved

The correct answer is: What location is involved

Question 10

Jenkins (2005) sn order to reach completion of your project on time
b. It is this path that you must traverse in order to reach completion of your project on time
c. The critical path represents the ideal set of tasks to be complete for your project
d. The critical path represents a set of tasks to be complete for your project

The correct answer is: It is this path that you must traverse in order to reach completion of your project on time

Question 11

True or False: Sometimes referred to as a ‘business case’, the project proposal states the lowest level goals in a project.
Select one:
True
False
The correct answer is 'False'.

Question 12

An important part of the maintainability is to make all which of the following avng material
d. All of the above

The correct answer is: All of the above

Question 13

A ____ test is performed for each of the smallest units of code?
Select one:
a. Regression
b. System
c. Integration
d. Unit

The correct answer is: Unit

Question 14

The process diagram defines the hardware environment and shows process assignments to software.
Select one:
True
False

The correct answer is 'False'.

Question 15

Restructuring is:
Select one:
a. the redevelopment of a portion of an application with a bridge to the old application.
b. is the reverse analysis of an old application to conform to a new methodology, usually Information Engineering or object orientation.
c. is also known as reverse engineering. Rebuilding is the retirement and redevelopment of an application.
d. the redevelopment of an application with a bridge to the old application.

The correct answer is: the redevelopment of a portion of an application with a bridge to the old application.

Question 16

Based on this diagram return on investment (ROI) will be reached:

Select one:
a. 1 year
b. 2 years
c. 3 years
d. None of the above

The correct answer is: None of the above

Question 17

True or False: Encapsulated Obje`D> �U`D> �U��� �U�}� �U�D> �U�D> �U@�D> �Ur is 'False'.

Question 18

Boilerplate code means that the code:
Select one:
a. does vary from one program to another
b. is critical to maintaining applications at the functional level rather than at the code level.
c. does not vary from one program to another
d. meaning not changeable after it is accepted as complete vary from one program to another

Question 19

An _______ is an entity from the real world whose processes and attributes (that is, the data) are modeled in a computerized application.
Select one:
a. abstract data type (ADT)
b. Class/objects
c. Object
d. class

The correct answer is: Object

Question 20

In the following development project schedule what is the deliverable for the acceptance testing phase:

Select one:
a. Project proposal
b. Requirements Spec
c. Alpha
d. Release system

The correct answer is: Release system
See Table 13-1; which methodology requires human interface guidelines?
Select one:
a. Process
b. Data
c. Object
d. None of the above
The correct answer is: Object

Question 2

True or False: Information systems methodology framework is NOT used to compare methodologies.
Select one:
True
False
The correct answer is 'False'.

Question 3

See Table 13-1; which methodology requires Business Entity Analysis?
Select one:
a. Process
b. Data
c. Object
d. None of the above
The correct answer is: Data

Question 4

True or False: The Humphrey's maturity frameworks were developed for the Department of Defense as a self-assessment framework that identifies levels of computing and application development process maturity.
Select one:
True
False
The correct answer is 'True'.

Question 5

See Table 13-2; which methodology does not require Data Relationships knowledge?
Select one:
a. Process
b. Data
c. Object
d. None of the above
The correct answer is: Process

Question 6

According to Table 13-5; Which methodology is MOST predictable and consistent:

Select one:
a. Process
b. Data
c. Object
d. None of the above
The correct answer is: Data

Question 7

True or False: CASE tools can ONLY be used in single user versions and NOT multiuser.
Select one:
True
False
The correct answer is 'False'.

Question 8

Legacy Systems are in what phase?
Select one:
a. design
b. installation
c. operations
d. maintenance
The correct answer is: maintenance

Question 9

True or False: The means to store unlimited, continuously growing databases currently are called data marts.
Select one:
True
False
The correct answer is 'False'.

Question 10

Two methods of analyzing methodology classes are:
Select one:
a. Information systems methodology framework
b. Humphrey's maturity framework
c. Information systems methodology framework and Humphrey's maturity framework
d. None of these
The correct answer is: Information systems methodology framework and Humphrey's maturity framework
Which of the following is NOT a group of CVSS?
Select one:
a. Base
b. Temporal
c. Environmental
d. Human

Question 2

True or False: The Temporal group reflects the intrinsic qualities of a vulnerability.
Select one:
True
False

Question 3

The Common Vulnerability Scoring System (CVSS) is an open framework that addresses what issue?
Select one:
a. Identifying and assessing vulnerabilities across many disparate software platforms
b. Identifying and assessing vulnerabilities across many disparate hardware platforms
c. Identifying and assessing vulnerabilities across many disparate hardware and software platforms
d. None of the above

Question 4

See Figure 2: CVSS Metrics and Equations. Which values are considered optional when reflecting the risk posed by the vulnerability to a user's environment?
Select one:
a. Base metrics plus vector
b. Temporal metrics
c. Environmental metrics
d. B and C

Question 5

True or False: Vulnerability is a bug, flaw, weakness, or exposure of an application, system, device, or service that could lead to a failure of confidentiality, integrity, or availability.
Select one:
True
False

Question 6

True or False: Threat is the likelihood or frequency of a harmful event occurring.
Select one:
True
False

Question 7

True or False:Risk is the relative impact that an exploited vulnerability would have to a user's environment.
Select one:
True
False

Question 8

Temporal Metrics include all but the following except:
Select one:
a. Environmental Metrics
b. Collateral Damage Potential (CDP)
c. Remediation Level (RL)
d. Report Confidence (RC)

Question 9

Environmental Metrics include all the following except:
Select one:
a. Collateral Damage Potential (CDP)
b. Target Distribution (TD)
c. Security Requirements (CR, IR, AR)
d. Temporal vector's

Question 10

The Base Metrics include all the following except:
Select one:
a. Access Vector
b. Authentication
c. Confidentiality, Integrity, Availability
d. Confidentiality, Integrity, Availability Impacts
The Data Dictionary Process Contents does not include:
Select one:
a. Process Data
b. Process ID Number
c. Constraints (e.g., concurrence, sequential with another process, time-out, etc.)
d. Process Name

The correct answer is: Process Data

Question 2

True or False: In "FIGURE 9-17 ABC Rental Processing-First-Cut Entity-Relationship Diagram," the three entities are: Customer, Video, Rental and Request.
Select one:
True
False
The correct answer is 'False'.

Question 3

Which goal is stated in a clear and concise manner and more likely to inspire team members to achieve it?
Select one:
a. “To deliver the cheapest system, in the shortest time, that just about gets the job done”
b. “To deliver the best sales and marketing system on the market”
c. “To deliver the cheapest system, in the shortest time, that almost gets the job done”
d. “To deliver a sales and marketing system on time”

The correct answer is: “To deliver the best sales and marketing system on the market”

Question 4

The major activities of structured design are all except:
Select one:
a. Develop program specifications
b. Transform or transaction analysis of DFD
c. Define the logical database
d. Refine and complete structure chart

The correct answer is: Define the logical database

Question 5

True or False: Threat is the likelihood or frequency of a harmful event occurring.
Select one:
True
False
The correct answer is 'True'.

Question 6

True or False: In a required relationship, the entity must be present for the other entity to exist. In an optional relationship, the entity must be present for the other entity to exist.
Select one:
True
False
The correct answer is 'True'.

Question 7

The Base Metrics include all the following except:
Select one:
a. Access Vector
b. Authentication
c. Confidentiality, Integrity, Availability
d. Confidentiality, Integrity, Availability Impacts
The correct answer is: Confidentiality, Integrity, Availability

Question 8

There are five rules of scheduling; which of the following is NOT one of them:
Select one:
a. Eliminate uncertainty wherever you can
b. Pick the right level of granularity
c. Take a vacation
d. Analyst/Designer Toolkit

The correct answer is: Take a vacation

Question 9

The purpose of the Sample Change Request Impact Form:
Select one:
a. Document the priority for the action, and the cost and schedule of the change
b. The PM and SE define the schedule and cost.
c. The PM and SE redefine the schedule and the cost.
d. impacts of the change document the priority for the action, and the cost and schedule of the change.

The correct answer is: impacts of the change document the priority for the action, and the cost and schedule of the change.

Question 10

See Table 13-1; which methodology requires human interface guidelines?
Select one:
a. Process
b. Data
c. Object
d. None of the above
The correct answer is: Object

Question 11

True or False: Data requirements for applications include: input, output, storage, and retrieval.
Select one:
True
False
The correct answer is 'True'.

Question 12

True or False: In many projects the change management system is NOT linked to (or is part of) a defect tracking.
Select one:
True
False
The correct answer is 'False'.

Question 13

____ are input data created to demonstrate that both components and the total system satisfy all design requirements.
Select one:
a. Test plan
b. Test strategy
c. Test cases
d. Subsystem testing

The correct answer is: Test cases

Question 14

True/False: Object oriented design has seven steps.
Select one:
True
False

The response was correct.
The correct answer is 'True'.

Question 15

True or False: Sometimes referred to as a ‘business case’, the project proposal states the lowest level goals in a project.
Select one:
True
False
The correct answer is 'False'.

Question 16

"FIGURE 9-7 ABC Video Partial Functional Decomposition of Purchasing" is a:
Select one:
a. Program code
b. Process flow
c. Function
d. Data flow

The correct answer is: Process flow

Question 17

The results of structured design are all BUT the following:
Select one:
a. programming specifications
b. plans for testing
c. conversation
d. training and installation

The correct answer is: conversation

Question 18

True or False: The product or project can be accepted even if acceptance testing is not complete.
Select one:
True
False
The correct answer is 'False'.

Question 19

True or False: Program specifications document the program's purpose, process requirements, the logical and physical data definitions, input and output formats, screen layouts, constraints, and special processing considerations that might complicate the program.
Select one:
True
False
The correct answer is 'True'.

Question 20

Restructuring is:
Select one:
a. the redevelopment of a portion of an application with a bridge to the old application.
b. is the reverse analysis of an old application to conform to a new methodology, usually Information Engineering or object orientation.
c. is also known as reverse engineering. Rebuilding is the retirement and redevelopment of an application.
d. the redevelopment of an application with a bridge to the old application.

The correct answer is: the redevelopment of a portion of an application with a bridge to the old application.

Question 21

The critical path of a project is defined as:
Select one:
a. Shortest sequence of dependent tasks to project completion.
b. The sequence of dependent tasks that together take the most time. If any of the tasks are delayed, the project is also delayed
c. The sequence of dependent tasks that together take the least time. If any of the tasks are delayed, the project can complete on time.
d. Longest sequence of dependent tasks to project completion.

The correct answer is: The sequence of dependent tasks that together take the most time. If any of the tasks are delayed, the project is also delayed

Question 22

The Project Manager’s job is to:
Select one:
a. Must understand the customer requirements for the team and keep the SE’s on track.
b. Leads the design, coding and testing effort. Decides which process to use (data, or object oriented design) and directs and reviews the SE2 products.
c. Leads the team and is responsible for the final product quality and timeliness.
d. Documents the figures, diagrams for process, data, or object oriented design.
e. Constructs schedule and milestones and keeps the PM informed and on schedule.

The correct answer is: Leads the team and is responsible for the final product quality and timeliness.

Question 23

True or False: The Temporal group reflects the intrinsic qualities of a vulnerability.
Select one:
True
False
The correct answer is 'False'.

Question 24

The purpose of the system test is:
Select one:
a. demonstrate an application's ability to operate satisfactorily in the actual production environment using its intended hardware and software configuration.
b. is a system test and NOT a documentation test.
c. test to demonstrate an application's ability to operate satisfactorily in a simulated production environment using its intended hardware and software configuration.
d. ensure that the changes do not cause the application to regress to a nonfunctional state, that is, that the changes do not introduce errors into the processing.

The correct answer is: test to demonstrate an application's ability to operate satisfactorily in a simulated production environment using its intended hardware and software configuration.

Question 25

True or False: Information systems methodology framework is NOT used to compare methodologies.
Select one:
True
False
The correct answer is 'False'.

Question 26

The video store case study in chapter 2 includes requirements for customer, video and ___________.
Select one:
a. Rental Processing
b. Software
c. Hardware
d. Networks

The correct answer is: Rental Processing

Question 27

Which of the following is NOT a group of CVSS?
Select one:
a. Base
b. Temporal
c. Environmental
d. Human
The correct answer is: Human

Question 28

True or False: The systems engineer provides organizational expertise while the project manager provides technical expertise.
Select one:
True
False
The correct answer is 'False'.

Question 29

See Figure 2: CVSS Metrics and Equations. Which values are considered optional when reflecting the risk posed by the vulnerability to a user's environment?
Select one:
a. Base metrics plus vector
b. Temporal metrics
c. Environmental metrics
d. B and C
The correct answer is: B and C

Question 30

Potential distribution of the application. The specific activities in structured systems analysis:
Select one:
a. Develop a context diagram
b. Optionally, develop a state-transition diagram if building an on-line or real-time application
c. Develop a structured data dictionary
d. Develop a set of balanced data flow diagrams

The correct answer is: Develop a structured data dictionary

Question 31

Jenkins (2005) stated that the critical path is defined as:
Select one:
a. It is this path that you can traverse in order to reach completion of your project on time
b. It is this path that you must traverse in order to reach completion of your project on time
c. The critical path represents the ideal set of tasks to be complete for your project
d. The critical path represents a set of tasks to be complete for your project

The correct answer is: It is this path that you must traverse in order to reach completion of your project on time

Question 32

True or False: Identification does not refer to both Analysis and Design.
Select one:
True
False
The correct answer is 'False'.

Question 33

True or False: Traceability is proven at test or implementation time and validates that a requirement has been satisfied.
Select one:
True
False
The correct answer is 'True'.

Question 34

The R in CRUD matrix stands for:
Select one:
a. Repeat
b. Return
c. Report
d. Retrieve

The correct answer is: Retrieve

Question 35

An _______ is an entity from the real world whose processes and attributes (that is, the data) are modeled in a computerized application.
Select one:
a. abstract data type (ADT)
b. Class/objects
c. Object
d. class

The correct answer is: Object

Question 36

A Structured Walk-Through does not include this work product:
Select one:
a. Program code
b. Programmer
c. Test plan
d. Test design

The correct answer is: Programmer

Question 37

See Table 13-2; which methodology does not require Data Relationships knowledge?
Select one:
a. Process
b. Data
c. Object
d. None of the above
The correct answer is: Process

Question 38

How many types in "FIGURE 9-27 Types of Process Dependency Connections?"
Select one:
a. One
b. Two
c. Three
d. Five

The correct answer is: Five

Question 39

"TABLE 8-9 CASE Tools for Structured Design Program" code include all but:

Select one:
a. The Developer
b. Maestro
c. Oracle
d. Analyst/Designer Toolkit

The correct answer is: Oracle

Question 40

Project teams characterize risk by impact and likelihood. Which quadrant is high impact and high likelihood?

Select one:
a. Major
b. Critical
c. Minor
d. Major

The correct answer is: Critical

Question 41

True or False: There are three basic types of business programs: report, edit/validate, and file update.
Select one:
True
False
The correct answer is 'True'.

Question 42

True or False: The means to store unlimited, continuously growing databases currently are called data marts.
Select one:
True
False
The correct answer is 'False'.

Question 43

The list below are useful terms in expressing requirements specifications and can be abbreviated to stand for:

Select one:
a. START
b. STOP
c. SMART
d. None of the above

The correct answer is: SMART

Question 44

True or False: Figure 7-9 Example of Complex Context Diagram describes a inflows context called patients claims processing.
Select one:
True
False
The correct answer is 'True'.

Question 45

The Data Dictionary Process Contents does not include:
Select one:
a. Process Data
b. Process ID Number
c. Constraints (e.g., concurrence, sequential with another process, time-out, etc.)
d. Process Name

The correct answer is: Process Data

Question 46

Project Managers must exhibit all these qualities except:
Select one:
a. Understanding
b. Trust
c. Budgeting
d. Empathy

The correct answer is: Budgeting

Question 47

Useful tools for software engineers DO NOT include:
Select one:
a. process dependencies
b. synchronization matrix
c. process hierarchies
d. object diagrams.

The correct answer is: synchronization matrix

Question 48

The specific activities in structured systems analysis:
Select one:
a. Develop a context diagram
b. Optionally, develop a state-transition diagram if building an on-line or real-time application
c. Develop a structured data dictionary
d. Develop a set of balanced data flow diagrams

The correct answer is: Develop a structured data dictionary

Question 49

Figure 7-3 Sample Data Flow Diagram depicts data flowing from Process 2.0 to:
Select one:
a. File B
b. Process 3.0
c. Entity Name 1
d. Process 2.0

The correct answer is: Entity Name 1

Question 50

True or False: The Humphrey's maturity frameworks were developed for the Department of Defense as a self-assessment framework that identifies levels of computing and application development process maturity.
Select one:
True
False
The correct answer is 'True'.

 